ICA refutes report that Woodlands Checkpoint power outage resulted in Causeway, JB congestion
In its account of what happened, ICA said a build-up of Singapore-bound traffic occurred amid planned electrical maintenance works, while two vehicle breakdowns on the Malaysian side of the Causeway subsequently contributed to traffic tailing back into Malaysia.
https://www.channelnewsasia.com/singapore/ica-nov-4-causeway-congestion-not-caused-woodlands-checkpoint-power-outage-6526606
05 Nov, 20:38
