en
Feedback

Don't get caught by a cheater! Telemetrio finds and tags such channels πŸ‘‰ If you want to see the tag, subscribe

𝐂𝐒𝐯𝐒π₯ π„π§π π’π§πžπžπ«π’π§π 

𝐂𝐒𝐯𝐒π₯ π„π§π π’π§πžπžπ«π’π§π 

Open in Telegram

Exploring the world of Engineering

Show more

πŸ“ˆ Analytical overview of Telegram channel 𝐂𝐒𝐯𝐒π₯ π„π§π π’π§πžπžπ«π’π§π 

Channel 𝐂𝐒𝐯𝐒π₯ π„π§π π’π§πžπžπ«π’π§π  (@amazonengineering) in the English language segment is an active participant. Currently, the community unites 17 456 subscribers, ranking 11 702 in the Education category and 22 824 in the India region.

πŸ“Š Audience metrics and dynamics

Since its creation on Π½Π΅Π²Ρ–Π΄ΠΎΠΌΠΎ, the project has demonstrated rapid growth, gathering an audience of 17 456 subscribers.

According to the latest data from 10 November, 2026, the channel demonstrates stable activity. Although there has been a change in the number of participants by -197 over the last 30 days and by -4 over the last 24 hours, overall reach remains high.

  • Verification status: Not verified
  • Engagement rate (ER): The average audience engagement rate is 13.10%. Within the first 24 hours after publication, content typically collects 4.73% reactions from the total number of subscribers.
  • Post reach: On average, each post receives 2 287 views. Within the first day, a publication typically gains 826 views.
  • Reactions and interaction: The audience actively supports content: the average number of reactions per post is 2.
  • Thematic interests: Content is focused on key topics such as density, construction, moisture, bridge, compaction.

πŸ“ Description and content policy

The author describes the resource as a platform for expressing subjective opinions:
β€œExploring the world of Engineering”

Thanks to the high frequency of updates (latest data received on 11 November, 2026), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Education category.

17 456
Subscribers
-424 hours
-407 days
-19730 days

Loading data

Attracting Subscribers
Nov '26
November '26
+1
in 0 channels
October '26
+6
in 0 channels
Get PRO
September '260
in 0 channels
Get PRO
August '260
in 0 channels
Get PRO
July '260
in 0 channels
Get PRO
June '26
+11
in 0 channels
Get PRO
May '26
+18
in 0 channels
Get PRO
April '26
+9
in 0 channels
Get PRO
March '26
+8
in 0 channels
Get PRO
February '26
+40
in 0 channels
Get PRO
January '26
+39
in 0 channels
Get PRO
December '25
+30
in 0 channels
Get PRO
November '25
+39
in 0 channels
Get PRO
October '25
+33
in 0 channels
Get PRO
September '25
+57
in 1 channels
Get PRO
August '25
+48
in 0 channels
Get PRO
July '25
+67
in 0 channels
Get PRO
June '25
+21
in 0 channels
Get PRO
May '25
+21
in 0 channels
Get PRO
April '25
+27
in 0 channels
Get PRO
March '25
+34
in 0 channels
Get PRO
February '25
+24
in 0 channels
Get PRO
January '25
+22
in 0 channels
Get PRO
December '24
+19
in 0 channels
Get PRO
November '24
+4
in 0 channels
Get PRO
October '24
+40
in 0 channels
Get PRO
September '24
+144
in 0 channels
Get PRO
August '24
+115
in 0 channels
Get PRO
July '24
+86
in 0 channels
Get PRO
June '24
+72
in 0 channels
Get PRO
May '24
+353
in 0 channels
Get PRO
April '24
+116
in 0 channels
Get PRO
March '24
+154
in 0 channels
Get PRO
February '24
+134
in 0 channels
Get PRO
January '24
+128
in 0 channels
Get PRO
December '23
+333
in 0 channels
Get PRO
November '23
+116
in 0 channels
Get PRO
October '23
+124
in 0 channels
Get PRO
September '23
+272
in 0 channels
Get PRO
August '23
+138
in 0 channels
Get PRO
July '23
+244
in 0 channels
Get PRO
June '23
+44
in 0 channels
Get PRO
May '23
+44
in 0 channels
Get PRO
April '23
+30
in 0 channels
Get PRO
March '23
+150
in 0 channels
Get PRO
February '23
+385
in 0 channels
Get PRO
January '23
+814
in 0 channels
Get PRO
December '22
+302
in 0 channels
Get PRO
November '22
+64
in 0 channels
Get PRO
October '22
+33
in 0 channels
Get PRO
September '22
+37
in 0 channels
Get PRO
August '22
+54
in 0 channels
Get PRO
July '22
+69
in 0 channels
Get PRO
June '22
+92
in 0 channels
Get PRO
May '22
+101
in 0 channels
Get PRO
April '22
+135
in 0 channels
Get PRO
March '22
+417
in 0 channels
Get PRO
February '22
+885
in 0 channels
Get PRO
January '22
+3 057
in 0 channels
Get PRO
December '21
+2 960
in 0 channels
Get PRO
November '21
+16 788
in 0 channels
Date
Subscriber Growth
Mentions
Channels
11 November0
10 November+1
09 November0
08 November0
07 November0
06 November0
05 November0
04 November0
03 November0
02 November0
01 November0
Channel Posts
2
No text...
2 342
3
No text...
2 114
4
No text...
2 214
5
No text...
1 987
6
Document from ... E.N.G.R
2 029
7
Document from ... E.N.G.R
1 969
8
No text...
2 558
9
Document from ... E.N.G.R
2 146
10
R_P_Johnson_Composite_Structures_of_Steel_and_Concrete_Beams,_Slabs.pdf
2 561
11
No text...
2 586
12
No text...
2 652
13
No text...
3 938
14
https://t.me/theamazonengineering
4 423
15
No text...
4 509
16
Slump Test of Concrete β€” ASTM C143/C143M 1. Aim To determine the slump of fresh concrete as an indication of its consistency/workability, in accordance with ASTM C143/C143M. 2. Apparatus Slump cone (Abrams cone): Height: 300 mm Bottom diameter: 200 mm Top diameter: 100 mm Tamping rod: Diameter: 16 mm Length: approximately 600 mm Rounded end Rigid, level, non-absorbent base Scoop Measuring scale 3. Procedure 1. Dampen the inside of the slump cone and the base plate. 2. Place the cone on the level base and hold it firmly. 3. Fill the cone with fresh concrete in three approximately equal layers. 4. Rod each layer 25 times using the tamping rod. 5. When rodding the second and third layers, allow the rod to penetrate slightly into the underlying layer. 6. After rodding the third layer, add concrete if necessary and strike off the surface level with the top of the cone. 7. Remove excess concrete around the base of the cone. 8. Lift the cone vertically and steadily, without twisting or lateral movement. The lifting operation should take approximately 5 Β± 2 seconds. 9. Allow the concrete to subside. 10. Measure the vertical difference between the original height of the cone and the displaced center of the top surface of the concrete. 11. Record the slump to the nearest 5 mm (ΒΌ in.). 4. Calculation \[ \boxed{\text{Slump} = H_c-H_s} \] Where: \(H_c\) = height of the slump cone = 300 mm \(H_s\) = height of the slumped concrete at its center Example: If the height of the slumped concrete is 220 mm: \[ \text{Slump}=300-220=80\text{ mm} \] Slump = 80 mm 5. Observation Table Trial Height of cone Height of slumped concrete Slump 1 300 mm _ mm _ mm 2 300 mm _ mm _ mm 3 300 mm _ mm _ mm 6. Result > The slump of the given fresh concrete sample was __ mm. 7. Precautions The base must be level, rigid, and non-absorbent. The cone must be held firmly during filling and rodding. Rod each layer exactly 25 times. Do not twist or tilt the cone while lifting it. Lift the cone smoothly within approximately 5 Β± 2 seconds. Perform the test promptly after obtaining the concrete sample. If the concrete shears off or collapses substantially, the test should be repeated according to ASTM C143/C143M; the type of slump should be noted where applicable. Reference: ASTM C143/C143M, Standard Test Method for Slump of Hydraulic-Cement Concrete.
4 416
17
ASTM C143/C143M β€” Standard Test Method for Slump of Hydraulic-Cement Concrete. ASTM slump test procedure 1. Apparatus Slump cone (Abrams cone): 300 mm high, 200 mm bottom diameter, 100 mm top diameter. Tamping rod: 16 mm diameter, 600 mm long, rounded at one end. Rigid, non-absorbent base plate. Scoop and measuring scale. 2. Sampling Obtain a representative concrete sample according to the applicable ASTM sampling procedure. Remix the sample sufficiently before testing. 3. Moisten equipment Dampen the inside of the cone and the base. Place the cone on a level, rigid, non-absorbent surface. Hold the cone firmly in position. 4. Fill the cone Fill the cone in 3 approximately equal-volume layers. For each layer: Rod 25 times uniformly over the cross-section. For the second and third layers, penetrate the previous layer slightly while rodding. The final layer should slightly overfill the cone. 5. Strike off After rodding the top layer, strike off the concrete level with the top of the cone. Clean away concrete around the base. 6. Lift the cone Raise the cone vertically and steadily, without twisting or lateral movement. Complete the lifting operation in approximately 5 Β± 2 seconds. 7. Measure slump Immediately measure the vertical difference between the original height of the cone and the displaced center of the top surface of the slumped concrete. Report the slump to the nearest 5 mm (ΒΌ in.). Important ASTM points Item ASTM requirement Number of layers 3 Rodding per layer 25 strokes Cone height 300 mm Top diameter 100 mm Bottom diameter 200 mm Rod diameter 16 mm Cone lifting time 5 Β± 2 s Slump measurement Vertical difference Note: ASTM C143/C143M is specifically for determining the slump of plastic hydraulic-cement concrete. A concrete that shears or collapses significantly may require the test to be repeated, with the result interpreted according to the standard.
2 947
18
Right or wrong?
Right or wrong?
2 431
19
No text...
3 293
20
Prime coat
Prime coat
3 680