Eagle Civil Engineering 🇪🇹
Engineers should Think outside of the box!!! Let's just soar like an Eagle 🦅
Більше380
Підписники
Немає даних24 години
-37 днів
-630 днів
- Підписники
- Перегляди допису
- ER - коефіцієнт залучення
Триває завантаження даних...
Приріст підписників
Триває завантаження даних...
Фото недоступнеДивитись в Telegram
Bole International Airport, Addis Ababa, Ethiopia 🇪🇹.
Bole Airport is the busiest airport on the African continent! A flight lands or takes off every 2 minutes 24/7, including all night long.
@Eagleng
#Answer
👉1. Rails: Long, straight metal bars that form the running surface for trains to travel on.
2. Sleepers (or ties): Horizontal supports that hold the rails in place and distribute the weight of the train to the underlying ground.
3. Ballast: Layer of crushed stone or gravel placed underneath the sleepers to provide stability, drainage, and support for the track.
4. Fasteners: Various components such as clips, bolts, or spikes used to secure the rails to the sleepers.
5. Rail joints: Sections where two rail ends are connected together to form a continuous track.
6. Rail pads: Elastic pads placed between the rails and sleepers to dampen vibrations and reduce noise.
7. Turnouts (or switches): Special track components that allow trains to change from one track to another.
8. Level crossings: Intersections where railway tracks cross roads or pathways, often equipped with barriers, lights, and bells for safety.
9. Rail anchors: Devices used to prevent longitudinal movement of the rails, helping to maintain track stability.
10. Crossovers: Track arrangements that enable trains to move from one track to another without conflicting with other train movements.
11. Buffer stops: Safety devices located at the end of tracks to prevent trains from accidentally running off the end of the line.
12. Track circuits: Electrical systems used for train detection and signaling purposes.
13. Overhead wires (catenary system): Used in electrified railways to supply power to electric trains through pantographs.
14. Insulated joints: Used to electrically isolate sections of the track, preventing interference with signaling and control systems.
15. Track drainage systems: Infrastructure designed to manage water runoff and prevent flooding or erosion of the track bed.
@Eagleng
👍 1
Фото недоступнеДивитись в Telegram
ኢራቅ ከነዳጅ ዘይት የምታገኘውን ገቢ ቀስ በቀስ በመሠረተ ልማት ላይ ማዋል ጀምራለች።
ኢርቢል በተባለ በኢራቅ የኩርዲስታን ግዛት ውስጥ የተገነባው ዘመናዊ ፈጣን መንገድ በብዙዎች አድናቆት የተቸረው ነው።
Via:infraethiopia
@Eagleng
Фото недоступнеДивитись в Telegram
Digital Vernier v/s manual Vernier least count
@Eagleng
❤ 1
Why Discharge Valve is closed before starting the Centrifugal Pump ?
Do you list Construction Equipment and Roles list with their roles.
@Eagleng