Professional Engineering (PMP)
π Analytical overview of Telegram channel Professional Engineering (PMP)
Channel Professional Engineering (PMP) in the Central Khmer language segment is an active participant. Currently, the community unites 12 453 subscribers, ranking 15 758 in the Education category and 425 in the Cambodia region.
π Audience metrics and dynamics
Since its creation on Π½Π΅Π²ΡΠ΄ΠΎΠΌΠΎ, the project has demonstrated rapid growth, gathering an audience of 12 453 subscribers.
According to the latest data from 07 October, 2026, the channel demonstrates stable activity. Although there has been a change in the number of participants by -59 over the last 30 days and by -2 over the last 24 hours, overall reach remains high.
- Verification status: Not verified
- Engagement rate (ER): The average audience engagement rate is 19.21%. Within the first 24 hours after publication, content typically collects 11.94% reactions from the total number of subscribers.
- Post reach: On average, each post receives 0 views. Within the first day, a publication typically gains 1 487 views.
- Reactions and interaction: The audience actively supports content: the average number of reactions per post is 0.
π Description and content policy
The author describes the resource as a platform for expressing subjective opinions:
βhttps://t.me/+TnW0vZLbGT8zNzRlβ
Thanks to the high frequency of updates (latest data received on 08 October, 2026), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Education category.
Data loading in progress...
| Date | Subscriber Growth | Mentions | Channels | |
| 07 October | 0 | |||
| 06 October | 0 | |||
| 05 October | 0 | |||
| 04 October | 0 | |||
| 03 October | 0 | |||
| 02 October | 0 | |||
| 01 October | 0 |
| 2 | π―π―π― α ααααααα·α
ααααααα·αααΎααα·αααααααΉα αααα’αααααααααααα
ααααααααΉα α αΎαααΈαα·αααααΉαα
αααααααααα
αα»αα₯αααααα....
αα»αααααΉαβ Drama ααααααΌααα·α αα·αααααΆαααααα½αα―αα’ααααΆαα
αααΆααααΆ ααΎαααΆααααΆ ααΎαα
ααααΆαα’αααΈ α αΎαααααΌαα
αΆααααααΎααααααααααΆα
αααα½αα’ααααΆαααα’αΌαααα’αααΎααΈαα·ααα½αααΆαααααΆα αααααααααα·ααΈαααααααΆα αααααααΎαααααΈαα·α ααΆααΆαα’αααα»ααα·αααααΏαα’αα·αααααΆαα | 938 |
| 3 | π―π―π― αααααΆααΆαα·ααΆααααα
Method Statement ααααΆαααΆαα
α»ααααα
αα α αΎααααααΆααααα’αΌαα αααα
ααααΆαααααα
αααα’αΆα
ααααΎααΆαααααΆααααααααΆαααα‘αααααΆαααΆααααααα
ααα‘αααααΆαα @pitouvoek | 1 453 |
| 4 | No text... | 1 361 |
| 5 | π―π―π― αααα»ααααα»ααααα
α Specification αα
αα
αααααααΆαααΆααααααααΆααα’αα ααΆααΆααΆααΆαα· ααΎααααΈαα»αααΆα―αααΆαα’αααα·αααααααααΆαααααααααΆαα―αααΆαααααΌαααΆα ααΎααααΈαααα
α’αα»ααααααΆαααΆααα
αααα»ααααααααααααααααααααα
α―αααΆααααααΉααααα
αΌααα
αα
αααααααΆαααΆαααΆα
αααΎααααααΆααααΆαααΆα Structure ααΆααααααΉααα
αα
αααααα’αα»ααααααΆαααΆαα’ααααααΌααααααααΆ αα·αααααααΆαα’ααααααΆαα·α | 1 462 |
| 6 | No text... | 1 438 |
| 7 | No text... | 1 381 |
| 8 | π―π―π― αα·αααΌαααααααααααααΆααααααΉαα
α‘. ααΆαα»ααΌα Concrete Shrinkage
α’. ααΆαα»ααΌα Concrete Creep
α£. ααααααααΌα αα·αααααΆαα·α
αααααααΆααααα αααααΆαααααα»αα’αΆαα | 1 516 |
| 9 | π―π―π― αα·ααα’αΌαααααααααααααΈ ααααααααααααΏαααααα»ααααα»αα’αΆαα - Reinforce Concrete Structure !!! | 1 461 |
| 10 | π―π―π― ααααΆαααααα»ααααα
ααααααΌαα αααα·ααΆαααααΆαααΆαααααΎααΌα
ααααΆ ααααΆαααααααα·α
ααΌα
ααααΆα αΎαααααΆααααα αααα»αααΎααα·αααΆααααΈαα
ααααΎα ααααααααααα α αΎααα·ααΆαααΌααααΈααααααααα
α»ααααααα·ααααΆαααα»αααααααααααΈβ¦.
ααΎαααααΎαααΎαααααΌααα½ααααα αΎα α αΎαααΎα
ααααααααααα
ααααΎα’αααΈααααα ααααΆαααΆααααααααΆααΌα
ααααΆ α αΎααα½αααΆααα·αααααααααα β¦. αααα’αααΈαααα·ααΆαααα α αΎαααααΎα’αααΈααΆαααααα·ααΆα ααΎααΎααα·αα
αααΆααααΆααααΆαα½αααΆβ¦
αααα’ααα
αααΆαα ααααΎα’αααααα’α·α ααΆααα
α·αααα’ααααααα α αΎααααααααΎααααΆα ααααααα½ααααα»αααααΎβ¦. | 1 753 |
| 11 | π―π―π― αα·ααα’αΌαααααααΆααααααΉααα
αα
αααααααααΆαααΆα " αααααΆαααααααΈ CBP- Concrete Bored Pile "
Concrete Bored Pile (CBP) α¬α α
αααααΆααααααΆ Secant Concrete Wall ααΆαααααααααααΆαααααααΈαααααΆα αααααααΌαααΆαααααΎααααΆααααααΆααααΆαααααααααααααΈ αα·αααΆααααΏαααααα»αααΆαααααααααΈ ααααΆααααΆαααΆααααααΆαααααααααΈ - Basement Floor α
CBP ααααΌαααΆαααααΎα‘αΎαααΆαααααααααΉααααα
- Deep Foundation αααααΆααα½αααααααααΆ αα·αααααΌαααΆαααααΆααα
αΌαααααΆαααααααΉααααα½α αααα’αααααααααΆ Cap Beam α
αααααΆαααααααΈ CBP ααααΌαααΆαααααΎαααΎαααααααααΎααααΆααααααΆααααΆαααΆααααααΆαααααααααΈ ααααΆααααααααααΌα
ααΆααααααα
β
αααααΆααααΈααΆααααααααααααααααΆαα - Weak Soil or Sand
β
ααΆαααααααααΈααΆαα
αααΎαααΆαα ααααααααΆαα’ααααΆαααΈαααΈααΆααααα
αααα
β
ααααΆααααααααΆααα
αααΎααααααααααα»ααα·αααΈααΆαααααααα
β
αααααααΆααααααΆαααΆαααΆαααααΎααααΆαααααααΆαααααααΈααα Diaphragm Wall | 1 639 |
| 12 | π―π―π― PROJECT PLANNING:
Project Planning ααΊααΆααΆααααα
αααΌααααααΆααααααα ααααααα»αααααα½αααΆα:
β
1. αααααΆαααααααααααα (Project Master Schedule)
β
2. αααααΆαα α·ααααααααα» (Budget Planning):
- αααααΆααααααααααααΆαα
αααΆα (Operation and Expense Cost)
- αααααΆαα
αααΌα (IPC)
β
3. αααααΆααααααΆααααααΎααααΆαα (Procurement Plan)
β
4. αααααΆααααααΆαααααααα (Manpower Planning)
β
5. ααΆααααααααααααααΎαααΆαααΆαααααααααα (Construction Tracking Operation)
β
6. ααΆααααα
α Catch Up Plan
β
7. ααΆααααα
αα―αααΆαααααΆααααΆαα’αα»αααααααααα (Document Preparation and Control)
αα·αα
ααα»α
ααααΆααααααααα!!! | 1 533 |
| 13 | π―π―π― From One Day to Day One !!!
α
αΌαα
αΆααααααΎαααααΎααααΆαααααααααΆααααααααΈαα½ααα’ααααΆααααααααααααα»α αααααΎαααΉααααααα
ααΆαααΌαααααΈααααααααΆααααΆααααααΎααα
ααααααΆαα½α !!!
α
αΆααααααΎαααααΎααΆααΈααααααΈ 1 (One Day) α αΎαααααΎααΆαα αΌααααα’ααααααααα
ααααα
αα
ααααααΆαα½α (Day One).... | 1 683 |
| 14 | No text... | 2 172 |
| 15 | No text... | 2 214 |
| 16 | π―π―π― ααΆαααα‘αΎααααααααΉααααααα Spun Pile α’αΆα
ααααΎαα
ααΆα α€ ααααα’αΆααααααα
ααΉα ααααααααΈ, αααααα αα·αααα ααααααααΉα, ααααα»αααααΆ, ααΈααΆααααααα, ααααα·αααααα αα·ααααααααααα»ααα·αααΆαααααΆαα
β
αα·ααΈααΈ α‘α Static Hydraulic Press-in / Jacking Method
β
αα·ααΈααΈ α’α Impact Hammer Driving Method
β
αα·ααΈααΈ α£α Vibratory Driving Method
β
αα·ααΈααΈ α€α Bored / Pre-drilling + Spun Pile Installation | 1 877 |
| 17 | π―π―π― αα·αααΆα
ααα½ααααααΆα ααααα αΎα ααΎααΆαααααΎα’αααΈαααααααααΆαααΆαααΈαα
αααΎαααααααα½αα―αα αΎα α¬αα
? αα·αα’αΈαα ααΎαα·αααΆααα
αΆααααααΎα ααααΌαα
αΆααααααΎαααααααα α αΎαα₯ααΌαααα αααααΆααααΈα’αΆα Status αααα
αα !!!
ααΆααα·αααααααα ααΆααΎαααΆαα
ααα»α
αααααα’αααΈ αααααααΆααα½ααααααΉα α αΎααααααΈα’αααΈ αααααΎαααααα α¬ααααααΆα.... !!!
αααααΆααααΈααΉαααΆ ααΎααααα α¬αααααα’αααΈ α
αΌαα
αΆααααααΎααααααΉαα
ααα»α
ααα... ααααα’αααΈ αααααααα αα·αα
ααα’αααΈβ α
αΆααααααΎααααααΈααα !!!
αααααΉα α αΎαααααΌααααααααΉαααΆαααααα !!! | 1 918 |
| 18 | π―π―π― αααα»ααααα»ααααα
αα―αααΆααα
αα
αααααααΆαααΆα (Work Specification) ααΆααααααΉαααΆαααΆαααααΏαααααα»α ααΆααΆααΆααααα αααααΆαααα·αααα·α αα·ααα·ααααα α’αΆα
αααα
ααααΎααααΆαααααααΆααααΆαααΆααααααααΆααααααα ααΆαααααααΉααα·αααααααΆαααααΆα αα αΌααααααααΆααααααααααααααααααααα
α―αααΆααααααΉαα
ααα
αΆααα
ααααααα αααααΆααααΈαααα»αααΆααααα
ααα½α
ααΆααα | 2 187 |
| 19 | π―π―π―α―αααΆα Checklist αααααΆααααΆαααΆαααααΆααα αααααααΌαααααΎαααα»αααΆαααΎαααΆαααααΆα !!! | 2 412 |
| 20 | π―π―π― αα·ααα’αΌααααααααΎαααααα α―αααΆαααααΆααα αααααααΌαααΆαα
αΆαααΆα
ααααααΆααααααΎαααΆαααααΆααααααααααααΆαααααΆα !!! | 2 342 |
