123. For small projects, which method is recommended for project planning?
A. CPM
B. Bar Chart â
C. PERT
D. line of balance
Answer: B (Bar Chart)
122. Which one of the following is incorrect about impurities in mixing water?
A. It can result in abnormal setting time
B. It can result in efflorescence
C. It doesn't affect hardened state of concrete
D. It can result in corrosion of reinforcements
Answer: C (It doesn't affect hardened state of concrete)
121. Which one of the following is different interms of specification and methods of measurement?
A. Pit excavation
B. Site clearance
C. Cart Away of excavated soils
D. Bulk Excavation
Answer: B (Site Clearance)
120. What is the most important aspects of Construction site supervision?
A. To control productivity
B. To control the rise in price
C. To control the quality of the project
D. To control the Cost
Answer:Â CÂ (To control quality of the project)
Repost from Exit Exam for CoTM Students @HHC,AU
119: Removal of Earth for high way formation is called:__
A. Embankment
B. Sub grade
C. Excavation
D. Filling
Answer= C (Excavation)
Repost from Exit Exam for CoTM Students @HHC,AU
119: Removal of Earth for high way formation is called:__
A. Embankment
B. Sub grade
C. Excavation
D. Filling
Answer= C (Excavation)
Repost from Ethio Construction Engineering
The value of concrete strength is given at
Repost from Ethio Construction Engineering
đá¨áááŁáł áá (Construction Law)
đá˘áľáŽáľáŤ á¨ááľá á
ááŁá¸á á¨áŽááľáľáŤá¨á˝á ááá˝" - áááŤá˝á á˘áľáŽáľáŤ á¨áŽááľáľáŤáá˝á á˘ááąáľáľáŞáá áááľá°áłá°á á¨ááľá áááŁá¸á á ááá˝ (Decree)ᣠá°ááŚá˝ (regulations)ᣠáááŞáŤáá˝ (Directives)ᣠáľáłááłááśá˝ (Manuals)ᣠá¨áá á°ááśá˝ (Contract Conditions)ᣠá
áá˝ (Laws and codes)ᣠáááŚá˝
(Negarit) á ááľá˘
âśď¸áĽááá
á ááĽááá˝ á áááľ ááľáĽ ááá°áĽ (ááá á ááá áĽá ááá á ááá) áááľ áĽáá˝áááá˘
đą1.á ááá á áá á°á¨á áŤá á¨áŽááľáľáŤáá˝á áá áá
ááá˝
âş(Federation Internationale Des Ingenieurs Conseils): EU
condition of contractᣠNEC- new
contract, UK (á á°áá ááá ááᎠáá á¨ááá) áá¸áá˘
â¨á¨áá
áŁáťáá ¡ ááááá˝á áĽáá° á᪠ááŹáľ (á á°áá á¨áááŁáł ááĽá áśá˝á áĽáŤáľ á á¤á°áá¨áŤ ááááŤáľ) áĽáá ááááá˘
đá¨áĽááá
á ááľáĽ:- American Society Testing Materials (ASTM), and AASHTO (American Association of State Officials) á˛áá Indian Standards (IS) áĽá áĽáá áĽá
á áá á¨ááá áá¸áá˘
đą2. á¨ááá ááľáĽ ááááá˝: Building and Transport Construction Design Authority (BaTCoDA - á¨áááŁáł áĽáŤáá˝áá ááĽá áśá˝á áá á áááľááľ)ᣠPublic Procurement Agency (PPA - áá¨áŤáł áĽá á¨áľááááľ áá á°ááľ
á áľá°áłá°á)ᣠCivil Code, Civil Procedural codes, Ministry of Works and Urban Development Standard Conditions of Contract (MOWUD Directives), FDRE constitution, áá°áŤá áááŞáľ ááᣠ(Negarit Gazieta), á á¨ááá á¨ááťáťá á¨áááť áááŞáŤáá˝ áĽá áľáłááłááśá˝áŁ á¨á፠áĽá á¨áĽáŤ áááľ á ááá˝ á¨ááłá°ááľ áááá áłáá˘
đ§á áĽááἠá áŽááľáľáŤhá˝á ááá áá á°ááŁáŤá áá°á¨á á áá˝áá á¨ááŁá á¨áááŞáą á
áá˝ á áááŠá áááľ
áá¨áĽáłáᣠááááŤáąá ááá á
áá˝ á¨áŚáłáŁ á¨áĽáŤáŁ á¨á°á áááᣠá¨ááĽáľá
áá´áłáŁ á¨ááĽá¨áľáŁ á¨ááááá ááľá áá á¨á°áŤáŤá áľááá áĽá á¨áŽááľáľáŤáá˝
á´áá°áŠá áĽááá
áá á¨áááá áľ á˘ááąáľáľáŞ áľááá ááá˘
#ConstructionLaw
đŤľá¨ áŽááľáľáŤáá˝á áľáŤ áĽá á¨á¨áł á áľáŠáą áĽáá˛á°ááľá á¨áłá˝ áŁáá á¨á´áááŤá áťááá˝áá áááááđ
t.me/ETCONpWORK
đŠááŤááŠá áŤá°áĄ á á´áááŤá @ETCONpBot ááťáááá˘
@etconp
Repost from Ethio Construction Engineering
đᨠáľáááľ áĽáŤá á¨á áááą
đąáĽáŤáጠá¨ááááĽáľ á áľá°áłá°á ááĽáŞáŤ á¤áśá˝ á ááľá áááŁáł áá°ááŤá áááľá áľ á¨á¨áł á¨áááŁáľ áá´áł á ááŁá¸á?
đá ááľá áá ááááľá¨áľ á°ááá á áŤááľ á áŚáľáľ á áááľ ááááľ á¨áá áᢠáĽáŞ (Invitation to bid)
ááááĽáá¸á áá˝ááá˘
âşáĽááá
á ááááśá˝ á¨á ááľ áĽá á°ááá áá áľááľá (Negotiation)áŁ
á¨á°áá¨áĄ áĽááśá˝á á¨ááá á (Short listed) áĽá á¨ááľ á¨á¨áł á¨áááŁáľ (Open Tendering)
ááááľ áá¸áá˘
âśď¸áľááľá (Negotiation á¨á°áŁáá ááááľ á°ááŁáŤá á¨ááá á ááľ áŽááŽáááľ áŁáá¤áľ áááŁáłáá ááŤá¨ááá áá˝áá á°áĽá á¨ááłááá áľ á ááľ á°ááŤá áá á¨áĽááľ áľááľáá á°áááŠá á¨áá¨ááá áá á ááŤá á°áá ááŽáááąá á°ááŤáŽá˝ á á áŤáŁá˘á á¨áááá á¨áá á¨ááá¨áĽ áá áá
ááááľ á¨ááľá°áá á˛áá á¨áááŁáłá áŁáá¤áľ á¨ááŤááá áľá á ááľ á°ááŤá
á¨á°áá¨áĄ áĽááśá˝á á¨ááá á (Short listed) á¨ááŁáá á°áá á á°áá¨áĄ ááá á ááŽáááą á áááľ áá á¨áá°á áááľ áŤáá¸á ááááłáŁ ááľáĽ áĽá á°áá á ááľ ááá˝ áááŁáł áá á°ááŁáŤá
đ(áááłáጠá°á¨á 1 áĽá á°á¨á 2 á á
áá á°ááŤá)ᣠááá áá áááľ áŤáá¸áᣠá áŁáĄá áá˛áľ áĽáŤ áá áááľ á°ááá°á áá አá¨áá˝á á˛áá áá
á¨ááá¨áľ áĽáŤ á¨áááŁáľ (Open Tendering) á¨ááŁáá á¨áá˝á á¨á¨áł ááá˘
â¨á¨ááŤá°ááá á¨áá áĽá ááŤá¨ááá á¨áá˝á áĽá áĽá áá á¨áá áááŁáł áá
á¨áá°áŤá°á á˛áá ááá˘
âłá ááľ ááŽáááľ áá¨ááá á¨áá˝áá
á˛áá ááᢠáĽá áá á¨áŁáĄá áá˛áľ
á¨áá°á¨á á˛áá á°ááŤáŽášá á á°á¨á
á ááŽáááľ á áááľ (á áľááá
ááľáĽ áááŁáł áŤáá ...) á ááŤá áĽááᣠáĽáá áĽá áĽáá á áá Short listed ááááľ ááŁááá˘
âĄď¸áááľ á¨á¨áł ááááá á¨áááľ áááľ áŤáá á áŤá ááłá°áá áľ á°áá
Bount á ááľá áĽáá áá ááĽá 3140 á áŤááľ áá áĽáá˛ááá áááľ á¨á°á°á á¨ááá°áą áá¸á áááľ áá á áá°ááá˘
â¨áááľá¨áľ áŤááŁá¸á á á¨á¨áł 3141 áľááááá˝ áá°á¨áľ á¨ááááĽáľá ááá á¨áá áĽá á ááľ áĽáá˛á ááľ á¨á°á°ááá á˘ááá áá°áá áĽáá˛áᥠá˘ááá áá á¨ááááĽáľ á áľá°áłá°á ááĽáŞáŤ á¤áśá˝ áá áááťááľ áľáááá á á áá
ááĽá 649 á¨á°á°ááá ááá˘
âşáá
á ááááĽáľ ááĽá ááĽá¨áľ á áľá°áłá°á á áá
ááĽá 649/2001 áĽá á ááá˝ á°ááááˇá ááááŤáąá á ááľá
ááŽáááľ ááá¨ááá á á á á
á áŤáá¸á ááá á áá áĽá ááááá á°ááŤáŽá˝
áŁáá áľ áááł á¨ááááĽáľá áááŁáł áŤáá¨á¨áł ááľá áľ á¨áááťá áĽá á¨ááááĽáľá á ááľ áĽáá
áľáá´ áŚá˛áľ áááľá¨á á¨á¨áł á°ááŤá ááááľ áľááá ááá˘
âśď¸á¨á¨áłá áĽááŤá (National) ááá áááá ááá (international) ááá áá˝áá áĽáá á¨á¨áł ááľ ááá˘
á á¨á¨áłá áá á¨ááłá°á áĽá á°áááŽá˝ áĽáá°áá á¨á°á¨ááá áĽá áአááááľá á á
á á¨áá áá
ááŽáááľ á¨áá áá áĽáá° ááŽáááą á¸áŁá ááá á¨áááá¨áłá¸á á¨ááááĽáľ ááľáŞáŤ á¤áśá˝ á°ááŤáá°á áĽá ááľááá áľ ááááĽáľ áľááľá (Negotiation) ááááľá á°á á
á á áľááľá
áĽáť áá ááá˝á á¨áá˝áá áľ á ááŁáĽ áááŤáá˘
đá áĽááἠá¨á¨áł áááŁáą á¨áá°áąá á ááŁáĽááľ áĽáá°áá¨áá፠á ááľ ááááľ áááá áĽáá á á¨á¨áł ááľáľá á°áŤáŤá˝ áľáá°áá¨á áĽá á á¸ááááą áľáá°ááḠáĽáťáá á¨áááŁáł áá áĽáá°áľáá¸á á ááá ááá˘
#ConstructionLaw
@etconp
Repost from Ethio Construction Engineering
đá¨áááŁáł ááá áááľ áľááá
á¨áĽ
âşSubmission of Application and Plans
đá¨á˘áľáŽáľáŤ á¨ááá á áá
áŽáťáłáŹ/áŞáşáŠ ááá áááľ áá°á¨áľ âá¨áááŁáł áĽáŤ áááŤááľ á¨áááá ááááá á°á áá¨á°áá á áľá°áłá°á ááá áá°á°á¨áá á áŤá áááá¨áť áá
á¨áĽ áááá áłáá˘
âśď¸áááá áááááŁáľ á¨áááἠáááá¨áť á¨á¨á°áá á áľá°áłá°á ááá á¨á°á°á¨áá á áŤá ááá áĽá áŁáááá á
á
áá á¨áľ áá áá
á áĽáá° áááá ááľáĽ á áááľ á˛áááá áŞáááľ á¨áŤá ááá á áá áľá˘
âśď¸á¨áááá¨áťá áá á á ááłá áŁá áľááŤáá˝ á¨ááá áá ááááśá˝áá á¨áłáá áŚáłáá˝á áľá á¨áááá áá¨ááá˝ áá
á¨áĽ ááááŁá¸ááᢠá áááŤáš ááá á ááááŁá áľ áŚáł ááá á ááĽá¨áą áá á¨áááł ááĽáľ áĽááłáá á¨ááŤá¨ááἠááľá¨á áá
á¨áĽ áááá áłá
âśď¸á¨ááááĄáľ á ááśá˝ á áá
á áá
á á ááá˝ ááá˝ á¨á°ááá¨áąáľ ááááłá¸áá ááá¨ááἠá á á áááł á¨á°áá ááá ááááŁá¸ááâ
đąAccording to Proclamation No. 624/2009 âAny person intending to carry out construction shall submit an application to the urban administration or designated organ. The application to carry out construction shall be made on an application form prepared by the urban administration or designated organ and shall consist of a design and report according to the category of building in question.
âşThe application shall be accompanied with a reference to main roads and names of prominent places. The applicant shall submit proof of possession rights to the land or property on which the construction will take place. The documents to be submitted shall be sufficiently complete to determine compliance with this Proclamation and other lawsâ
#ConstructionLaw
đŤľá áłá˛áľ ᨠáľáŤ á
áĽá ááľáłáá
áŤáá˝ áĽá ᨠáŽááľáľáŤáá˝á á¨á¨áłáá˝ á áľáŠáą áĽáá˛á°ááľá á¨ááá á¨áłá˝ áŁáá ááá ááĽá°á á¤á°á°áĽ áááđ
https://t.me/ETCONpWORK
Repost from Ethio Construction Engineering
đEthiopian Construction Law
đA proposal for a new procedural architecture suitable for Ethiopian construction conflicts.
âśď¸Many legal systems are adopting a new way to facilitate the resolution of construction-related disputes. Adjudication is the name given to this new procedure.
âşAdjudication in the context of construction contracts refers to the process of settling disputes or disagreements that may emerge between the contract's parties.
âşIt is a type of alternative dispute resolution (ADR) intended exclusively for the construction sector.
âşAdjudication often entails choosing an adjudicator, who evaluates the disagreement and renders a binding judgement on problems like as payment, modifications, delays, faults, or other contractual difficulties.
The adjudicator's decision is enforceable and temporary, which means that it gives a speedy settlement to the disagreement, allowing the construction project to move forward while the parties work towards a final resolution, such as arbitration or litigation.
This form of conflict settlement has numerous advantages for the construction industry. It ensures, among other things, a quick and efficient conclusion since it is designed to deliver a quick decision, allowing the parties to move forward with the project and minimise delays. It is also more cost effective because the design makes it less formal, which results in fewer legal and administrative costs for the parties involved. It also allows for experts and specialised adjudicators who can make well-informed rulings.
đąAlthough adjudication rulings are often interim, providing temporary answers to contentious issues until final resolution through other procedures such as discussion or arbitration, they are legally binding and enforceable.
âşAdjudication is an effective method of resolving construction conflicts. However, it requires an efficient domestic legislative framework that defines the legal basis and procedures for construction dispute arbitration.
âşThe scope of conflicts that can be adjudicated, the nomination process for adjudicators, timetables for resolution, and the enforcement of adjudication rulings should all be outlined in this legal framework. Without such a foundation, adjudication would be a paper tiger.
âşAdjudication is frequently discussed as a technique of resolving disputes in Ethiopian building contracts. The legal structure However, Ethiopia lacks the requisite legal support for adjudication. There are no legal rules that assure the enforceability of adjudicator rulings. As a result, unlike arbitral judgements, adjudicator rulings cannot be directly enforced by ordinary courts. Thus, until such legal flaws are addressed, Ethiopia will be unable to reap the full benefits of adjudication.
âşWe must investigate strategies to strengthen Ethiopia's adjudication base by lobbying for a new procedural design fit for building contracts.
#ConstructionLaw
@etconp
Repost from Ethio Construction Engineering
đá¨áááŁáł á˛ááá áá°ááŤá áá°áŁáá?
đá ááľ áááŁáł á˛ááá á á ááŤáŞ áľáá
áľ áŁáááŤáá˝ á¨á°á°áŤ á áá áá á¨á˛ááá á°ááą á áá¨ááľ á
á
(hard copy) áĽá á áśááľ á
á
(soft copy) ááŁáá¤áą áá°áŁáá˘
đ§ááá áá á â á¨á°á áááľ áĽá áĽáŤáá˝ áááľá´á á áá
á ááá˝ 6 áááľ á ááá˝ 1 (Ministry Of Works And Urban Development Standard Conditions Of Contract Clause 6
âş(1) âCustody of Drawingsâ) áá°á¨áľáŁ á¨áááŁáł á˛ááá á¨áááŁáł ááľáľá áááŤá¨áááá á°ááŁáŁáŞ áááá˛áľ (supervision engineer) á áśááľ á
á
(soft copy) áá°áĽ á¨áá˝á á˘ááá ááááŁáł á°ááŤáŠ (contractor) áá°á áľ áŤáá áľ áááľ
âş(2) á¨áá¨ááľ á
ááá˝á á˛áá áŤáááá áá፠á áŁáá¤áą á᪠áááááľá áá°ááŤáŠ áá°á áľ á ááŁá¸áá˘
âśď¸á¨áááŁáł á°ááŤáŠ á¨ááááá á°á¨á᪠á
ááá˝ áŤá á áŤáą á᪠áĽáá˛áŁáááľá áĽáá˛á°áĄáľ ááľá¨á áá˝ááᣠááá áá áŤááŁáá¤áą áááľ ááŁááľá ááŚáľá°á (áá) ááá á áłáá ááľá áľ á°ááŤáŠá áŤáľá ááááᢠáááŁáłá á˛á ááá
á°ááŤáŠ á áá áá á¨áľ á á
á á¨áá¨áĄáľáá á¨á°á¨á¨áŁá¸áá áááá á˛áááá˝ ááááá˛áą (Engineer) áĽáá˛áááľ á áá áá´áł á áá áľá˘
#ConstructionLaw
@etconp
Repost from Ethio Construction Engineering
âá°áá ááľ á¨áťááá˝á á¤á°á°áŚá˝ áᏠáĽáľá˛ ááş á¨áłá˝ áŤáá˝á áĽáŤá áĽáááŤááŁáľ
đá ááłááľ á¨áááŁáł áľáŤ ááá˝ áá á¨ááŽáááľ á¨áááá¨áľ á¨ááłáľ áŤáł (Liquidated Damage) áááľááľ 0.1% x á¨á᪠á°áŤáá˝á (Remaining Works) á¨áá ááá ááŤá°áłáá˘
đ§ááĽáá°ááá
á áááľ ááá˝ á¨áá áááŤá¸á áŤáá á áá Interim payment á˘á á¨á
Liquidated Damage áĽáá´áľ áá°á áá˝áá?
đ§á¨áá ááá áŤáá á áá á¨á°áľáŠ áĽá á áá፠á°ááą áá á á°áŤá°áąáľ áľáŤáá˝ áá áĽáť áá áááľ á á ááá á¨áá ááá áŤáá á áá á á°á°áŠáľá áŁáá°á°áŠáľá (áá°ááľ á áá°áŠáľ) áľáŤáá˝ ááá á ááŤá°áľ?
#ConstructionLaw
đŠááłáĽ á áľá°áŤá¨áľá á¨áłá˝ áŁáá ááá áááá áĽá áĽáááŤáá áľ
.
http://t.me/COTMp
Repost from Ethio Construction Engineering
đá¨áĽáá ááá á¨áĽáá˝áľ ááŤáŁ (Maintenance or Defect Liability Bond)
đąá¨áĽáá ááľáľá á¨á°á ááš á¨áááŁáł ááĽááśá˝áá á¨áĽáŤ á á°áŤá ááľááśá˝á ááá¨áá¨á á áá áĽáŤ á°ááŤáŠ áááŽáááľ áŁáá¤áą á¨áááŁá ááľáľá áááĄáĄ
đ§á á°ááá á¨áá áľá áŞá´áá˝á ááááĽ/ááŤáŁ (retention) áááł áĽáá°á°ááá¨á°á áá ááľ áááľ áá á¨ááŤáá áľ ááááŤáľ á¨áĽáŤáľ ááľááľ áá á¨á°áŤáŤá áĽáŤáá˝á ááá áá áááĄáĄ
đ§á áááá
á áľá áá áŤá á
áľá áááł ááľáľá áĽáŤ á°ááŤáŠ áĽáá˛áŤááἠá¨áá°á¨áá áľ ááááŤáľ á á
ááťá áááŁáł áá á¨ááłáŠ ááľááśá˝á ááá áá á áá áááĄáĄ
đąá¨áĽáá áĽá áĽáá˝áľ á ááááľ ááŤáŁ á ááááľ á¨áá áááἠááŤáŁ áááł áĽááłá á á¨áááá áááĄáĄ
âşá ááἠáĽáŤ á°ááŤáŠ ááŁáá¤áą áá°áá°á áááłáľ áᢠáááááĄáĄ
âśď¸áááłááĄ- á á˛áŞá á¨áááŁáł áĽáŤáá˝ á á°ááá á á/á
/á 3039 áĽáá˛á
á¨áá ááá áŁááĄ-âáĽáŤ á°ááŤáŠ áĽáŤáá áŤáľá¨á¨á á áľ áá ááᎠáľááááŤá á á°áŤáᣠáľá áĽáŤá áĽá áľáá ááŤáŤááą á10 (á áľá) á ááľ ááľá (guarantee/ warranty) áááĄáĄ á áá
á áá ááľáĽ á áĽáŤá ááľááľ ááá á á°á°áŤá áľ ááŹáľ ááááľ ááááŤáľ á á°á°áŤá áĽáŤ áá ááá°áá°á ááĽááľ ááá áá áá¸áľ á áá áááĄáĄâ
đ§á á°ááłáłá ááአá¨ááááľáľ á¨áááŁáł ááá˝áá á á°ááá¨á° á¨ááľááĽáá áá á¨á ááá˝ 3277-3282 áá á¨10 (á áľá) á ááľ á¨áĽáá˝áľ ááľá áá áŤáľáááŁááĄáĄ
â¨á¨áá°áŤá á á
áá á/á¤áľ á á
á˝ 18 á á°/á/á 101378 á á á˛áľ á á ᣠááá ááłá˝ áŁááľááŁá áĽá áá°á áŽááľáľáŤáá˝á á/á¨á°/á¨á/ áá
á á ááŤá¨á á áá á¨á áááá á¨áĽáá ááľáľá (maintenance bond) ááá áĽáá°áá˝á áŤá°á° á áá á ááľ áĽáŤ á°ááŤá á á áŤá á
ááť áá á¨á°á¨á á° áĽááá á á¨á á°áŤá ááľááľ á ááá áľ áááł áá°ááľ á¨ááłáá á¨áá¨á°áľ á¨á á°áŤá ááľááľ ááá áá˝áá á áá ááááŤáľ áĽáŤ á°ááŤáŽá˝ áá°áŠáľ áĽáŤ á¨áá¨á¨áť áá፠á¨ááááľ ááĽáľ áá¨áá¨á á ááŁáĽááľ á¨ááá áááá áĽá°ááłá
á¨áá áľááá á°áĽáśá áłááĄáĄ
#ConstructionLaw
đŤľYOUTUBE áťááá˝á áŤáá°áááá á¨áłá˝ áŁáá ááá ááĽá°á SUBSCRIBE áŤáľááđ
https://www.youtube.com/@ETHIOCONp
@etconp
Repost from Ethio Construction Engineering
đᨠá
áá áááŁáł áá°áśá˝
đ§1.Foundation
âşáááá´á˝á á¨áááá á áŁá á áľááá ááá áááĄáĄ
âşá¨áááŁáł áĽáá
áľáá´ á¨áááá¨á ááá á¨áľ ááŹáľá á áááá áĽá á¨á፠á ááááŁáľ áááĄáĄ
âşáĽáą á¨áááá á¨áłá˝áá ááá ááá˘
đ§2. plinth
âşá ááŹáľ á°á¨á áĽá á ááŹáą ááá ááŤá¨á áŤáá á¨ááľááł ááá áááĄáĄ
âşplinth áĽááá áá á¨áľááá ááŁá áľáŤ ááá˘
âşáá á¨áąá á áĽáá¨áľ áá á¨áá áŁá¨ááá ááá á áá ááľááłáá ááá°áá á ááľ ááá áŁáá ááŁááá˘
âşá ááá á ááľ áá áĽááĽáĽ áá¨áá፠áŽááľ áá°áŁááĄáĄ
âşáĽáą áĽááá áá ᨠ75 á.á ááá¨áľ áŤáá á¨áŽáááŞáľ áŽááľ áááĄáĄ
đ§3. Walls and columns
*ᨠwall áĽá á¨column á°ááŁá á¨áá á¨áąá áááľ áá° áłá˝ áááľá°ááá á¨á
áááá áááľ á á ááŁá áá° áłá˝ ááľá°ááá áá áĄáĄ
đ§4. Sill áĽá lintels á¨ááľáŽáľ ááá á ááĽáł á¨áá˝á áá áááἠá¨áá áľááĄáĄ
*á ááŹáą áá ᨠ50 áá ááľá áĽáľá¨ 75 á.á ááá¨áľ áŤáá á°á¨áŁá áŽáááŞáľ áŽááľ ááááŁááĄáĄ
*áá
áŽááľ áĽáá° á°á ááŁáá Lintels R.C.C. ááá áá˝ááá˘
*á¨á አááá á¨ááľáŽáľ ááá á¨áá á áá áŤá áŤáá°áá ᨠáááá ááá¨áľ á á አáĽá á ááľáŽáą áááľ áŚáłáá˝ áá ááášá á ááľá°ááá áá á¨á°áá¨áš á¨áľááá ááŁáá˝ ááá á¨áľááá ááŁáá˝á˘
*áááłá á¨á ááľ á¤áľ ááááľ 3á ááá áá˝áááĄá¨á ááľ á á áááľ 2.10 á¨áá 90 cm á¨á አáá°áá lintel beam á°á á
áá wall ááĽáŤáľ áĽáá˝ááááĄáĄ
đ§5. Door & windows
-á¨á á á°ááŁá á á
ááá ááľáĽ á¨á°ááŤáŠ áááá˝ áĽáá˛áአáĽá á áľááá áá á˛áá á°á°áŤá˝ááľá ááŤáľ áááĄáĄ
*á áŽá˝ ááĽá á á°áťá áá á áá
á°á ááá á áá áľ áĄáĄ á¨á áŠá áľááľ áĽáá° á á áá áá á¨áá˝á áľááá ááá áĽáá
áľáá´ á¨ááŤááťá˝ ááá á áá áľ áĄáĄ
đ§6. Floors
áááá˝ á¨ááá á áľááá á áŤá áá¸ááĄáĄ
*áá°áŤá°ááš á¨áĽáŤ / á áá á áŤáŁá˘ áá°áŁá á¨ááŹáą ááá á¨á°áááŁá by filling brick bats, waste stones, gravel and well compacted áĽá á áĽáŠ áááł á¨áááá ᨠ100 á.á á¨ááá áἠá¨á á¸á ááĽááĽá á ááááľ áááĄáĄ
*ᨠ1: 4: 8 ᣠ100 áá ááá¨áľ áŤáá á°á¨áŁá áŽáááŞáľ áĽáá° ááŁá áá¨áľ ááťáááĄáĄ
*á áá
áá áĽááĽáĽ áá¨áá፠áŽááľ áá°áĽ áá˝áá áĄáĄ
đ§7.Roof
*á¨ááł áá
ááá á¨áááá á˝áá á¨áá°áĽ á¨á
ááá á¨áá°á ááá áááĄáĄ
*áĽáá° áŁáŞáŤ áĽá áĽáá° á¤.á˛.á¤á. áá¨ááľ áŤá á°áá¸áŤáłá˝ áŁáŤ á ááá á¨áááľ á˝áá áá°áŁáᢠááá áá áá°á¨á᪠ááá áááŁáł ááá
áľ á áá°áĄááĄáĄ
*á¨áłá á áŁáŞáŤ áĽáŠ á¨áááľ áá¨áá¨áŤ áá°áŁááĄáĄ
*á ááŁá áŁáŞáŤáá˝ áá°á¨á᪠áááá˝ á á
ááŚáľ áá°áŁá áĄáĄ*terrace á¨áááŞáá˝á áážáľ áá¨ááŤáá˘
*á¨áá áłááŽá˝ á ááá á ááŁá áŁáŞáŤáḠáá á ááá áááᥠáá˝áá
đ§8. step,stair,lift
âşá°á¨ááá˝ á¨ááŹáľ ááá áĽáľá¨ ááŹáľ ááá á°á¨á ááš á°á°áŤá˝ááľ áá°áŁááĄáĄ
âşá ááá ááľááł áá á áŽá˝ áŤáľáááááĄáĄ
âşá¨ 250 áĽáľá¨ 300 á.á áľááľ áĽá ᨠ150 á.á á¨ááł áá°á¨ááá˝ á áŁá áĽáŠ áá á áá::
âśď¸á ááá ááááľ áááł áááľ á°á¨áłáłá á°á¨ááá˝ áá á á¨á°áᨠá áááááĄáĄ
âşá¨ááááá á¨áĽááááá˝ áĽááľ á ááŹáą áĽá á ááŹáą á°á¨ááá˝ ááŠááľ áá á¨á°áá á¨á° ááá˘
đ§9.Finishing
âśď¸á¨áłá˝áá ááŁá (áŁáŞáŤ) ᣠááľááłáá˝ áĽá á¨ááá ááŁá á¨áááľá°á áá ááľááł áá áááŞáŤ áŤáľáááá¸áááĄáĄ
đ§10. á¨áááŁáł á áááááśá˝ á¨áá
á á
ááŚáľ ᣠá¨á áŤáŁá˘ á˝áłáľá á¨áá áá
á
á áĽáŤáὠᣠá¨á¤áááľáŞá á á
ááŚáľ áĽáŤ áĽá á¨áá ἠá°ááłáá˝ áááŁáł áĽá á¨ááłáŤ ááłáŽá˝ áá á¨áááŁáł á áááááśá˝ áá¸ááĄáĄ
#BuildingConstruction
đŤľááŁá áŞáľáŽ ááá áľáááá°áŤá áľ á¨áłá˝ áŁáá ᨠYOUTUBE ááá˝á ááĽá°á SUBSCRIBE áŤáá
https://www.youtube.com/@ETHIOCONp
Repost from Ethio Construction Engineering
The beams supporting the stair steps are generally known as:
Repost from Ethio Construction Engineering
In limit state design approach, spacing of main reinforcement controls primarily
Repost from Ethio Construction Engineering
The process of incorporating changes and
rescheduling or replanning is called
Repost from Ethio Construction Engineering
đá á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áŁááľááŁá á¨áŽááľáľáŤáá˝á áááśá˝ á ááłáľ á°ááŁáŤáľ
đ§á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áŁááľááŁá( áľááŁáᣠá°ááŁáá á á°á¨áááľá áááá°á á¨ááŁá á¨áááľáľáŽá˝ áááá¤áľ á á°áἠááĽá 524/2015 á¨á°á°áĄáľ áľááŁá áĽá á°ááŁáŤáľ ááŤá¨á á á ááá
5(16) áľá áŁááľááŁá á áŽááľáľáŤáá˝á á˘ááąáľáľáŞ ááľáĽ á¨áááą á ááááŁáŁáśá˝á á á ááŤá á¨áááľ áááť áá´áá˝ áááľá áĽáá˛áŤáá áŤá°ááá á áá á°á°áááááĄáĄ
âşáá
áá á°á¨áľáá á áá¨áá ááá
á á¨áŽááľáľáŤáá˝á áááśá˝ á ááłáľ á᪠áĽáŤ á áľááá á¨áľáŤ áááá á áá
Ꭰá áľáá ፠áá áááááĄáĄ
âşá¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áŁááľááŁá á¨áŽááľáľáŤáá˝á áááśá˝ á ááłáľ á᪠áľáŤ á áľááťá áááśá˝ áá° áááľ á¤áľ á¨áááłá¸á á ááľ á ááŤá á¨áááľ á ááłáľ (á .á.á ) áá´áá˝á á áá áá ááá¨á°áą áááśá˝ áááľá áŤáľáááᣠá áá
á áá°áľ á¨áá¨á°ááľá áá¤áśá˝á áŤá¨áááŁáá˘
đ§á°áááŽá˝ á ááááŁáŁáśáťá¸áá á áŤáłá¸á á¨á°áá¨áĄ á¨á .á.á áá´áá˝á á°á á
áá áááłáłá¸áá áá¨áááĽáŁ
đ§á á°á¨áŤáŤáŞ áááá˝ ááŤá¨á áááŤá áááááľá ááľáá ááŁ
đ§á¨á
á á፠á᪠áŤá á¨áŽááľáľáŤáá˝á áŁáááŤáá˝á á á .á.á áá´áá˝ áá ááłá°áá¸áááŁ
đ§áá° á/á¤áľ áááá á˘áᣠáááá á¨áá á¨áá á¨ááŽáááľ áá ááá፠áá ááááľá áŁ
đ§áá° á/á¤áľ áááá á˘áᣠááᣠá¨áá˝ááá á¨á°á¨áŤáŤáŞáá˝ á᪠áĽá ááŽáááą áá á á°ááŤáŠ ááááŤáśá˝ ááá á á¨áá á¨áá á°á¨á᪠ááŞá ááááľá áĽá
đáá° áááľ á¤áśá˝ áłáááą áááśá˝ á áá á ááŤá á¨áááľ áááť áá´ á¨ááľáááľ áá áá°á¨áąá áĽá áááľ á¤áľ áá á¨áááĽá¨áá á¨áĽáŤ áŤá ááááľá á áá¨ááἠá¨áááŁáł ááŽáááśá˝ ááłáááá¸á ááá á á°áŤááá¸á áá ááľáĽ áĽáá˛áá á¨ááľáťá áĽáŤ áŤá¨áááááĄáĄ
đá¨á .á.á áá´áá˝ ááľáĽ á á˘áŽáŁ á¨á°áá¨áĄ á¨ááľááá፠áľááśá˝ áá¨ááááŁ
đá á áľááááľ (Mediation) á ááĽáŤáľ áááľ á á°ááá áááá˝ ááŤá¨á áŤááá á ááááŁáŁáľ á áľááááľ ááááłáľ áŁáááłáŽá˝á á áááŁáŁáľáŁ ááĽáŚá˝á á ááá¨áľáŁ á ááĽáŤáŤáľáŁ á¨á°á¨á°á°á ááá áá°ááľ á¨áá ááá á¨áá á᪠áŁá ááá áááááľ ááá አá¨áá˝á á ááááŁáŁáśá˝á áááłáľ áá¤áąáá á¨ááľáááľ á¨áá áľááááľ á áááŤá¨á ááá¨áľ ááá˘
đá á áľáłáŤáááľ (Conciliation) á ááĽáŤáľ áááľ á á°ááá áááá˝ ááŤá¨á áŤááá á ááááŁáŁáľ á áľááááľ ááááłáľ áŁáááłáŽá˝á á áááŁáŁáľáŁ ááĽáŚá˝á á ááá¨áľáŁ á áááááᣠá ááĽáŤáŤáľáŁ á¨áááľá ááłáŚá˝á á áá
á¨áĽ á¨á°á¨á°á°á ááá áá°ááľ á¨áá ááá á¨áá á᪠áŁá ááá áááááľ ááá አá¨áá˝á á ááááŁáŁáśá˝á áááłáľáŁ áá¤áľ á áááą ááŤá¨á áááŁá áłááá¨á áĽáá°á°á°á á¨áá¨á¨áť áááľ á°ááĽáŽ á áá ááľ á¨áá áĽáá˛áá á ááľá¨á áľááááľ á áááŤá¨á ááá¨áľ áááŁ
đąá áŁáá፠áĽáá (Expert Determination) áá á¨áľ á ááĽáŤáľ áááľ áááśášá ááááłáľ á áá°á¨á áĽá¨áľ ááĽáĽ á á°áᨠá¨ááááľ ááááľ áá á¨áľ á áአáá
ááľ áĽá ááááľ á ááłáá á¨áááἠá¨áŁáá፠á¨ááłá áĽáá ááᤠáá¤áľ á áááą ááŤá¨á áĽáá° áŁáá፠áĽááá ááłá áá áĽáá˛áŤáááá á ááľá¨á ááá¨áľ áááŁ
Via á˘áŽáŁ
@etconp
Repost from Ethio Construction Engineering
PART 2
đ Properly designed cofferdams reduce the risk of flooding and soil erosion, preserving the integrity of adjacent structures and ecosystems đď¸đ§
đ Reusable and modular cofferdams offer increased sustainability and cost-effectiveness, reducing the environmental impact and waste generated from single-use materials đąâťď¸
đ Cofferdams facilitate underwater inspections, repairs, and maintenance of existing infrastructure, ensuring the safety and longevity of vital water-based structures đđ
Cofferdams play an indispensable role in constructing and maintaining structures in wet environments. By embracing their potential and utilizing innovative techniques, we can overcome complex challenges while ensuring safety and sustainability.