ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π
π Analytical overview of Telegram channel ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π
Channel ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π (@amazonengineering) in the English language segment is an active participant. Currently, the community unites 17 456 subscribers, ranking 11 702 in the Education category and 22 824 in the India region.
π Audience metrics and dynamics
Since its creation on Π½Π΅Π²ΡΠ΄ΠΎΠΌΠΎ, the project has demonstrated rapid growth, gathering an audience of 17 456 subscribers.
According to the latest data from 10 November, 2026, the channel demonstrates stable activity. Although there has been a change in the number of participants by -197 over the last 30 days and by -4 over the last 24 hours, overall reach remains high.
- Verification status: Not verified
- Engagement rate (ER): The average audience engagement rate is 13.10%. Within the first 24 hours after publication, content typically collects 4.73% reactions from the total number of subscribers.
- Post reach: On average, each post receives 2 287 views. Within the first day, a publication typically gains 826 views.
- Reactions and interaction: The audience actively supports content: the average number of reactions per post is 2.
- Thematic interests: Content is focused on key topics such as density, construction, moisture, bridge, compaction.
π Description and content policy
The author describes the resource as a platform for expressing subjective opinions:
βExploring the world of Engineeringβ
Thanks to the high frequency of updates (latest data received on 11 November, 2026), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Education category.
Loading data
| Date | Subscriber Growth | Mentions | Channels | |
| 11 November | 0 | |||
| 10 November | +1 | |||
| 09 November | 0 | |||
| 08 November | 0 | |||
| 07 November | 0 | |||
| 06 November | 0 | |||
| 05 November | 0 | |||
| 04 November | 0 | |||
| 03 November | 0 | |||
| 02 November | 0 | |||
| 01 November | 0 |
| 2 | No text... | 2 342 |
| 3 | No text... | 2 114 |
| 4 | No text... | 2 214 |
| 5 | No text... | 1 987 |
| 6 | Document from ... E.N.G.R | 2 029 |
| 7 | Document from ... E.N.G.R | 1 969 |
| 8 | No text... | 2 558 |
| 9 | Document from ... E.N.G.R | 2 146 |
| 10 | R_P_Johnson_Composite_Structures_of_Steel_and_Concrete_Beams,_Slabs.pdf | 2 561 |
| 11 | No text... | 2 586 |
| 12 | No text... | 2 652 |
| 13 | No text... | 3 938 |
| 14 | https://t.me/theamazonengineering | 4 423 |
| 15 | No text... | 4 509 |
| 16 | Slump Test of Concrete β ASTM C143/C143M
1. Aim
To determine the slump of fresh concrete as an indication of its consistency/workability, in accordance with ASTM C143/C143M.
2. Apparatus
Slump cone (Abrams cone):
Height: 300 mm
Bottom diameter: 200 mm
Top diameter: 100 mm
Tamping rod:
Diameter: 16 mm
Length: approximately 600 mm
Rounded end
Rigid, level, non-absorbent base
Scoop
Measuring scale
3. Procedure
1. Dampen the inside of the slump cone and the base plate.
2. Place the cone on the level base and hold it firmly.
3. Fill the cone with fresh concrete in three approximately equal layers.
4. Rod each layer 25 times using the tamping rod.
5. When rodding the second and third layers, allow the rod to penetrate slightly into the underlying layer.
6. After rodding the third layer, add concrete if necessary and strike off the surface level with the top of the cone.
7. Remove excess concrete around the base of the cone.
8. Lift the cone vertically and steadily, without twisting or lateral movement. The lifting operation should take approximately 5 Β± 2 seconds.
9. Allow the concrete to subside.
10. Measure the vertical difference between the original height of the cone and the displaced center of the top surface of the concrete.
11. Record the slump to the nearest 5 mm (ΒΌ in.).
4. Calculation
\[
\boxed{\text{Slump} = H_c-H_s}
\]
Where:
\(H_c\) = height of the slump cone = 300 mm
\(H_s\) = height of the slumped concrete at its center
Example:
If the height of the slumped concrete is 220 mm:
\[
\text{Slump}=300-220=80\text{ mm}
\]
Slump = 80 mm
5. Observation Table
Trial Height of cone Height of slumped concrete Slump
1 300 mm _ mm _ mm
2 300 mm _ mm _ mm
3 300 mm _ mm _ mm
6. Result
> The slump of the given fresh concrete sample was __ mm.
7. Precautions
The base must be level, rigid, and non-absorbent.
The cone must be held firmly during filling and rodding.
Rod each layer exactly 25 times.
Do not twist or tilt the cone while lifting it.
Lift the cone smoothly within approximately 5 Β± 2 seconds.
Perform the test promptly after obtaining the concrete sample.
If the concrete shears off or collapses substantially, the test should be repeated according to ASTM C143/C143M; the type of slump should be noted where applicable.
Reference: ASTM C143/C143M, Standard Test Method for Slump of Hydraulic-Cement Concrete. | 4 416 |
| 17 | ASTM C143/C143M β Standard Test Method for Slump of Hydraulic-Cement Concrete.
ASTM slump test procedure
1. Apparatus
Slump cone (Abrams cone): 300 mm high, 200 mm bottom diameter, 100 mm top diameter.
Tamping rod: 16 mm diameter, 600 mm long, rounded at one end.
Rigid, non-absorbent base plate.
Scoop and measuring scale.
2. Sampling
Obtain a representative concrete sample according to the applicable ASTM sampling procedure.
Remix the sample sufficiently before testing.
3. Moisten equipment
Dampen the inside of the cone and the base.
Place the cone on a level, rigid, non-absorbent surface.
Hold the cone firmly in position.
4. Fill the cone Fill the cone in 3 approximately equal-volume layers.
For each layer:
Rod 25 times uniformly over the cross-section.
For the second and third layers, penetrate the previous layer slightly while rodding.
The final layer should slightly overfill the cone.
5. Strike off
After rodding the top layer, strike off the concrete level with the top of the cone.
Clean away concrete around the base.
6. Lift the cone
Raise the cone vertically and steadily, without twisting or lateral movement.
Complete the lifting operation in approximately 5 Β± 2 seconds.
7. Measure slump
Immediately measure the vertical difference between the original height of the cone and the displaced center of the top surface of the slumped concrete.
Report the slump to the nearest 5 mm (ΒΌ in.).
Important ASTM points
Item ASTM requirement
Number of layers 3
Rodding per layer 25 strokes
Cone height 300 mm
Top diameter 100 mm
Bottom diameter 200 mm
Rod diameter 16 mm
Cone lifting time 5 Β± 2 s
Slump measurement Vertical difference
Note: ASTM C143/C143M is specifically for determining the slump of plastic hydraulic-cement concrete. A concrete that shears or collapses significantly may require the test to be repeated, with the result interpreted according to the standard. | 2 947 |
| 18 | Right or wrong? | 2 431 |
| 19 | No text... | 3 293 |
| 20 | Prime coat | 3 680 |