🤚ጥያቄ? ይሳተፉ! ምሽት ላይ!
ተ.ቁ/37 @Consite🏗
37) What is the water-cement ratio if 200 liters of water is used for 400 kg of cement?
VACANCY- Site Forman 👷♂🏗
💫Bachelor's Degree in Civil Engineering or in a related field of study with relevant work experience
Duties & Responsibilities:
- Carry out site activities according to company quality standards.
- Supervise and coordinate the work of crew members
- Ensure that all work is completed safely and to specifications
- Inspect materials and equipment to ensure they are in good working condition
- Set up and operate equipment
- Maintain accurate records and documentation and report all work
- Quanitity Required: 1
- Minimum Years Of Experience: #0_years
- Maximum Years Of Experience: #3_years
Salary: 10000.00
Deadline: March 29, 2025
📩How To Apply: Apply using Telegram @Applyhere16
Contractor's Obligations Under the Design and Build Contract🏗
💫The contractor's fundamental obligations under the Design and Build Contract include:
🚧Carrying Out and Completing the Works*: The contractor must complete the works, including design, in accordance with the contract.
🚧Compliance with Contract Documents*: The contractor must comply with the contract documents, construction phase plan, and statutory requirements.
🚧Quality and Standards*: Where applicable, the contractor must use materials and workmanship of the specified quality and standards.
Design Team Responsibilities
Post-contract, the design team is the responsibility of the contractor. The design team may be:
- Selected by the Contractor*: The contractor selects the design team, which may have provided advice and support during the tender stage.
- Novated to the Contractor: The design team is novated to the contractor upon their appointment or soon after.
Once novated, the design team becomes the sole responsibility of the contractor to manage.
Employer's 'Shadow' Design Team
Occasionally, the employer may retain a 'shadow' design team, such as an architect, engineer, or other discipline, to provide support throughout the project.
Employer's Agent Role
The employer's agent is not responsible for telling the contractor what to design or how to design it. Instead, their role is to:
- Check Contractor Compliance*: Ensure the contractor complies with their contractual obligations.
- Monitor and Report: Monitor the contractor's progress and report to the employer as necessary.
የጥገና ሥራ (Maintenance of defects) እና ጥገና የሚከናወንበት አስገዳጅ ጊዜ🏗
🚧አንድ ተቋራጭ በተሰጠው ዲዛይን መሰረት ገንብቶ የማስረከብ ግዴታ ያለበት መሆኑ የሚታወቅ ሲሆን ከጊዜያዊ ርክክብ እስከ መጨረሻ ርክክብ ድረስ ያለው ጊዜ የብልሽት (እክል) መለያ ጊዜ (defect liability period) የሚባል ሆኖ አሠሪው ባለቤት ሥራዎቹን ለመጨረሻ ጊዜ ከመረከቡ በፊት አገልግሎት እየሰጠበት ሳለ ሁሉም ሥራዎች በአግባቡ መሠራታቸውን ለመመርመር የሚያስችለው ጊዜ ሲሆን ርዝማኔው በውላቸው ላይ የሚወሰን መሆኑን የፍ/ህ/ቁ 3276 እስከ 3277 ድንጋጌ አስቀምጧል።
በድንጋጌው መሰረት ሥራ ተቋራጩ በጊዜያዊ ርክክብ ለባለቤቱ ሳያስረክብ ከፍተኛ በሆነ ኃይል ምክንያት መፈራረስ ወይም ጉዳት ቢደርስበት ኪሳራው የሥራ ተቋራጩ ስለሆነ ከርክክብ በፊት ጥገና ማከናወን አለበት።
በፍ/ሕ/ቁጥር 3278 (2) መሰረት ሥራ ተቋራጩ ከአሠሪው መሥሪያ ቤት /ባለቤት/ እንዲያድሳት የሚያስፈልገው ሥራ ተመልክቶ እንዲያድስለት ትእዛዝ በደረሰው ጊዜ የማደስ ግዴታ አለበት (ሥራ ተቋራጩ የእክል መለያ ጊዜ ውስጥ ከሆነ ከአንድ ጊዜ በላይ የእድሳት ትእዛዝ ሊሰጠው የሚችል ሲሆን እየተመላለሰ ሊያድስ የሚችልበት አስገዳጅ ሁኔታ ነው)።
ይህ የጥገና ጊዜ በፍ/ሕ/ቁ 3277 (2) መሰረተ በውል የሚወሰን እንዲሆን የተፈቀደ ሲሆን ብዙ የሀገራችን የግንባታ ውሎች ስድስት ወር (6 Months) እና አንድ ዓመት (1 year) የመጠቀም ልምድ አላቸው።
ተቋራጩ ከእያንዳንዱ ክፍያው ላይ 5% የጥገና መያዣ እየተቀነሰ የሚከፈለው ሲሆን በጊዜያዊ ርክክብ ሰዓት ግማሹ (ማለትም 2.5%) ይመለስለታል።
ነገር ግን 2.5% ክፍያው የብልሽት መለያ ጊዜ እስኪጠናቀቅ ድረስ አሠሪው ባለቤት የሚይዘው ሲሆን ጥገና በሚያስፈልግበት ሰዓት ጥገናውን ለማከናወኑ መያዣ ነው።
ሥራ ተቋራጪ ጥገናውን የማያከናውን ከሆነ ለጥገና ማሠሪያ የሚውል ገንዘብ ሲሆን ለተቋራጩ ተመላሽ አይሆንም።
💫ተቋራጩ የተጠየቀውን የጥገና ሥራ ካከናወነ ግን ቀሪ 2.5% በመጨረሻ ርክክብ ጊዜ የሚለቀቅለት ክፍያ ይሆናል።
+4
ሰላም ጤና ይስጥልን ውድ የአባስ ነስሩ ቤተሰቦች
ከሳይት የተረፈ እና የአዳዲስ ፋብሪካዎች ምርት እንገዛለን
ከ20 ኩንታል በላይ ለሚገዙ ደንበኞቻችን የዴሊቨሪ አገልግሎት በነጻ እንደምንሰጥ እና ለደላሎች ኮሚሽን እንደምንከፍል ስንገልጽ ከታላቅ አክብሮትና ደስታ ጋር ነው
*አባስ ነስሩ የአርማታ ብረት (ፌሮ) መሸጫ*
ለግንባታ መሰረታዊው ነገር የአርማታ ብረቱ (ፊሮ) ጥራት ነው።
ጠንካራ እና እንደ ልብ የሚተጣጠፍ የአርማታ ብረት (ፌሮ) ለግንባታዎ ተመራጭ ነው።
ጠንካራ እና እንደልብ የሚታጠፍ የአርማታ ብረት ከየት እገዛለው ብለው ሀሳብ ገብቶታል ? እንግዲያውስ እኛ አለንልዎት ስንሎ በደስታ ነው እርሶም ምርጫዎ ስላረጉን እያመሰገንን የእርሶን የውድ ደንበኛችንን ፍላጎት ለማሟላት ድርጅታችን አለሁ ይላል
🔗 የምናቀርባቸው የብረት አይነቶች ⚒
ለቢም፣ለኮለን፣ለስላቭ፣ለደረጃ🪜፣ለህንጻ🏢፣ለቤት🏠፣ለድልድይ፣ለመንገድ 🛣እና ለተለያዩ ግንባታዎች የሚውሉ በሀገር ውስጥ🇪🇹 ፋብሪካዎች🏭 የተመረቱ እና ከቱርክ🇹🇷 በመጡ ጥራታቸውን የጠበቁ የአርማታ ብረት(ፌሮ) በግሬድ 60 እና ግሬድ 75 እኛ ጋር ያገኛሉ::
🏗rebar 8mm
🏗rebar 10mm
🏗rebar12mm
🏗rebar14mm
🏗rebar16mm
🏗rebar20mm
🏗rebar24mm
🏗rebar32mm
ስታፋ ብረት..(6 ) mm እና
ጥቅልሽቦ ..1.5 mm እና....2.5 mm
⚖በተመጣጣኝ ዋጋ 💵 እስተማማኝ አቅርቦት የአርማማታ ብረቶችን ይዞላችሁ ቀርቧል።
📱0911195872
📱0983774236
📱0922797141
Telegram Address ✍
⭐️ @abbassteelrebar ⭐️
አድራሻ :- ቁ.1ተክለሐይማኖት ፔፕሲ 50 ሜትር ገባ ብሎ
ቁ.2ጦርሀይሎች ሆላንድ ኤምባሲ
https://yimahos2.com/Abbas-Nesru-Steel
+5
✨️✨️ለሴራሚክ ፈላጊወች አዲስ ነገር ከ ግላንስ ሴራሚክ ና ግራናይት ✨️✨️
🎯 ለህንጻዎ ወለል ና ግድግዳ ተጨማሪ ውበትን የሚያላብሱ
🎯 ከተለያዮ የሳይዝ ና ከለር አማራጭ ጋር 120×60 60×60 30x60 30×30
🎯 የውጭ ሀገር ሴራሚኮችን በተመጣጣኝ ዋጋ ይዘንለወት ቀረበናል
⚡️ በተጨማሪም የሀገር ዉስጥ ሴራሚክ አስገብተናል
ይምጡና ይጎብኙን
📍 አድራሻ ፡ ከፊጋ መብራት ወደ ማርያም በሚወስደው መንገድ በእርሱ ሱፐር ማርኬት ፊት ለፊት/ ዲ ኤች ገዳ አጠገብ
ለተጨማሪ መረጃ
በስልክ ቁጥሮቻችን 🤳 ይደውሉልን
☎️ 0911676967
☎️ 0970111177
𝐓𝐞𝐥𝐞𝐠𝐞𝐫𝐚𝐦: https://t.me/Glancegraniteandceramic
𝐓𝐢𝐤𝐓𝐨𝐤: @glanceceramicgranite
👉Construction Accounting Formulas
1. Gross Profit = Sales – Cost of Goods Sold
2. Gross Profit Margin = (Gross Profit / Sales) x 100
3. Operating Profit = Gross Profit – Operating Expenses
4. Operating Profit Margin = (Operating Profit / Sales) x 100
5. Net Profit Margin = (Net Profit / Sales) x 100
6. Return on Investment (ROI) = (Gain/Cost) x 100
7. Return on Equity (ROE) = (Net Profit / Shareholder Equity) x 100
8. Asset Turnover = Sales / Total Assets
9. Inventory Turnover = Cost of Goods Sold / Average Inventory
10. Days Sales Outstanding (DSO) = Accounts Receivable /Sales x Number of Days
11. Days Inventory Outstanding (DIO)= Inventory / Cost of Goods Sold x 365
12. Current Ratio = Current Assets / Current Liabilities
13. Quick Ratio = (Current Assets – Inventory) / Current Liabilities
14. Debt-to-Equity Ratio = Total Debt / Shareholder Equity
15. Earnings Per Share (EPS) = Net Profit/Number of Shares
16. Price-Earnings Ratio (P/E Ratio) Stock Price / EPS
17. Break-Even Point (BEP) = Fixed Costs/ (Selling Price -Variable Costs)
18. Margin of Safety = (Sales – BEP) / Sales
19. Cost of Goods Sold (COGS) = Direct Materials + Direct Labor Overheads
20. Operating Leverage = (Operating Profit/Sales) x (Sales /Fixed Costs)
21. Financial Leverage = (Net Profit/Operating Profit) x (Operating Profit / Sales)
22. Return on Assets (ROA) = Net Profit/Total Assets
23. Return on Capital Employed (ROCE) EBIT / (Total Assets – Current Liabilities)
24. Residual Income (RI) = Net Profit (Total Assets x Cost of Capital)
25. Economic Value Added (EVA) = Net Profit – (Total Assets x Cost of Capital)
26. Cash Conversion Cycle = DIO + DSO-Days Payable Outstanding (DPO)
27. Asset Utilization Sales / Total Assets
28. Profitability Index (PI) = Present Value of Future Cash Flows/Initial Investment
29. Accounting Rate of Return (ARR) = Average Annual Profit/Average Investment
30. Payback Period = Initial Investment / Annual Cash Inflows
31. Discounted Payback Period = Initial Investment/Discounted Cash Inflows
32. Net Present Value (NPV) = Present Value of Future Cash Flows Initial Investment
33. Internal Rate of Return (IRR) = Discount Rate that sets NPV to zero
34. Cost of Capital = Weighted Average of Debt and Equity Costs
35. Weighted Average Cost of Capital (WACC) = (Cost of Debt x Debt) + (Cost of Equity x Equity)
36. Earnings Before Interest, Taxes, Depreciation, and Amortization (EBITDA) = Net Profit + Interest + Taxes + Depreciation + Amortization
37. Interest Coverage Ratio = EBIT/Interest Expenses
38. Cash Flow Margin = (Operating Cash Flow / Sales) x 100
39. Cash Flow Return on Investment (CFROI) = Operating Cash Flow/Total Assets
40. Free Cash Flow (FCF) = Operating Cash Flow – Capital Expenditures
@etconp
Corrosion of reinforcement
- Chemical exposure
- Alkali-silica reaction
- Poor quality concrete
- Carbonation
- Fire exposure
- Inadequate depth of cover
How to Treat Concrete Spalling
Concrete spalling, characterized by the flaking or breaking off of surface layers of concrete, is a common problem caused by factors such as corrosion of reinforcing steel, freeze-thaw cycles, poor concrete mix, or insufficient cover over reinforcing bars. Proper treatment is essential to restore the structural integrity and aesthetics of the affected concrete. Below are steps to effectively treat concrete spalling:
1. Assessment
- Inspection: Identify the extent and severity of spalling. Check for underlying issues such as rusted reinforcement or poor drainage.
- Testing: Perform tests to assess the structural soundness of the concrete and the extent of corrosion in the reinforcement.
2. Preparation
Surface Cleaning: Remove loose or delaminated concrete using tools like hammers, chisels, or high-pressure water jets.
Rust Removal: Clean exposed reinforcing steel with wire brushes or sandblasting to remove rust and prevent further corrosion.
3. Repair Materials Selection
Repair Mortar: Choose a suitable repair mortar or concrete mix that is compatible with the existing structure in terms of strength, shrinkage, and thermal expansion.
Bonding Agent: Apply a bonding agent to ensure proper adhesion between the old and new concrete.
4. Application
Reinforcement Protection: Apply a corrosion inhibitor or protective coating to the cleaned reinforcement to prevent future rusting.
Concrete Application: Apply the repair mortar in layers, ensuring each layer is compacted and free of voids. For deeper spalls, use multiple layers to build up to the original surface level.
5. Finishing
Surface Finishing: Smooth and level the repaired area to match the surrounding surface. Use appropriate tools for finishing, such as trowels or floats.
Curing: Cure the repair material properly to achieve the desired strength and durability. This may involve covering the area with wet burlap, plastic sheeting, or using curing compounds.
6. Prevention
Regular Maintenance: Conduct regular inspections and maintenance to identify and address issues early.
Protective Coatings: Apply sealers or waterproof coatings to protect the concrete surface from water ingress and freeze-thaw damage.
Drainage Improvement: Ensure proper drainage around concrete structures to prevent water accumulation and penetration.
By following these steps, concrete spalling can be effectively treated.
🏗This is called Concrete Spalling. Concrete spalling can be caused by a number of factors, including:-👇👇
As a site engineer, your role is critical in ensuring the successful execution of construction projects. Here are the key responsibilities and important points to follow:🏗
General Responsibilities
1. Planning and Execution:
• Understand project plans, specifications, and drawings.
• Plan daily and weekly activities and allocate resources accordingly.
2. Site Supervision:
• Monitor construction activities to ensure work aligns with drawings and specifications.
• Ensure quality control at every stage of the project.
3. Coordination:
• Liaise with architects, consultants, subcontractors, and suppliers.
• Coordinate with the project manager for smooth progress.
4. Safety Compliance:
• Ensure workers follow safety protocols and wear PPE (Personal Protective Equipment).
• Identify and mitigate site hazards.
5. Material Management:
• Monitor material usage and minimize wastage.
• Ensure timely procurement and delivery of materials.
6. Documentation:
• Maintain daily progress reports, site logs, and inspection records.
• Record as-built drawings and changes made during execution.
Important Points to Follow
Before Starting Work
1. Site Preparation:
• Conduct a site survey to understand existing conditions.
• Clear site obstructions and ensure necessary utilities are available.
2. Review Plans:
• Carefully review drawings and specifications.
• Identify discrepancies or conflicts and raise RFIs (Request for Information).
3. Understand Project Scope:
• Be familiar with the schedule, milestones, and deliverables.
During Construction
1. Quality Control:
• Conduct inspections for reinforcement, formwork, concrete pouring, and other key activities.
• Follow approved methods and standards (e.g., ASTM, ACI, or BS standards).
2. Time Management:
• Ensure activities are completed on time without compromising quality.
• Track progress and address delays promptly.
3. Resource Management:
• Ensure efficient use of manpower, machinery, and materials.
4. Communication:
• Clearly communicate instructions to workers and subcontractors.
• Address issues or conflicts immediately.
5. Monitoring:
• Keep an eye on weather conditions that could affect construction.
• Check for deviations from specifications or drawings.
After Construction
1. Inspection and Handover:
• Ensure all works are completed as per specifications.
• Conduct final inspections with the client and consultants.
2. Documentation:
• Prepare and submit handover documents (e.g., as-built drawings, test reports, warranties).
• Document lessons learned for future projects.
Additional Tips for Success
1. Stay Updated:
• Stay informed about construction techniques, software, and materials.
2. Be Proactive:
• Anticipate potential issues and address them early.
3. Focus on Safety:
• Conduct regular safety meetings and toolbox talks.
4. Maintain Good Relations:
• Build a positive relationship with workers, contractors, and stakeholders.
By adhering to these principles, you can effectively manage site activities, ensure quality construction, and complete projects successfully.
---------------------------------------------
Any comments? Or Questions? t.me/Consitesolutionbot 👌@Consite🏗
የፕሮጀክት አስተዳዳሪዎች 8 ቁልፍ ሚናዎች እና ኃላፊነቶች🏗
1. እንቅስቃሴ እና ሀብት ዕቅድ
እቅድ የፕሮጀክት ቀነ-ገደቦችን ለማሟላት አስፈላጊ ነው ፣ እና ብዙ ፕሮጄክቶች በጥሩ ዕቅድ ምክንያት ይሳካል። በመጀመሪያ እና ከሁሉም በላይ ፣ ጥሩ የፕሮጀክት አስተዳዳሪዎች የፕሮጀክቱን ወሰን ይገልፃሉ እናም የሚገኙትን ሀብቶች ይወስናሉ ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች እንዴት የቡድን ወይም የቡድን አቅሞችን በእውነተኛ ጊዜ ማዋቀር እና መገምገም እንደሚችሉ ያውቃሉ ፡፡
ከዚያ ፕሮጀክቱን ለማስፈፀም እና እድገቱን ለመቆጣጠር ግልፅ እና እጥር ምጥን ዕቅድ ይፈጥራሉ ፡፡ ፕሮጀክቶች በተፈጥሮ ሊተነበዩ የማይችሉ ናቸው ፣ ስለሆነም ጥሩ የፕሮጀክት አስተዳዳሪዎች ፕሮጀክቱ የመጨረሻ ደረጃ ላይ ከመድረሱ በፊት አስፈላጊ ሆኖ ሲገኝ ማስተካከያዎችን እንዴት እንደሚያደርጉ ያውቃሉ ፡፡
2. የፕሮጀክት ቡድን ማደራጀት እና ማነሳሳት
ጥሩ የፕሮጀክት አስተዳዳሪዎች ቡድኖቻቸው በዝርዝር የተመን ሉህዎች ፣ ረጅም ማጣቀሻዎች እና በነጭ ሰሌዳዎች እንዲታሰሩ አያደርጉም። ይልቁንም ቡድኖቻቸውን የፊት እና የመሃል ላይ አደረጉ ፡፡ ቡድኖቻቸውን ሙሉ አቅማቸውን ለማሳካት ግልጽ እና ቀጥተኛ ዕቅዶችን ያዳብራሉ ፡፡ ቢሮክራሲን በመቁጠር ቡድኖቻቸውን ወደ የመጨረሻ ግብ ለመምራት ግልፅ መንገድን ይመራሉ፡፡
3. የጊዜ አያያዝን መቆጣጠር
ደንበኞች ብዙውን ጊዜ የፕሮጀክቱን ስኬት ወይም ውድቀት በሰዓቱ ማድረሱ ላይ ይፈርዳሉ። ስለዚህ የስምምነት ቀኖችን መገናኘት ድርድር የሚደረግ አይደለም ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች ተጨባጭ ቀነ-ገደቦችን እንዴት ማቀናጀት እንዳለባቸው እና እንዴት ለቡድኖቻቸው በተከታታይ እንዴት መገናኘት እንደሚችሉ ያውቃሉ ፡፡
የሚከተሉትን ውጤታማ በሆነ መንገድ እንዴት ማድረግ እንደሚችሉ ያውቃሉ-
እንቅስቃሴን ይግለጹ
ቅደም ተከተል እንቅስቃሴ
የእንቅስቃሴውን ቆይታ ይገምቱ
መርሐግብር ያዘጋጁ
የጊዜ ሰሌዳ ይኑርህ
4. ወጪ መገመት እና በጀቱን ማጎልበት
ጥሩ የፕሮጀክት አስተዳዳሪዎች አንድን በጀት በተያዘለት በጀት ውስጥ አንድ ፕሮጀክት እንዴት ማቆየት እንደሚችሉ ያውቃሉ ፡፡ ምንም እንኳን አንድ ፕሮጀክት የደንበኞቹን ፍላጎቶች የሚያሟላ እና በሰዓቱ ቢቀርብለት እንኳን ከበጀት በላይ ቢወጣ አሁንም ውድቀት ይሆናል። ጥሩ የፕሮጀክት አስተዳዳሪዎች ብዙ ጊዜ በጀቱን ይገመግማሉ እና ግዙፍ የበጀት አጠቃቀምን ለማስወገድ አስቀድሞ ያቅዱ ፡፡
5. የደንበኞችን እርካታ ማረጋገጥ
በመጨረሻ አንድ ፕሮጀክት ስኬት የሚሆነው ደንበኛው ደስተኛ ከሆነ ብቻ ነው ፡፡ የእያንዳንዱ የፕሮጀክት ሥራ አስኪያጅ ቁልፍ ከሆኑት ኃላፊነቶች አንዱ እርግጠኛ አለመሆንን ለመቀነስ ፣ ማንኛውንም አላስፈላጊ የሆኑ ድንገተኛ ነገሮችን በማስወገድ እና በተቻለ መጠን ደንበኞቻቸውን በፕሮጀክቱ ውስጥ ማሳት ነው ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች ውጤታማ የሆነ ግንኙነትን እንዴት ጠብቆ ማቆየት እና የኩባንያውን ደንበኞች ወቅታዊ ማድረጉን እንዴት ያውቃሉ።
6. የፕሮጄክት ስጋት ትንተና እና ቁጥጥር
ፕሮጀክቱ ትልቅ ከሆነ ፣ የመነሻ ዕቅዱ አካል ያልሆነ መሰናክሎች እና መሰናክሎች የመፍጠር እድሉ ሰፊ ነው። Hiccups መከሰት የማይቀር ነው ፣ ግን ጥሩ የፕሮጀክት አስተዳዳሪዎች ፕሮጀክቱ ከመጀመሩ በፊት እንዴት በጥንቃቄ እና በጥልቀት እንደሚረዳ ፣ እንዴት ሊከሰቱ የሚችሉ ስጋቶችን ለይቶ እንደሚገመግሙ ያውቃሉ ፡፡ ከዛ አደጋዎችን እንዴት ማስወገድ ወይም ቢያንስ የእነሱን ተፅእኖ ለመቀነስ እንደሚችሉ ያውቃሉ ፡፡
7. መሻሻል መከታተል
በመነሻ ደረጃዎች ውስጥ የፕሮጀክት ሥራ አስኪያጆች እና ቡድኖቻቸው የተፈለገውን ውጤት የማስገኘት ግልፅ ራዕይ እና ከፍተኛ ተስፋ አላቸው ፡፡ ሆኖም ፣ ወደ ማጠናቀቂያው መስመር የሚወስደው መንገድ በጭራሽ በጭራሽ በጭራሽ አይደለም ፡፡ ነገሮች በእቅዱ መሠረት የማይሄዱ ከሆነ የፕሮጀክት ሥራ አስኪያጅ ሁለቱንም ወጭዎች እና የቡድን አፈፃፀም መከታተል እና መተንተን እና ሁል ጊዜም የማስተካከያ እርምጃዎችን መውሰድ አለበት።
8. ሪፖርቶችን እና አስፈላጊ ሰነዶችን ማስተዳደር
በመጨረሻም ፣ ልምድ ያላቸው የፕሮጀክት አስተዳዳሪዎች የመጨረሻ ዘገባዎች እና ትክክለኛ ሰነዶች ምን ያህል አስፈላጊ እንደሆኑ ያውቃሉ። ጥሩ የፕሮጀክት አስተዳዳሪዎች ሁሉም የፕሮጄክት መስፈርቶች ተሟልተዋል እንዲሁም የፕሮጀክቶቹ ታሪክ ፣ ምን እንደተደረገ ፣ ማን እንደተሳተፈ እና ለወደፊቱ በተሻለ ምን ሊከናወን እንደሚችል ጨምሮ አጠቃላይ ሪፖርቶችን ማቅረብ ይችላሉ፡፡
Share FIDIC_standard_letters__1741929397(1).pdf
ሜትሮ ፔይንት ሶልዩሽን🏗
ሜትሮ ሱፐር ቀለም💠
1. ጥራት ያለው እና ፈጣን የፕሮጀክት ስራን ይለማመዱ።
2. ቀለሞቻችን ለፕሮጀክትዎ ጤናማ ምርጫን የሚያረጋግጡ በአከባቢው ደህንነታቸው በተጠበቁ ንጥረ ነገሮች የተሠሩ ናቸው።
3. መጥፋትን፣ መቆራረጥን መቋቋም በሚችለ ዘላቂ የቀለም መፍትሄዎች እና በረጅም ጊዜ ዘላቂ ውጤቶች አላቸው።
4. ያለምንም እንከን የለሽ አሰራር የተነደፈ፣ ቀለሞቻችን ያለምንም ጥረት ሊቦረሽ፣ ወይም በስፕሬ ማሽን ሊረጩ ይችላሉ።
5. ፕሮጀክቶቻችሁ በፍጥነት እንዲያጠናቅቁ የሚያስችልዎትን በፈጣን-ማድረቂያ ቀመሮቻችን ጊዜ ይቆጥቡ።
6. የተለያዩ ቀለሞችን በሚፈልጉት መልኩ ከመኖሪያ እስከ የንግድ ቦታዎች በተመጣጣኝ ዋጋ እናቀርባለን፡፡
7. የኛ ድርጅት አጠቃቀም እውቀት ትክክለኛውን ምርት ለመምረጥ መመሪያ እና ድጋፍ ለመስጠት ሁልጊዜ ይገኛል።
8. ከፍተኛ ጥራት ያለው ቀለም እኛ ጋር ያገኛሉ፡፡
9. በባለሙያዎች የታመነ፣ ልዩ የሆነ ቀለም በማቅረብ እንታወቃለን፡፡
10. የሜትሮ ምርቶችን ለማድረስ የራሳችንን ተሽከርካሪዎች እንደምንጠቀም እንገልፃለን፡፡
11. ይህ ምርት ለሁለም ተስማሚ ነው::
ኮንትራክተሮች ትልልቅ ፕሮጀክት ለሚሰሩ እና ቤታቸውን መቀባት የሚፈልጉ ግለሰቦች በተመጣጣኝ ዋጋ እናቀርባለን፡፡
------------------------------------------------
📍✅አዲስ አበባ ውስጥ ለሆኑ ነፃ የማድረስ አገልግሎት እንሰጣለን! ለማዘዝ በ📞 0933454590 📞 093 345 4590 ቀጥታ ይደውሉ! ➡️@Consite🏗💠
📌ኬኙማም ኮንስትራክሽን ግብዓት አምራች
🫅👸ለውድ ደንበኞችን ጥራት ያላቸውን ምርቶቻችንን እያቀረብን መቆየታችን ይታወቃል ።
በመሆኑም አሁን :-
🏘 ለመኖሪያ ቤቶች
🏨ለአፓርትመንት
🏢ለኮንዶሚኒየም
🏗 ለተለያዩ ህንፃ ግንባታ
የሚውሉ የተለያየ መጠን ያላቸውን ብሎኬቶች ከቱርክ ባስመጣነው ሀይድሮሊክ ማሽን ማቅረባችንን ቀጥለናል ።