π SOB BZA π
Open in Telegram
921
Subscribers
No data24 hours
No data7 days
No data30 days
Posts Archive
Sub: Issue of Certificates for regular operation of Double Decker Coaches (LWCZDACAA) width 3050 mm fitted with 160 KN Air Spring in SCr - Reg.
Ref : 1) PCEE/SCR9s Lr. No.E.221/CRS/Vol-VII, dated 07.05.2024.
2)......
Sub: GM/SCRβs Sanction for regular operation of BG Bogie open Wagon type βBOXNSβ (25t) upto a
maximum speed of 100 kmph in empty condition (Up & Dn lines) and 45 kmph in loaded
condition (Up line only) over Duvvada (DVD) Excl.-Vijayawada Bye pass β Kondapalli (KI)
section of South Central Railway - Reg.
Ref: CRSE/Planning/SCRβs Lr. No.M.95/GM sanction/BOXNS/25t, dated 06.07.2022.
Sub: GM/SCRβs Sanction for regular operation of BG Bogie open Wagon type βBOXNHLβ (25t) upto a maximum speed of 100 kmph in empty condition (Up & Dn lines) and 45 kmph in loaded
condition (Up line only) over Duvvada (DVD) Excl.-Vijayawada Bye pass β Kondapalli (KI)
section of South Central Railway - Reg.
Ref: CRSE/Freight/SCRβs Lr. No.M.95/GM sanction/BOXNHL/25t, dated 14.03.2024.
Sub: Scheme for Energy Saving in 3-phase freight electric locomotives- Reg.
Ref:
1. DG(Traction)/RDSO/LKO Lr. No.EL/3.1/35.17 dated 10.04.2024.
2. RDSO/LKO Modification Sheet No.RDSO/2020/EL/MS/0482 (Rev.β1β).
SOB-22/2024 Sub: Bit packing for isolation of traction motors - Reg.
Ref: PCEE/SCR's Lr. No.E.223/0ptg/Instructions/Vol-I,dated 02.04.2024
Sub: Section wise speeds of Eclectic Locomotives - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.221, dated 15.02.2024.
2) Joint Safety Certificate No.CAO/ELEC/CON/006 (KZJ-BZA).
3) Joint Safety Certificate No.CAO/ELEC/CON/007 (GNT-NDL).
4) Joint Safety Certificate No.CAO/ELEC/CON/009 (VNC-GALA).
5) Joint Safcty Certificate No.CAO/ RVNL/GDR-NLR/2022 (GDR-NLR).
6) Joint Safety Certificatc No.CAO/RVNL/Electrical/GDR-KCC/2023(UPD-KRV &CJM-KCC).
SOB-22/2024 Sub: Bit packing for isolation of traction motors - Reg.
Ref: PCEE/SCR's Lr. No.E.223/0ptg/Instructions/Vol-I,dated 02.04.2024
Sub: Section wise speeds of Eclectic Locomotives - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.221, dated 15.02.2024.
2) Joint Safety Certificate No.CAO/ELEC/CON/006 (KZJ-BZA).
3) Joint Safety Certificate No.CAO/ELEC/CON/007 (GNT-NDL).
4) Joint Safety Certificate No.CAO/ELEC/CON/009 (VNC-GALA).
5) Joint Safcty Certificate No.CAO/ RVNL/GDR-NLR/2022 (GDR-NLR).
6) Joint Safety Certificatc No.CAO/RVNL/Electrical/GDR-KCC/2023(UPD-KRV &CJM-KCC).
Sub: Not to pack Q51 relay - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.223/Optg./Instructions/Vol-I, dated 22.03.2024.
2) HQ letter no.E.223/Optg./Optg/Instructions/Vol-1 dt 26.10.2016.
Sub: Stoppage of redundant paperwork by LP/ALP during loco operation β Reg.
Ref : 1) PCEE/SCR Lr. No.2022/Elect(TRS)/113/Safety Misc., dated 18.03.2024.
2) HQ letter no.E.223/Optg./PRM/Vol.I, dated 04.07.2018.
Sub: Energy saving modification in electric 3 phase locos β Reg.
Ref : 1) PCEE/SCR Lr. No.E.223/Optg./ Technical Drive, dated 18.03.2024.
2) RDSO letter no.EL/3.135/17, dated 27.04.2023.
Sub: Procedure to ensure proper sign ON/OFF by running staff β Reg.
Ref : 1). PCEE/SCR Lr. No.E.195/TRS/Safety/Vol-XXIX, dated 07.03.2024.
( Lobby Policy No β 01/2024)
2). Fly leaf no. Safety.387/Fly Leaf/7/2013.
3) Rly Bdβs Lr. No.2001/Safety-I/23/4, dated 27.11.2001.
*
Sub: Summer and Monsoon preparedness - Reg.
Ref: 1). Rly Board Lr. No. 2005/Elect (TRS)/440/23, dated 05.03.2024.
2). PCEE/SCR Lr. No.E.223/Optg./Technical Drive, dated 12.03.2024.
