π SOB BZA π
Open in Telegram
921
Subscribers
No data24 hours
No data7 days
No data30 days
Data loading in progress...
Similar Channels
Tags Cloud
No data
Any problems? Please refresh the page or contact our support manager.
Incoming and Outgoing Mentions
---
---
---
---
---
---
Attracting Subscribers
November '24
November '24
+46
in 0 channels
October '240
in 0 channels
Get PRO
September '240
in 0 channels
Get PRO
August '240
in 0 channels
Get PRO
July '240
in 0 channels
Get PRO
June '24
+9
in 0 channels
Get PRO
May '24
+28
in 0 channels
Get PRO
April '24
+25
in 0 channels
Get PRO
March '24
+40
in 0 channels
Get PRO
February '24
+843
in 0 channels
| Date | Subscriber Growth | Mentions | Channels | |
| 13 November | 0 | |||
| 12 November | 0 | |||
| 11 November | +1 |
Channel Posts
| 2 | +1 Local sob 25.pdf | 0 |
| 3 | Sub: Issue of Certificates for regular operation of Double Decker Coaches (LWCZDACAA) width 3050 mm fitted with 160 KN Air Spring in SCr - Reg.
Ref : 1) PCEE/SCR9s Lr. No.E.221/CRS/Vol-VII, dated 07.05.2024.
2)...... | 0 |
| 4 | SOB - 28 2024.pdf | 0 |
| 5 | SOB 27 2024.pdf | 0 |
| 6 | Sub: GM/SCRβs Sanction for regular operation of BG Bogie open Wagon type βBOXNSβ (25t) upto a
maximum speed of 100 kmph in empty condition (Up & Dn lines) and 45 kmph in loaded
condition (Up line only) over Duvvada (DVD) Excl.-Vijayawada Bye pass β Kondapalli (KI)
section of South Central Railway - Reg.
Ref: CRSE/Planning/SCRβs Lr. No.M.95/GM sanction/BOXNS/25t, dated 06.07.2022. | 0 |
| 7 | Sub: GM/SCRβs Sanction for regular operation of BG Bogie open Wagon type βBOXNHLβ (25t) upto a maximum speed of 100 kmph in empty condition (Up & Dn lines) and 45 kmph in loaded
condition (Up line only) over Duvvada (DVD) Excl.-Vijayawada Bye pass β Kondapalli (KI)
section of South Central Railway - Reg.
Ref: CRSE/Freight/SCRβs Lr. No.M.95/GM sanction/BOXNHL/25t, dated 14.03.2024. | 0 |
| 8 | Sub: Scheme for Energy Saving in 3-phase freight electric locomotives- Reg.
Ref:
1. DG(Traction)/RDSO/LKO Lr. No.EL/3.1/35.17 dated 10.04.2024.
2. RDSO/LKO Modification Sheet No.RDSO/2020/EL/MS/0482 (Rev.β1β). | 0 |
| 9 | Sub: Fire Smoke Detectors in LHB - Coaches (FSDS)- Reg. | 0 |
| 10 | SOB-22/2024 Sub: Bit packing for isolation of traction motors - Reg.
Ref: PCEE/SCR's Lr. No.E.223/0ptg/Instructions/Vol-I,dated 02.04.2024 | 0 |
| 11 | Sub: Section wise speeds of Eclectic Locomotives - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.221, dated 15.02.2024.
2) Joint Safety Certificate No.CAO/ELEC/CON/006 (KZJ-BZA).
3) Joint Safety Certificate No.CAO/ELEC/CON/007 (GNT-NDL).
4) Joint Safety Certificate No.CAO/ELEC/CON/009 (VNC-GALA).
5) Joint Safcty Certificate No.CAO/ RVNL/GDR-NLR/2022 (GDR-NLR).
6) Joint Safety Certificatc No.CAO/RVNL/Electrical/GDR-KCC/2023(UPD-KRV &CJM-KCC). | 0 |
| 12 | SOB-22/2024 Sub: Bit packing for isolation of traction motors - Reg.
Ref: PCEE/SCR's Lr. No.E.223/0ptg/Instructions/Vol-I,dated 02.04.2024 | 0 |
| 13 | +1 Sub: Section wise speeds of Eclectic Locomotives - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.221, dated 15.02.2024.
2) Joint Safety Certificate No.CAO/ELEC/CON/006 (KZJ-BZA).
3) Joint Safety Certificate No.CAO/ELEC/CON/007 (GNT-NDL).
4) Joint Safety Certificate No.CAO/ELEC/CON/009 (VNC-GALA).
5) Joint Safcty Certificate No.CAO/ RVNL/GDR-NLR/2022 (GDR-NLR).
6) Joint Safety Certificatc No.CAO/RVNL/Electrical/GDR-KCC/2023(UPD-KRV &CJM-KCC). | 0 |
| 14 | Sub: Not to pack Q51 relay - Reg.
Ref: 1) PCEE/SCR's Lr. No.E.223/Optg./Instructions/Vol-I, dated 22.03.2024.
2) HQ letter no.E.223/Optg./Optg/Instructions/Vol-1 dt 26.10.2016. | 0 |
| 15 | SOB 20 - 2024 Q51.PDF | 0 |
| 16 | DGTL_CIR_TechEL_19-03-2024_10.197.58.208_1.pdf | 0 |
| 17 | Sub: Stoppage of redundant paperwork by LP/ALP during loco operation β Reg.
Ref : 1) PCEE/SCR Lr. No.2022/Elect(TRS)/113/Safety Misc., dated 18.03.2024.
2) HQ letter no.E.223/Optg./PRM/Vol.I, dated 04.07.2018. | 0 |
| 18 | Sub: Energy saving modification in electric 3 phase locos β Reg.
Ref : 1) PCEE/SCR Lr. No.E.223/Optg./ Technical Drive, dated 18.03.2024.
2) RDSO letter no.EL/3.135/17, dated 27.04.2023. | 0 |
| 19 | Sub: Procedure to ensure proper sign ON/OFF by running staff β Reg.
Ref : 1). PCEE/SCR Lr. No.E.195/TRS/Safety/Vol-XXIX, dated 07.03.2024.
( Lobby Policy No β 01/2024)
2). Fly leaf no. Safety.387/Fly Leaf/7/2013.
3) Rly Bdβs Lr. No.2001/Safety-I/23/4, dated 27.11.2001.
* | 0 |
| 20 | Sub: Summer and Monsoon preparedness - Reg.
Ref: 1). Rly Board Lr. No. 2005/Elect (TRS)/440/23, dated 05.03.2024.
2). PCEE/SCR Lr. No.E.223/Optg./Technical Drive, dated 12.03.2024. | 0 |
