rams•prjk // updates
Open in Telegram
782
Subscribers
No data24 hours
-47 days
+230 days
Posts Archive
#EvolutionX #ROM #Unofficial #Peridot #U
Evolution X 9.6 - UNOFFICIAL | Android 14
Updated: 16/11/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fixed Potrait MiuiCamera (broken if you use r/w)
• Added HTSR (re-enable after screen off)
• Enable smart pixel by default
• Improve padding status bar
• Rework refresh rate menu
• Update blobs to V816.0.9.0.UNPMIXM
• Use HintManager for HWUI
Notes:
• Gapps mini builds
• November, 2024 Security patch
• Sign builds, Integrity pass by default
• Use EvoX recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
Repost from OrionOS-Update
Hello everyone,
OrionOS source will be WIP for updating November Security Patch, stay tune for developer..and always turn on notification in this channel to get the latest news/update about OrionOS.
Regards,
OrionOS Team
Repost from Afterlife Project
+1
Introduce Afterlife Qs Style IOs ,
Stay Tune for 7.3 Codename "Honest".
😎
Repost from 𝗠𝗘𝗢𝗪 𝗗𝗨𝗠𝗣
## 🚨 SCAM ALERT! 🚨 Fake Play Integrity Fixes That Can Brick Your Phone!Hey everyone, pay attention! Play integrity issues are common these days, but the solutions are usually easy. Unfortunately, some people are exploiting this with fake "fixes" that actually contain dangerous code designed to ruin your phone!
This is what happened to me:Last night, a user with the ID 7402776516 messaged me about a "PIF fork module" that supposedly fixes play integrity issues. I was tired and didn't think twice, so I agreed to use it later.
(See Screenshot 1: The message I received.)When I looked at the module's code this morning, I was horrified! It contained malicious code that could completely destroy my phone.
(See Screenshot 2: The dangerous code.)Thankfully, I recognized the danger and didn't proceed. But many people wouldn't be so lucky.
Here's what you need to know: • Never download modules from unknown sources or shady websites. • Only trust official release channels or reputable developers. • Be wary of unsolicited messages about "play integrity fixes," especially those from unfamiliar users. • If you're unsure about anything, ask a tech-savvy friend for help. Remember: Your phone is valuable. Don't let anyone trick you into ruining it! ✓ Reading this telegraph might help someoneStay safe and share this information with your friends to help stop these scams! ~ Regards // Mona
#AfterlifeOS #ROM #Official #Peridot #U
AfterlifeOS 7.2 Polite - OFFICIAL | Android 14
Released: 25/10/2024
▪️Download
▪️Installation
▪️Support
▪️Changelog
▪️Screenshots
Notes:
• Gapps build
• October, 2024 Security patch
• Use Afterlife recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @Afterlife_update
Join @AfterLifeOS
#PixelStar #HotFix #Official #peridot #U
PixelStar Uday v3.4 - OFFICIAL | Android 14
Updated: 25/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshot
Changelog:
• Fixed sensor not working
• Some small changes
Notes:
• October 2024, security patch
• Use PixelStar recovery
• Clean flash recommended
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to All tester
By @ramshell688
Follow @Project_PixelStar
Join @PixelStarChannel
#PixelStar #ROM #Official #peridot #U
PixelStar Uday v3.4 - OFFICIAL | Android 14
Updated: 24/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshot
Changelog:
• Initial Official release
• Added Dolby Atmos
• Added MiuiCamera
• Added XiaomiParts
• Switch to EROFS
• Update blobs to V816.0.8.0.UNPMIXM
• Source.
Notes:
• October 2024, security patch
• Use PixelStar recovery
• Clean flash mandatory
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to All tester
By @ramshell688
Follow @Project_PixelStar
Join @PixelStarChannel
#YAAP #ROM #Unofficial #Peridot #V
YAAP HOMEMADE - UNOFFICIAL | Android 15
Updated: 17/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fixed MiuCamera lags
• Adjust Auto Brightness
• Update blobs to V816.0.8.0.UNPMIXM
Notes:
• Gapps build
• October, 2024 Security patch
• Use YAAP recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• @ramaadni for banner
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
#HalcyonProject #ROM #Official #Beta #Peridot #V
Halcyon Viola Beta - OFFICIAL | Android 15
Released: 17/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Initial Official release
• Added Dolby Atmos
• Added MiuiCamera
• Added XiaomiParts
• Update blobs to V816.0.8.0.UNPMIXM
Notes:
• Gapps builds
• September, 2024 Security patch
• Sign builds, Integrity pass by default
• Use Halcyon recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @hlcynprjct
Join @hlcynprjctchat
#EvolutionX #ROM #Unofficial #Peridot #U
Evolution X 9.5 - UNOFFICIAL | Android 14
Updated: 12/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fixed MiuiCamera lags
• Switch to Pico Gapps
• Some small changes.
Notes:
• October, 2024 Security patch
• Use EvoX recovery for sideload
• If you need c2s work install Velvet manually
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
#OrionOS #ROM #Official #Peridot #U
OrionOS Andromeda - OFFICIAL | Android 14
Updated: 09/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fixed Fingerprint on AOD
• Fixed MiuiCamera lags
• Switch to stock vibratorfeature
• Switch to Xiaomi health-ext hal aidl
• Build USB hal aidl from source
Notes:
• Gapps builds
• September, 2024 Security patch
• Use OrionOS recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
#YAAP #ROM #HOTFIX #Unofficial #Peridot #V
YAAP HOMEMADE - UNOFFICIAL | Android 15
Updated: 04/10/2024
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fix GMS not working properly
• Added BCR v1.71
• Added MiuiCamera
• If you found a bugs send in support group
Notes:
• Gapps build
• September, 2024 Security patch
• Use YAAP recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• @ramaadni for banner
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
#YAAP #ROM #Unofficial #Peridot #V
YAAP HOMEMADE - UNOFFICIAL | Android 15
Released: 03/10/2024
▪️Download
▪️Installation
▪️Support
▪️Changelog
▪️Screenshots
Notes:
• Gapps build
• September, 2024 Security patch
• Use Aosp recovery for sideload
• First boot take a longer time. Be patient
Credits:
• Adarsh Grewal and Raghav for their Work.
• @ramaadni for banner and help
• Thanks to all tester
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
