Class 2 Kochi Questions ⚓️
Відкрити в Telegram
2 098
Підписники
+124 години
+47 днів
+3430 днів
Архів дописів
07-09-2026 Internal: Ubaid Sir External: Tommy Paul sir
Bulk carrier Ship,MC-c and ME-C engine
Functions of MC-c engine camshaft
Reversing of MC-C engine
Improved high lift safety valve diagram
Swirl and Squish
Factors we have consider for firing order of 2 S marine diesel engine
ME-C interlocks Internal: No question
07-09-2026
Function 3
Tommy paul & Ubaid
List and explain all Survey conducted by classification society.
Special areas for NOx
Marpol annex 6 latest ammendments
Hypermist regulation and testing procedure
Markings or poster on liferaft
Internal: Asked me which question i have not answered. "3. Marpol annex 6 latest ammendments"
Asked me to answer the same.
--> Hypermist nozzle distribution criteria
--> Cii complete and some cross questions.
🙂COC.🙂
07/09/2026
Function 4b&6
Ext Tommy paul sir
Int Ubaid sir
ME-C interlock
Static dynamic load in crankshaft
Improved high lift safety valve diagram
Swirl and squash 4s engine
Boiler survey interval
Mcc exhaust overhauling and checks
Accumulation pressure test
Turbocharger surging
Mcc engine chain broken corrective action
External:Tomypaul sit
Internal:Ubaid sir
1.Anex1 special area and outside special area discharge criteria
2.cargo hold fire fighting system
3.life raft service interval, who will do.
4.life raft solas regulations
5.Shell expansion plan
6.widas requirements explain
Internal:hypermist nozzle distribution criteria
Result:Coc🥰
Thanks to issac sir, friends who posted questions and who help to me to clear the doubts...
07.09.2026 Function 4b Tommy paul Ubaid sir Attempt 2
Attempts, Exam status , Ship type
Swell and shrinkage
Cascade control
Pressure jet burner, is swirl plate rotating?
Scrubber system in your last ship what type.
Fitted bolts, where? he needs to hear taper (1:100)
Cylinder laquering ,how to remove.
top bracing, why, types?
Hydraulic top bracing, working , checks
Ae mist box fuming, reasons
Internal:
Conditions monitoring types, where it is carried out.
Where in me shafting ( I said tcm, and crank shaft deflection)
Result : COC
Thanks to everyone who posted the questions, and a huge thank you to those who replied and explained how each question needs to be answered.
Special thanks to AKG for his quick reference notes. Thanks to Jibin james, Naresh Vp, Emmanuel cherian, Siji and sharon notes fn5, Nixon antony and Ajithkumar notes fn3.
Ext :Tommy paul
Int:UBAID
1.purging and Gas freeing.
2.Tankscope and explosimeter . working
3.Life boat solas regulations
4.IG alarms and venting system
5.CO2 regulations.Maintenance.why 20 sec .master valve use.
Internal
Hypermist regulations .(chapter 2.2 regulations 10 para 5.6.3)
What is PFOS (perfluro Octane sulfonic acid)and solas latest amendments.
Fn 3
Ext Tommy paul
Intl ubaid
Fixed co2 gas system regulations
Type A type B ships
Davit l/b safeties
Chapter 12 solas
Marpol ammendmnts
Intl
Bulk carries 2026 ammendmnts
Digitil inlcnmter
07.09.26
External: Tommy Paul Internal: Ubaid Function 6
Bottom end bearing overhaul
Boiler hydrostatic pr test
Piston overhaul
Piston ring checks
Running in procedure after piston renewal
07.09.2026
surendranath
srivatsava
Fun 4b.
MEC manuovuering
tacho system
ME interlocks
PID
ogee ring
gusset stey
cascade control
steering gear safematic criteria
cranckcase door regulation
liner wear
Fun 6.
exhaust valve OH
thrust bearing clearance and procedure
tail shaft alignment
MAN engine fuel pump timing
crosshead bearing OH
2/E dry dock under water checks
07/09/2026
Function 4b&6
Ext; Surendranath
Int; Srivastava
Attempt
Company Name
Engine?
Rt Flex manoeuvring
What to do if fcm 20 of one unit fail
Interlock in Main engine
PID controller
Cascade control
Construction of vane type steering gear and cross
Emergency steering of vane type steering gear
Full bore safety valve construction
Angle encorder and how is it connected to crankshaft
Key less propeller removal and fitting
Different methods Tailshaft alignment and explain any one
Cross head bearing inspection with piston in place
Fire in scavenge space and in dead slow your action
After burning reasons
Conversion of ME engine to Methanol fueled engine
Sulzer fuel pump timing check
Surrendranatha
Fun 5
Avr types
Carbon pile avr circuit explanation
Deck crane brake slippage electrical reasons
Squirrel cage vs silp ring adv & disadv
How esb and msb connection established
Fun 6
Crosshead overhauling procedure
Sulzer fuel pump timings adjustment
Crankpin bearing inspection procedure
Thrust bearing clearance procedure
Scavenge fire in malaka
04.09.2026
Tommy paul
Ubaid
Fn 3
1.Cargo hold fire detection system.
( 2 sets of extraction unit at monkey Island and each having 2 fans , one unit standby)
2.Inclining exp requirement.
3.Life raft regulations.
4.Life raft service interval and maintenance.
(Raft 1 year by approved service agency and HRU 2 year replacement )
5.Annex 6 ammendments.
( Want to hear about BDN -FP declaration form supplier)
6.Foam nozzle
7.Solas 12 chapter and widas regulation in detail.
(Expecting alarm criteria and overriding for cargohold alarm )
8.Fire action aux engine.
9.How to achieve annex 5 requirements in ship.
(Segregation of garbage different class,discharge criteria for garbage and cargo residues , GRB part 1 and 2 , which is the special are and special area requirement )
10.MOB marker regulations.
Internal
1.For rescuing a person fell overboard how many people will go in a rescue boat.
( Answered 5 person, not accepted,I think he is checking the way of thinking and answering)
Fn - 4b and 6
Surendranath and sentil
4b
ME manoeuvring
One CCU failure - action
What Qudrature sensor sense
ME C interlocks
Cascade control - JCW
Ogee ring
Gusset stay
Axial damper
Creep
6
X head bearing removal
Radial piston pump o/H
Fuel injection timing
Chain tightening
Keyless propeller removal
Sulzer thrust bearing clearance
Fn 5
External Tommy Paul sir
Internal Ubaid sir
Attempt 2
Earth neutral sytem , insulated neutral system , explaij about fault also , HV system he want to hear NER for earthing.
Static avr draw and explain , voltage dip avr how to correct.
Reverse power trip testing.
Transformer types.
Few question
Attempt 2
4b
Tommy Paul
Ubaid
Cat fines effect on engine, how reduce the cat fines
Mc mcc difference
Caustic embrittlement, how to reduce
Load act on engine, static load, and dynamic load, how reduce the impact of it.
Location of detuner on engine
Chain inspection
Some more ...
Internal
How the class will give Condition of class on auxiliary engine?
(Remaining auxiliary engine should have sufficient capacity and good working condition to meet the maximum load required on any condition)
04.09.26 External: UR Internal : Tomy Paul Function : 5
1.mcb &mccb difference
single phase induction starting
explain split phase and capacitor starter
single phasing and methods to find out 5.insulated earth explain how to understand things on msb
Internal Seebeck effect PTC & NTC Where in E/R
04-09-2026 Surrendranath sir Sentil sir Fun3
Solas chapter 12 and its contents Structural requirements of bulk carrier Ism preparation, documents submit by 2e MLC titles and detail under conditions of employment Inclining experiment , purpose, procedure , how to find GM and KG Co2 2 yearly, 5 yearly and 10 yearly maintenance.Func 5
Advantage and disadvantages of HV IEC Squirrel Cage induction motor construction. Msb and Esb tie breaker arrangement Undervoltage tripInternal Alternator construction Types of power sources available onboard Why two independent 24vdc sources .
04.09.2026 External:tommy paul sir Internal: ubaid sir
FSS OBJECTIVE
COW REGULATION
EMCY FIRE PUMP REGULATION
ANNEX 1 discharge criteria
type A and type B ship
External: senthil Internal : Surendranath Attempt: 3 Function : 4b
Attempt, written status and type of engine
ME-C manoeuvering, how many sensors in angle encoder, function of quadrature sensor, ccu failure what happen and action
Boiler turndown ratio
Types of liner corrosion and explain hot and cold corrosion, liner max wear limit (Not accepting 1% of total dia)
Safematic steering gear, sequence of alarm and actions for hydraulic leak, as per regulations which all tanker should have sing failure criteria and what is GRT of those vessels
Draw card and show early injection and what happens
02 Sep 2026
Fun 3
Attempt 2
Ext- Tommy Paul
Int- Senthil
Type of ship - Bulk carrier
1.Damage stability of ship.
2.Gz curve, angle of vanishing stability.
3.Fire detection and fire fighting inside cargo hold.
(Accepted Sample extraction and smoke detection system with fixed CO2 system).
Asked me where is extraction fan is fitted, i told in bridge, but not accepted.
4.Latest Solas amendments. I told few.(Asked me any new regulations regarding ER crane- said I don't know)
5.Latest Marpol annex 6 amendments.
6.Gravity davit safeties. Told about dead man and centrifugal brakes, heaving up limit switch, harbor pin, safety pin, Tricing pendant, bowsing tackle.
Internal- Reason for recent bulk carrier accident in Indian coast.
(Due to iron ore cargo shift as it's moisture content was high. And capsized)
Result COC.
