en
Feedback
Mariners Library ⚓️

Mariners Library ⚓️

Open in Telegram

Channel search Bot: @mariners_library_search_bot (Beta version) "Knowledge sharing" Sharing marine files, e-books, exam resources & training materials. To help the library, you can support & donate to the following charity: www.childf.com

Show more
4 514
Subscribers
No data24 hours
+437 days
+9930 days
Posts Archive
Which cargo is suitable for COW? this relates to the conditions under which crude oil washing (COW) is not permitted or not s
Which cargo is suitable for COW? this relates to the conditions under which crude oil washing (COW) is not permitted or not suitable due to the nature of the cargo. According to MARPOL Annex I, Regulation 35, the Crude Oil Washing Manual (COW Manual), and industry practice (OCIMF/ICS guidelines), certain cargoes make a tank unsuitable for COW operations. Here’s a clear summary: ⚠️ Cargoes not suitable for crude oil washing Crude oil washing must not be carried out if the cargo has any of the following 1-characteristics: Waxy or high-pour-point crude oils If the crude tends to solidify or form wax deposits at normal tank temperatures, it may clog lines, pumps, or washing machines. Example: Iranian Heavy, Arabian Heavy, Venezuelan crude. 2- High sediment or water content If the crude carries large amounts of sediments, asphaltenes, or water, it increases the risk of nozzle blockage and contamination.

Useful book about the LPG mixing practices.

Safety and stability: Starting with butane keeps the initial tank pressure lower and easier to control. Loading propane first
Safety and stability: Starting with butane keeps the initial tank pressure lower and easier to control. Loading propane first could lead to overpressure and the need for venting (releasing excess vapor), which is unsafe and wasteful.

Which should be loaded first when making an LPG mix — butane or propane? ✅ Answer: When preparing an LPG mix (a mixture of pr
Which should be loaded first when making an LPG mix — butane or propane? ✅ Answer: When preparing an LPG mix (a mixture of propane and butane), butane should be loaded first, followed by propane. Technical reasons: Vapor pressure difference: Propane has a much higher vapor pressure than butane (around 8–10 bar at ambient temperature, compared to about 2 bar for butane). If propane is loaded first, the tank pressure will rise quickly, making it difficult or even impossible to inject butane later because there won’t be enough pressure difference to push it in. Better pressure and temperature control: Loading butane first (the heavier component with lower vapor pressure) establishes a base layer of liquid at a manageable pressure. When propane (lighter and higher vapor pressure) is added afterward, the total pressure increases gradually to the desired level without exceeding safety limits. Propane also dissolves well in butane, creating a more homogeneous mixture.

Ship Navigation - 2nd Edition - 2021 - Borje Wallin - DOKMAR Publication - Witherby - 14 Chapters - 404 Pages ISBN 9071500586 Price: £50.00 (just for information) Including following Chapters / Subjects: Chapter 1 Introduction Chapter 2 Nautical information and aids to navigation Chapter 3 Electronic charts Chapter 4 Navigational instruments Chapter 5 Navigation system Chapter 6 The course Chapter 7 Finding the position Chapter 8 Route planning Chapter 9 Route planning with electronic charts Chapter 10 Route executing and monitoring Chapter 11 Steering Chapter 12 Safer navigation Chapter 13 Tides Chapter 14 The sailings #WITHERBY #Witherby #DOKMAR #Navigation #Sailing #ENA #Chart #ECDIS #NavigationSystem #Course #Position #FindingPosition #Route #Planning #PassagePlanning #RoutePlanning #Monitoring #Steering #SafeNavigation #Tide

Ship Manoeuvring Principles - 2nd Edition - 2023 - Capt. Paul R. Williamson - Witherby - 12 Chapters - 197 Pages ISBN 978-1-914993-16-9 Price: £40.00 (Just for information) Including following Chapters/Subjects: 1: Overview of Propulsion, Steering and Bridge Systems 2: Basic Principles 3: External Forces 4: UKC, Squat and Interaction 5: Manoeuvring in Shallow Water 6: Manoeuvring in Narrow Channels 7: Manoeuvring in Heavy Weather 8: Tugs 9: Berthing Guidance 10: Anchoring 11: Towing 12: Pilotage #WITHERBY #Witherby #Manoeuvring #ShipManoeuvring #Steering #Navigation #Rudder #Propeller #SteeringGear #BowThruster #Pitch #PivotPoint #Turning #Wind #Current #ShallowWater #Channel #UKC #Squat #Interaction #Overtaking #Drag #BankEffect #HeavyWeather #Tugs #Pilotage #Berthing #Unberthing #Anchoring #OpenMoor #BalticMoor #MediterraneanMoor #Towing

Ship Knowledge, Ship Design, Construction and Operation - 11th Edition - 2024 - Klaas Van Dokkum - DOKMAR Publications - WITHERBY- 16 Chapters - 469 Pages ISBN 978-9071500640 Price: £60.00 (just for information) Including following Chapters/Subjects: 1. Shipwise 2. The Shape of a Ship 3. Types of Ship 4. The Building of a Ship 5. Forces on A Ship 6. Laws and Regulations 7. Structural Arrangement 8. Closing Appliances 9. Cargo Gear 10. Anchor and Mooring Gear 11. Engine Room 12. Propulsion and Steering Gear 13. Electrical Installations 14. Materials and Maintenance 15. Safety 16. Stability #WITHERBY #witherby #DOKMAR #Encyclopedia #ReferenceBook #TextBook #Design #Structure #Construction #ShipBuilding #CargoGear #ShipArrangement #Regulation #EngineRoom #AnchorGear #MooringGear #Propulsion #Steering #Safety #Stability

ISM Code, a Practical Guide to the Legal & Insurance Implications - 3rd Edition - 2015 - Dr. Phil Anderson - Lloyd's Practical Shipping Guides - Informa Law - 4 Chapters - 666 Pages ISBN 9781843118855 Price: €220.00 (just for information) Including following Chapters / Subjects: Chapter 1. Introduction and Underlying Principles Chapter 2. Key Players Chapter 3. Compliance Requirements and their Legal Implications Chapter 4. Conclusion #ISM #Informa #InformaLaw #Lloyds #SafetyManagement #Safety #SafetyPractice #SafetySyatem #SMS #RiskManagement #ManagementSystem #SafetyCulture #RO #IMO #ILO #PSC #DOC #SMC #MLC

IALA VHF Data Exchange System (VDES) Overview (G117) - Edition 3.0 - DEC 2022 - IALA - 6 Chapters - 57 Pages including following chapters/subjects: 1. INTRODUCTION 2. GENERAL DESCRIPTION 3. POTENTIAL USES OF VDES 4. DEFINITIONS 5. ABBREVIATIONS 6. REFERENCES #IALA #VDES #GMDSS #Communication #RadioCommunication #VHF #MASS #SAR #MEDEVAC #GNSS #IDPS #VTS #MDA

IALA Maritime Radio Communications Manual (MARCOM) - DEC 2024 - IALA - 6 Chapters - 27 Pages Including following chapters/Subjects: 1.1 IALA strategic Vision 2.1 General 7 3.1 Maritime Communication Requirements 3.2 General Overview of Existing Communication System Technologies 3.3 Future Development 3.4 Overview of the Current and Future Voice and Data Communication Technologies . 3.5 Future Vision: Automated Selection Process of Available Communication Technologies 3.6 Modernisation of GMDSS 4.1 Situation with Respect to Existing Spectrum Usage 4.2 Agenda Item for WRC-27 4.3 Preliminary Agenda Item for WRC-31 5 Summary 6 Glossary #IALA #Radio #RadioCommunication #WRC #MF #HF #DSC #VHF #DGNSS #UHF #SHF #LRIT #EGC #RACON #LORAN #GMDSS

IACS Confined Space Safe Practice - Recommendation No.72-Rev.4 - Jan 2025 - IACS - 2 Parts - 12 Chapters - 34 Pages Including following Parts/Chapters: PART ONE - Confined Space Practices 1 Definitions 2 General Hazards 3 Requirements 4 Confined Space Entry (CSE) PART TWO - Guidelines for Safe Entry of Confined Spaces 1 General 2 Confined Space Hazards 3 Testing 4 Ventilation 5 Isolation of space 6 General and physical hazards 7 Guidelines for use of personal gas detectors 8 Survey preparation ANNEX - Checklist for Entry into Confined Spaces #IACS #Safety #ConfinedSpace #EnclosedSpace #Chemist #MarineChemist #GasDetector #PermitToWork #PTW #Training #CSE #ConfinedSpaceEntry #Ventilation #Testing

Carefully to carry - 2nd Edition -Consolidated Edition 2023 - UK P&I - WITHERBY - 12 Parts - 55 Chapters - 622 Pages ISBN: 978-1-91499-312-1 Price: £95.00 (only for information) Including following chapters/subjects: PART 1 Grain PART 2 Ores and Minerals PART 3 Steel and Other Metals PART 4 Timber and Forestry Products PART 5 General Guidance PART 6 Bulk Cargoes – Liquid PART 7 The Carriage of Gas PART 8 Packaged Cargoes, Including Bags, Drums and Flexitanks PART 9 Refrigerated and Controlled Atmosphere Cargoes PART 10 General Container Operations Including Waste Shipments PART 11 Miscellaneous Cargoes PART 12 Cargo Planning and Securing (Including Hatch Covers) #WITHERBY #UKPandI #UKP&I #CargoWork #Stowage #Carriage #CargoPlan #Bulk #Grain #LPG #Tanker #Ores #Steel #Metal #Timber #GeneralCargo #RefrigeratedCargo #Container #HeavyLift #CargoPlanning #Securing #HatchCover #StowagePlan #CargoSurvey

In voyage charter parties, the treatment of time when the vessel finishes one parcel, unberths, and waits for the next parcel (at anchorage or elsewhere) depends strictly on the charter party wording and common practice: 1. General Rule on Laytime Laytime counts continuously once notice of readiness (NOR) is valid and laytime has commenced, unless interrupted by an express exception (e.g., weather, strikes, shifting not for charterers’ account, etc.). If the vessel is waiting solely because the second parcel is not ready (charterer’s fault/delay), then the waiting time is normally for the charterer’s account and counts as laytime (or demurrage, if exceeded). 2. Shifting Between Berth and Anchorage Many charter parties (e.g., GENCON, ASBATANKVOY) have a clause: “Time used in shifting from anchorage to berth or from berth to berth shall count as laytime unless shifting is due to owner’s purposes.” Therefore, the time spent unberthing and shifting to anchorage is usually included in laytime, unless specifically excluded (e.g., if shifting is ordered by port authorities for safety reasons unrelated to cargo). 3. Parcel Situation If charterers book multiple parcels under one voyage charter, the entire loading operation (first + second parcels) is normally treated as one continuous operation, and the ship must remain available until all parcels are completed. If the vessel has to vacate the berth to allow others while charterers are not ready, the waiting time generally counts against charterers. ✅ Conclusion: Yes, the total waiting time should be assumed as laytime (and if expired, as demurrage), because the delay arises from the charterers not having the second parcel ready. The unberthing and shifting to anchorage is not an exemption; it still counts as laytime (unless the charter party has a very specific clause excluding it).