ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π
π Telegram kanali ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π analitikasi
ππ’π―π’π₯ ππ§π π’π§πππ«π’π§π (@amazonengineering) Ingliz til segmentidagi kanali faol ishtirokchi. Hozirda hamjamiyat 17 456 obunachidan iborat bo'lib, TaΚΌlim toifasida 11 702-o'rinni va Hindiston mintaqasida 22 824-o'rinni egallagan.
π Auditoriya koβrsatkichlari va dinamika
Π½Π΅Π²ΡΠ΄ΠΎΠΌΠΎ sanasidan buyon loyiha tez oβsib, 17 456 obunachiga ega boβldi.
10 Noyabr, 2026 dagi oxirgi maβlumotlarga koβra kanal barqaror faollikka ega. Oxirgi 30 kunda obunachilar soni -197 ga, soβnggi 24 soatda esa -4 ga oβzgardi va umumiy qamrov yuqori darajada qolmoqda.
- Tasdiqlash holati: Tasdiqlanmagan
- Jalb etish (ER): Auditoriya oβrtacha 13.10% darajada jalb etiladi. Nashrdan keyingi dastlabki 24 soatda kontent odatda umumiy obunachilar sonining 4.73% ini tashkil etuvchi reaksiyalarni toβplaydi.
- Post qamrovi: Har bir post oβrtacha 2 287 marta koβriladi; birinchi sutkada odatda 826 ta koβrish yigβiladi.
- Reaksiyalar va oβzaro taβsir: Auditoriya faol: har bir postga oβrtacha 2 ta reaksiya keladi.
- Tematik yoβnalishlar: Kontent density, construction, moisture, bridge, compaction kabi asosiy mavzularga jamlangan.
π Tavsif va kontent siyosati
Muallif resursni shaxsiy fikrni ifoda etish maydoni sifatida taβriflaydi:
βExploring the world of Engineeringβ
Yuqori yangilanish chastotasi (oxirgi maβlumot 11 Noyabr, 2026 da olingan) sababli kanal doimo dolzarb va katta qamrovli boβlib qoladi. Analitika auditoriya kontent bilan faol hamkorlik qilishini, uni TaΚΌlim toifasidagi muhim taβsir nuqtasiga aylantirishini koβrsatadi.
Ma'lumotlar yuklanmoqda
| Sana | Obunachilarni jalb qilish | Esdaliklar | Kanallar | |
| 11 Noyabr | 0 | |||
| 10 Noyabr | +1 | |||
| 09 Noyabr | 0 | |||
| 08 Noyabr | 0 | |||
| 07 Noyabr | 0 | |||
| 06 Noyabr | 0 | |||
| 05 Noyabr | 0 | |||
| 04 Noyabr | 0 | |||
| 03 Noyabr | 0 | |||
| 02 Noyabr | 0 | |||
| 01 Noyabr | 0 |
| 2 | Matn yo'q... | 2 342 |
| 3 | Matn yo'q... | 2 114 |
| 4 | Matn yo'q... | 2 214 |
| 5 | Matn yo'q... | 1 987 |
| 6 | Document from ... E.N.G.R | 2 029 |
| 7 | Document from ... E.N.G.R | 1 969 |
| 8 | Matn yo'q... | 2 558 |
| 9 | Document from ... E.N.G.R | 2 146 |
| 10 | R_P_Johnson_Composite_Structures_of_Steel_and_Concrete_Beams,_Slabs.pdf | 2 561 |
| 11 | Matn yo'q... | 2 586 |
| 12 | Matn yo'q... | 2 652 |
| 13 | Matn yo'q... | 3 938 |
| 14 | https://t.me/theamazonengineering | 4 423 |
| 15 | Matn yo'q... | 4 509 |
| 16 | Slump Test of Concrete β ASTM C143/C143M
1. Aim
To determine the slump of fresh concrete as an indication of its consistency/workability, in accordance with ASTM C143/C143M.
2. Apparatus
Slump cone (Abrams cone):
Height: 300 mm
Bottom diameter: 200 mm
Top diameter: 100 mm
Tamping rod:
Diameter: 16 mm
Length: approximately 600 mm
Rounded end
Rigid, level, non-absorbent base
Scoop
Measuring scale
3. Procedure
1. Dampen the inside of the slump cone and the base plate.
2. Place the cone on the level base and hold it firmly.
3. Fill the cone with fresh concrete in three approximately equal layers.
4. Rod each layer 25 times using the tamping rod.
5. When rodding the second and third layers, allow the rod to penetrate slightly into the underlying layer.
6. After rodding the third layer, add concrete if necessary and strike off the surface level with the top of the cone.
7. Remove excess concrete around the base of the cone.
8. Lift the cone vertically and steadily, without twisting or lateral movement. The lifting operation should take approximately 5 Β± 2 seconds.
9. Allow the concrete to subside.
10. Measure the vertical difference between the original height of the cone and the displaced center of the top surface of the concrete.
11. Record the slump to the nearest 5 mm (ΒΌ in.).
4. Calculation
\[
\boxed{\text{Slump} = H_c-H_s}
\]
Where:
\(H_c\) = height of the slump cone = 300 mm
\(H_s\) = height of the slumped concrete at its center
Example:
If the height of the slumped concrete is 220 mm:
\[
\text{Slump}=300-220=80\text{ mm}
\]
Slump = 80 mm
5. Observation Table
Trial Height of cone Height of slumped concrete Slump
1 300 mm _ mm _ mm
2 300 mm _ mm _ mm
3 300 mm _ mm _ mm
6. Result
> The slump of the given fresh concrete sample was __ mm.
7. Precautions
The base must be level, rigid, and non-absorbent.
The cone must be held firmly during filling and rodding.
Rod each layer exactly 25 times.
Do not twist or tilt the cone while lifting it.
Lift the cone smoothly within approximately 5 Β± 2 seconds.
Perform the test promptly after obtaining the concrete sample.
If the concrete shears off or collapses substantially, the test should be repeated according to ASTM C143/C143M; the type of slump should be noted where applicable.
Reference: ASTM C143/C143M, Standard Test Method for Slump of Hydraulic-Cement Concrete. | 4 416 |
| 17 | ASTM C143/C143M β Standard Test Method for Slump of Hydraulic-Cement Concrete.
ASTM slump test procedure
1. Apparatus
Slump cone (Abrams cone): 300 mm high, 200 mm bottom diameter, 100 mm top diameter.
Tamping rod: 16 mm diameter, 600 mm long, rounded at one end.
Rigid, non-absorbent base plate.
Scoop and measuring scale.
2. Sampling
Obtain a representative concrete sample according to the applicable ASTM sampling procedure.
Remix the sample sufficiently before testing.
3. Moisten equipment
Dampen the inside of the cone and the base.
Place the cone on a level, rigid, non-absorbent surface.
Hold the cone firmly in position.
4. Fill the cone Fill the cone in 3 approximately equal-volume layers.
For each layer:
Rod 25 times uniformly over the cross-section.
For the second and third layers, penetrate the previous layer slightly while rodding.
The final layer should slightly overfill the cone.
5. Strike off
After rodding the top layer, strike off the concrete level with the top of the cone.
Clean away concrete around the base.
6. Lift the cone
Raise the cone vertically and steadily, without twisting or lateral movement.
Complete the lifting operation in approximately 5 Β± 2 seconds.
7. Measure slump
Immediately measure the vertical difference between the original height of the cone and the displaced center of the top surface of the slumped concrete.
Report the slump to the nearest 5 mm (ΒΌ in.).
Important ASTM points
Item ASTM requirement
Number of layers 3
Rodding per layer 25 strokes
Cone height 300 mm
Top diameter 100 mm
Bottom diameter 200 mm
Rod diameter 16 mm
Cone lifting time 5 Β± 2 s
Slump measurement Vertical difference
Note: ASTM C143/C143M is specifically for determining the slump of plastic hydraulic-cement concrete. A concrete that shears or collapses significantly may require the test to be repeated, with the result interpreted according to the standard. | 2 947 |