Professional Engineering (PMP)
π Analytical overview of Telegram channel Professional Engineering (PMP)
Channel Professional Engineering (PMP) in the Central Khmer language segment is an active participant. Currently, the community unites 12 411 subscribers, ranking 16 407 in the Education category and 437 in the Cambodia region.
π Audience metrics and dynamics
Since its creation on Π½Π΅Π²ΡΠ΄ΠΎΠΌΠΎ, the project has demonstrated rapid growth, gathering an audience of 12 411 subscribers.
According to the latest data from 27 October, 2026, the channel demonstrates stable activity. Although there has been a change in the number of participants by -62 over the last 30 days and by -2 over the last 24 hours, overall reach remains high.
- Verification status: Not verified
- Engagement rate (ER): The average audience engagement rate is 18.26%. Within the first 24 hours after publication, content typically collects 10.51% reactions from the total number of subscribers.
- Post reach: On average, each post receives 2 266 views. Within the first day, a publication typically gains 1 304 views.
- Reactions and interaction: The audience actively supports content: the average number of reactions per post is 20.
π Description and content policy
The author describes the resource as a platform for expressing subjective opinions:
βhttps://t.me/+TnW0vZLbGT8zNzRlβ
Thanks to the high frequency of updates (latest data received on 28 October, 2026), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Education category.
Loading data
| Date | Subscriber Growth | Mentions | Channels | |
| 28 October | 0 | |||
| 27 October | 0 | |||
| 26 October | 0 | |||
| 25 October | 0 | |||
| 24 October | +1 | |||
| 23 October | 0 | |||
| 22 October | +1 | |||
| 21 October | 0 | |||
| 20 October | 0 | |||
| 19 October | 0 | |||
| 18 October | 0 | |||
| 17 October | 0 | |||
| 16 October | +1 | |||
| 15 October | 0 | |||
| 14 October | 0 | |||
| 13 October | 0 | |||
| 12 October | 0 | |||
| 11 October | 0 | |||
| 10 October | 0 | |||
| 09 October | 0 | |||
| 08 October | 0 | |||
| 07 October | 0 | |||
| 06 October | 0 | |||
| 05 October | 0 | |||
| 04 October | 0 | |||
| 03 October | 0 | |||
| 02 October | 0 | |||
| 01 October | 0 |
| 2 | +1 π§Ώπ§Ώπ§Ώ αααααΆαααααααααΆααααα
α Calculation Note ααααΆαααΈααααΆαααααΉααααα»αα’αΆααα ααΆαααααααΆα EC2 ααααΆααααααΉαααααΌααααααΆααααΆααααα»αααΆαα α£ ααααααααΆααΊα Bending Moment+Shear Force+Torsion | 2 799 |
| 3 | π―π―π― αααααΆαααα
αααα·ααα’αΌαααααααααααααααααα»αααααΆααααΎα
ααααααΉααααααααααΆααααα»ααααααααΆαααααααΆα Eurocode αααααΆααααα’αΌαααα·αααα·α αααα
αΌααααα»α Channel Telegram αααα»αααααααααΆααααα
ααααααα·ααααΆαααααα !!! | 2 585 |
| 4 | π―π―π― αααααΆαααα
αααα·ααα’αΌαααααααααααααααααα»αααααΆααααΎα
ααααααΉααααααααααΆααααα»ααααααααΆαααααααΆα Eurocode αααααΆααααα’αΌαααα·αααα·α αααα
αΌααααα»α Channel Telegram αααα»αααααααααΆααααα
ααααααα·ααααΆαααααα !!! | 1 |
| 5 | π―π―π― αααααΆαα·ααα’αΌααααααααΆααααααΉαααααα QA/QC !!! | 2 653 |
| 6 | π§Ώπ§Ώπ§Ώ αα»ααααα
αΆααααααΎαααΎαααΆαααααΆαααΆα αααααΆααααααα (Project Manager) ααααΌαααααΆαααΆααααα
ααααααΆααααααα’α·α αα·αα
αααΆααααΆαααα½αα
ααα½α ααΎααααΈααΆααααα½ααααααΆαα’αα»αααααααααα ααααααααααααααα
ααΆααααα
ααααααΆααααααα ααααΌαααααΆααααααααΆαααααααααΆαααααα»αααΆαααααΎααΆα ααααα·αααΎαααααΆαααΆααααααα·αααααΌαααΆααααα
ααααα
αααΆααααΆαα αααα’α·α αα·αααααΉαααααΌαααααα αααα αΆααΆα
αααΎαααΉαααΎαααΆαα
αΆααααΆααααΈαααααΎαααΆαααααΆα αα αΌαααααα·ααααα
ααααααααα
αααααΆαααΆααααααα½αααΆαα
1. Scope Management Plan
2. Schedule Management Plan
3. Change Management Plan
4. Requirement Management Plan
5. Cost Management Plan
6. Quality Management Plan
7. Resource Management Plan
8. Communication Management Plan
9. Risk Management Plan
10. Procurement Management Plan
11. Stakeholder Management Plan | 2 438 |
| 7 | π―π―π― αααααααΉααααααΉα α
αΌαααααΆααααΏααα·αααααΆαα’ααααΆαα
αααΎα αα·αααα’α’ααααΆαα
αααΎα ααααΎα’αΆααααααα’αααααααααααΆα αααα αΆαα·αα
ααα
αααα αα»αααααΆαααΎαααα½αα―αααα ..... !!!
αααααααααααΌααααααααα
αααα αα·ααααα·ααααααααααα α
ααα’αααΈααααα ααααΎα’αααΈααααα ααααα·αααΌαααΈαα
αααΎα ααΈαα·ααα·ααΆααα
αα»α..... αααααα»αααΆααααΉαα
α·ααα αααα
ααααααΆααααα½αα―αα‘αΎααα·α ααααα α¬αααααααααααΌαα’αααΈ αααααΆααΆααααααααααααΎα ααααααααααΆααΎαααΉααααααααΆααα....!!!
ααααΆααΆαααΉαααΆααααα½αα―αα’ααααΆαα
αααΎααααα»α !!! | 2 172 |
| 8 | π―π―π― ααΎααααΈα’αααααα»αα αα»αααΆαααααα½αα’αΆα
αααααααααααααααααΆααααααΆαααα’ ααααΌα
ααΆααααααααααααα»αα αα»ααααααα’ααααΆαααΆαααΈαα
ααααΎααα
αα»αααΆααααΆαα ααΆαααΆααααα
αα―αααΆαααΈααααααΉαααΆα αα·αααααααααααααααααααΈαα½αα αααα’αααααααααΆ STANDARD OPERATION PROCEDURE (SOP) ααΊααΆαα·αααΆααΆαααΆααααααΆααααααΆαα α αΎαααΆααΆα
ααα»α
α’αΆαα·ααΆααα»ααα ααααααα»αα αα»αααΆααααααααΌαααΆα αα·ααααα
αα
αααααΆααα
αααα»ααααα»αα αα»αααααααα½αααααΌααααα
αα
αααΎαααααα αααααΆααααΆαααααααααα αα·αααΉαααΆααααα»αα αα»α αα·αααααααα’ααααΆαααααΎαααΆαααα’αα
αα»α ααΆααααα
α SOP ααααααΌαααΆαα
αααΎαααααααα
ααΆααααααααΈαα½ααααααααα
ααααΎααΆααααα»ααααα»αα αα»α αααααΆαααααααααααααααααα SOP ααααΉαααααΌα αααααΎαααΉαααα½αααΆαααΌαα
ααααααΉα ααααααααααααΆαααααΎααΆαααααΉαααααΌα αα·αααααααααααα½ααα»αααααΌαααΎααααααα·α
αα
αααααααα½α !!! | 2 965 |
| 9 | π―π―π― ααΆαααΆααααααΆαα Basement αααααΆαααααΎααααΆαααααααΆαααααααΈαααααα CBP !!!
CBP αααααααΈααΆααααααααΆ " Concrete Bored Pile " ααΊααΆαααααααααααΆαααααααΈαααααΆα αααααααΌαααΆαααααΎααααΆαα ααΎααααΈααΆαααΆααααΆαααααααααΈ " Basement Construction " α
β
ααΆαααααΎααααΆαα CBP α’αΆα
ααααΎα’αααααα
ααααΆαααΆααααααΆαα Basement ααΆααααα
αααα
αα·ααα·ααααααΆαααααααΆααααααΎα α¬ααααααααα»αα’αα‘α»ααααααααΆαααΆααααα
β
αααααΈααΆααΆααα»αααααααααααααααααα ααα’αα‘α»ααααααααΆαααΈαααΈααΆαααα Basement ααααααααα»αααΉααααα αΆα
αααΎαααααα ααΆαα·ααα ααΆαααααΆααααΈαα CBP αααααΆααα Lateral Pressure ααααααΈ αααααΆααα·αααα ααΆαααα
ααΎ CBP α
β
αααΆαααΆαα·α ααααααααααααααα½α (Strut Bracing Systems) ααααααΌαααΆαααΈααααΆαααΎααααΈαααααΉαααααααααααα
ααΎ CBP ααΎααααΈααΆαααααααααΌα Displacementα
β
αααα αΆαααααααα αααααααααα½αααααα ααΊααα
ααααΆαααΉααα
α
ααααα CBP αααα»αα’αα‘α»ααααααΆαααΈ αααααΆααα·αααΆαααααΎααααΆαα Pile Grouting ααΆαααααΉαααααΌα α¬ αα·αααααααααα
α | 2 376 |
| 10 | π―π―π― αα»αααααΌαααααα
ααΉαααΆααααα ααααα
ααΈαα·ααα½ααααΆαααΆααααααααΆα
αααΎα ααΎααααααΆαααΆ α αΎαααΎααΎαααΆα 50% α αΎα α
αΌααααααα»αααΆαααΆαα½αααΆααα..... ααααααΆαααα½α αααααααΆααααααΎαααααΉαααααα α αΎαααααΌαααΏααΆααααΎ Process Of Life.... | 2 038 |
| 11 | π―π―π― αααααΆααααααα·ααα’αΌ αα·ααΆαα’αααΈ " ααΌαααααΆαααααΉαααααααΆα QS " ααααααα»ααα·ααα’αΌααα αααα»ααααααααΎα
ααα»α
αααααααΆααααα½αα
ααα½αααΊ:
π² ααΈ1: αα»ααααα·ααααααα αα·ααααααα·ααΈααααΆαααααααΆααααααΆααQS ααΆαααΌα
ααΆ:
A. COMMUNICATION SKILL
B. ANALYTICS SKILL
C. PROJECT MANAGEMENT SKILL
D. INTERPERSONAL SKILL
E. ATTENTION TO DETAIL SKILL
F. IT SKILL
G. NUMERACY SKILL
π² ααΈ2: ααααΆαααααα αα·αααΆαααααΎααΆαααααααα QS ααΆαα½αααΆααΈααα
π² ααΈ 3: ααΆααααα
αα―αααΆα BOQ
π² ααΈ4: ααΆααααααααααααα―αααΆα BOQ ααααΆαααααααα
π² ααΈ5: αααααααΌαααααΆαααααΉαααα―αααΆα BOQ
π² ααΈ 6: ααΆααααα’α·αααΆαααΆααααααα - Work Breakdown
π§Ώπ§Ώπ§Ώ α
αΌαααααΎααΆα Review αα·ααα’αΌαααα’α·α ααΎααααΈααα½αααΆαααΌαα
ααααααΉααααααα !!! | 2 736 |
| 12 | π―π―π― ααΆαααααααααααααααααα½αααΆαααα’ ααΊααΆαααΆαααΆαααααααααααααααααααα½αααααααΉαααααΌα αααααΆααααα
αααΌααααααααααΆαααααΆα
αααΎα ααΎααααΈααΉαααΆαααααΎαααΆαααΆαααΆαααα’α
PROJECT MANAGEMENT ααΊααΆα
ααααααΉααα½αααααααΆαα αααααΆαααααα
αααααααααααΆαααααΆα/αααααααα½αααααααααααΆαααααααα αααααααα½ααααα
ααααααααααα ααΊααααΌαααΆααααααΆαααααααΆααα
ααα½α α€ ααΊα
β
α‘. αααα
ααααΆαααααααααΆ [SCHEDULE]
β
α’. αααα
ααααααα»αααΆα [QUALITY]
β
α£. αααα
ααααααα»ααααα·ααΆα [SAFETY]
β
α€. αααα
αααααααΆαα
αααα [SAVING/PROFIT]
ααΎααααΌαααααΎααΌα
ααααα
ααΎααααΈααα½αααΆαααΌαα
ααα»α
ααΆαα α€ ααΆαααΎ? αααα αΎα αααααΆαααΆαα’αααααΉαααΆαααααααααααΌαααΆααααααααΆα αα·αα
ααααααΉαααααααααΎαααααααααααααααααααααααα’ααααΆαα
αααΆααααΆααα
αααααΆααααΆααααααααααααααα, ααΆααΌαα
, ααΎαααααΌααααααααααααΆαααααα αα·ααααα
ααα
ααΆαααααΆααααααΆααα (ααΌα
ααΌαααΆα αααααΆαααα
αΆααααΆαααΎ) ααααα½αααΆαα
1. Tender Document (α―αααΆαααααααααααααα)
2. Contract (αα·α
αα
αααααΆ)
3. Scheduleβ (ααΆααα·ααΆααααααα)
4. Submission (ααΆααααααΌαα―αααΆα)
5. Tracking (ααΆαααΆαααΆα αα·αααΆαααααααααα)
6. Reports (ααΆααααα
ααααΆαααΆααα)
7. Chart (ααΆαα»αααααα»ααααα·ααααααααααααΆαααααΆα)
8. Drawing (ααααααα·α
αα
αααααΆ)
9. Drawing for Site Construction (ααααααααα’α·ααααααΆααααΆαααΆαααα)
10. Site Inspection (ααΆααααα
ααααα½ααα·αα·αααααΆαααΆαααΆαααααΆα)
11. Sub-Contract (α―αααΆαααΆααααααΉααααα»αααα
ααΆααααα)
12. IPC (α―αααΆαααααΎαααΌααΆαααα»α)
13. Quotation (α―αααΆαααααααααααΆαα)
14. BoQ (ααΆααΆαααα·ααΆα αα·αααααααααααα)
15. Purchase (α―αααΆαααΆααααααΉαααΆααααααΆαα·α)
16. Site Photo (ααΌαααααααΎαααΆαααΆαααΆαααααΆα)
17. Utilities
18. Permit (α
αααΆαα αα·ααααααΆαααααααααααΆααααααΉααααααα)
19. Safety (ααααααα»ααααα·ααΆααααααα)
20. Document from Client (α―αααΆαααα½αααΆαααΈααα
αΆαααααααα)
21. Document from Consultant (α―αααΆαααα½αααΆαααΈααααααααααααααΉααααΆαααααα)
22. Site Progress (α―αααΆαααΆααααααΉααααααα α¬ααααΎαααΆαααΆαααΆαααΆαααααΆα) | 2 188 |
| 13 | π―π―π― α ααααααα·α
ααααααα·αααΎααα·αααααααΉα αααα’αααααααααααα
ααααααααΉα α αΎαααΈαα·αααααΉαα
αααααααααα
αα»αα₯αααααα....
αα»αααααΉαβ Drama ααααααΌααα·α αα·αααααΆαααααα½αα―αα’ααααΆαα
αααΆααααΆ ααΎαααΆααααΆ ααΎαα
ααααΆαα’αααΈ α αΎαααααΌαα
αΆααααααΎααααααααααΆα
αααα½αα’ααααΆαααα’αΌαααα’αααΎααΈαα·ααα½αααΆαααααΆα αααααααααα·ααΈαααααααΆα αααααααΎαααααΈαα·α ααΆααΆαα’αααα»ααα·αααααΏαα’αα·αααααΆαα | 2 006 |
| 14 | π―π―π― αααααΆααΆαα·ααΆααααα
Method Statement ααααΆαααΆαα
α»ααααα
αα α αΎααααααΆααααα’αΌαα αααα
ααααΆαααααα
αααα’αΆα
ααααΎααΆαααααΆααααααααΆαααα‘αααααΆαααΆααααααα
ααα‘αααααΆαα @pitouvoek | 2 435 |
| 15 | No text... | 2 128 |
| 16 | π―π―π― αααα»ααααα»ααααα
α Specification αα
αα
αααααααΆαααΆααααααααΆααα’αα ααΆααΆααΆααΆαα· ααΎααααΈαα»αααΆα―αααΆαα’αααα·αααααααααΆαααααααααΆαα―αααΆαααααΌαααΆα ααΎααααΈαααα
α’αα»ααααααΆαααΆααα
αααα»ααααααααααααααααααααα
α―αααΆααααααΉααααα
αΌααα
αα
αααααααΆαααΆαααΆα
αααΎααααααΆααααΆαααΆα Structure ααΆααααααΉααα
αα
αααααα’αα»ααααααΆαααΆαα’ααααααΌααααααααΆ αα·αααααααΆαα’ααααααΆαα·α | 2 261 |
| 17 | No text... | 2 027 |
| 18 | No text... | 1 959 |
| 19 | π―π―π― αα·αααΌαααααααααααααΆααααααΉαα
α‘. ααΆαα»ααΌα Concrete Shrinkage
α’. ααΆαα»ααΌα Concrete Creep
α£. ααααααααΌα αα·αααααΆαα·α
αααααααΆααααα αααααΆαααααα»αα’αΆαα | 2 139 |
| 20 | π―π―π― αα·ααα’αΌαααααααααααααΈ ααααααααααααΏαααααα»ααααα»αα’αΆαα - Reinforce Concrete Structure !!! | 1 989 |
