Process Modeling Simulation & Control
Open in Telegram
3 104
Subscribers
No data24 hours
+147 days
+8230 days
Data loading in progress...
Similar Channels
Tags Cloud
No data
Any problems? Please refresh the page or contact our support manager.
Incoming and Outgoing Mentions
---
---
---
---
---
---
Attracting Subscribers
December '24
December '24
+176
in 1 channels
November '240
in 0 channels
Get PRO
October '24
+59
in 1 channels
Get PRO
September '24
+105
in 0 channels
Get PRO
August '24
+148
in 2 channels
Get PRO
July '24
+123
in 1 channels
Get PRO
June '24
+73
in 0 channels
Get PRO
May '24
+91
in 0 channels
Get PRO
April '24
+73
in 0 channels
Get PRO
March '24
+159
in 0 channels
Get PRO
February '24
+149
in 0 channels
Get PRO
January '24
+235
in 0 channels
Get PRO
December '23
+192
in 0 channels
Get PRO
November '23
+87
in 1 channels
Get PRO
October '23
+89
in 0 channels
Get PRO
September '23
+93
in 0 channels
Get PRO
August '23
+34
in 0 channels
Get PRO
July '23
+70
in 0 channels
Get PRO
June '23
+66
in 0 channels
Get PRO
May '23
+51
in 0 channels
Get PRO
April '23
+43
in 0 channels
Get PRO
March '23
+134
in 0 channels
Get PRO
February '23
+75
in 0 channels
Get PRO
January '23
+81
in 0 channels
Get PRO
December '22
+84
in 0 channels
Get PRO
November '22
+54
in 0 channels
Get PRO
October '22
+104
in 0 channels
Get PRO
September '22
+126
in 0 channels
Get PRO
August '22
+63
in 0 channels
Get PRO
July '22
+34
in 0 channels
Get PRO
June '22
+48
in 0 channels
Get PRO
May '22
+46
in 0 channels
Get PRO
April '22
+50
in 0 channels
Get PRO
March '22
+96
in 0 channels
Get PRO
February '22
+98
in 0 channels
Get PRO
January '22
+585
in 0 channels
| Date | Subscriber Growth | Mentions | Channels | |
| 21 December | 0 | |||
| 20 December | +3 | |||
| 19 December | +2 | |||
| 18 December | +4 | |||
| 17 December | 0 | |||
| 16 December | 0 | |||
| 15 December | 0 | |||
| 14 December | 0 | |||
| 13 December | 0 | |||
| 12 December | 0 | |||
| 11 December | +4 | |||
| 10 December | +3 |
Channel Posts
1- Aspen HYSYS Process Simulation Overview
2- Thermodynamic Model Selection
.
| 2 | Introduction to Process Modeling using Aspen HYSYS
Level: Introductory
Course Description:
1- Aspen HYSYS Process Simulation Overview
2- Thermodynamic Model Selection
3- Phase Separator (2 & 3)
4- Heat Transfer Equipment (Heater, Cooler, heat Exchanger)
5- Rotary (Pump, Compressor, Turbine)
6- Component Separation (Column)
7- Reactor
8- Manipulator (Adjust, Case Study, Spreadsheet)
. | 0 |
| 3 | #Aspen_HYSYS #Training_Course #Introductory_Level | 0 |
| 4 | Instrumentation and Control Systems Documentation
Frederick A. Meier, Clifford A. Meier
Second Edition
. | 0 |
| 5 | This book provides the reader with knowledge needed to understand and apply the symbols and documents used to define a modern industrial instrumentation and control system. The documents that describe modern industrial processes, like most technical work, assume some level of understanding on the readers part. The documents use a schematic, symbol-based language that may resemble Mayan hieroglyphics to those unfamiliar with the process nomenclature.
. | 0 |
| 6 | #Handbook #PFD #PID #ISA | 0 |
| 7 | C. Document Review and Approval Definitions
- Addendum:
is a written document attached or added to clarify, modify, or support the information in the original document or written contract document.
- Archive:
is a place in which a collection of historical records is preserved.
- Arrangement Drawing:
provides the physical relationship of significant items using appropriate projections or perspective views that is prepared to convey a general description of the configuration and location of significant items. The Arrangement Drawing includes information of the part list, fabrication and detail drawing, overall dimension, weight, lifting point, etc., for test, lift, transport, and install the equipment.
- As Built Drawing:
is a drawing which marked up in the field reflecting changes to the approved for construction (AFC) drawings during construction, pre-commissioning, and commissioning. The As Built Drawing includes all changes made in the specifications and working drawings and shows the exact dimensions, geometry, and location of all elements of the work completed under the contract. The As Built Drawing is for record and for the future turnaround works. (Refer to the Master Mark-up Drawing)
- Assembly Drawing:
defines the configuration and contents of the assembly that is used to represent items more than one component. The Assembly Drawing establishes an item identification for each assembly containing detailed requirements for all parts and sub-assemblies that makes the final product. The Assembly Drawing shows how the components fit together and orthogonal plans, sections and elevations, or three-dimensional views, containing overall dimensions, weight and mass, identification of all the components, quantities of material, supply details, list of reference drawings, and notes.
- Construction Document:
includes the project specifications and procedures, and drawings, etc., for the construction works and activities.
- Contract Document:
is the written documents that defines the basis of contract consisting of both parties' roles, responsibilities, and detailed description of the work or service such as drawings, specifications, procedures, any other conditions, as well as the commercial information including the prices agreement, payment conditions, etc. The Contract Document should include sufficient information to be able to complete the work or service.
. | 0 |
| 8 | - Document Revision Numbering System:
is an engineering and design document control system to ensure that the project members are informed any design changes and the latest information. The common revision system is using a numeric (1, 2, 3 …) and/or alphabetic sequence (A, B, C …). After the initial issue of a document and followed by changes or further design developments, all revisions will be assigned the next higher alphabetic or numeric character. (e.g., Issued for Internal Review: A1, A2 ...; Issued for Client Review: B1, B2 ...; Issued for FEED: 0A, 0B ...; Issued for Design and Construction: 01, 02 ...).
- Documentation:
is the document or pieces of paper containing official information used to define or describe an object, design, specification, instructions or procedure, etc., that gives as the information and record.
. | 0 |
| 9 | - Document Distribution Matrix:
is a systematic organized matrix for the document and drawings to be distributed to related persons or organizations for their information, review and approval, record, and use for further actions. The Document Distribution Matrix includes lists of key project positions or organizations on one side and types of documents on the other.
- Document Numbering System:
is a document management system that defines numerical sequences with varying combinations of project specific identification codes for correspondence with other documents, and requires logging, issuing, and tracking. The Document Numbering System must be developed early in the project.
- Document Review and Approval Category:
is defined by the importance of document and information that is for information, for review, for approval, and for record. There are: IFR (Issued for Review), IFA (Issued for Approval), IFD (Issued for Design), IFH (Issued for HAZOP for P&IDs), FCR (Issued for Client Review), FCA (Issued for Client Approval), AFD (Approved for Design), and IFC (Issued for Construction) or AFC (Approved for Construction) aligning with the work process completed.
- Approved for Constriction (AFC):
means that the document or drawing was reviewed and approved by authorities of internal and external organizations including the client representatives for the construction. A Construction team must use only an AFC marked or stamped drawings and documents for the construction works and activities.
- Approved for Design (AFD) means:
that the document and drawing was reviewed and approved by a dedicated and authorized person or organization for use, mainly further design development, and procurement.
- Issued for Approval (IFA):
means that the document or drawing is issued for client or delegated authorized person/ organization to review and approval to use of them for further developments or activities. (e.g., Project Critical Document including P&ID, Plot Plan, etc.)
- Issued for Construction (IFC):
means that the document or drawing which are categorized as the review, and Issued for Construction.
- Issued for Design (IFD):
means that the document or drawing is issued for further development of design or used for other disciplines' design.
- Issued for Information (IFI):
means that the document or drawing is issued for information only. (e.g., Progress Status Reports, Detailed Calculations, etc.)
- Issued for Review (IFR):
means that the document or drawing is Issued for internal or external Review (IFR) or Client Review (FCR). (e.g., Project non-critical Document, etc.)
- Issued for HAZOP (IFH):
means that drawings (P&IDs) and documents are issued for the HAZOP review.
- FCA: stands for Issued for Client Approval
- FCR: stands for Issued for Client Review
- Document Review and Approval Cycle:
is a period of time frame for the update and revise the document and drawing in accordance with the review results including a specified review meeting, and update and re-issue.
- Document Revision Control:
is a process of information sharing and communicating between a series of draft documents which leads to a final and to be used for further design development. The Document Revision Control is applied the unique identifier for every released document that is revised to identify the latest version of the document and differentiate between drafts or previously and final approved versions of the document, and to track changes by different users. (Refer to the Document Revision Numbering System)
. | 0 |
| 10 | B. Document Review and Approval Work Process
. | 0 |
| 11 | A. Definition
- Document:
is a piece of written, printed, or electronic matter information and used for an instruction, communication and record that identifies a document's purpose and determine an appropriate document type. A type of the project Documents are a plan, procedure, contract, specification, report, manual, calculation, drawing, diagram, list, and engineering document, etc., that is the standard document types presented information in standard formats.
- Drawing:
is the graphically illustrated engineering document or data sets that discloses directly or by reference the physical or functional requirements of an item. The Drawing explains and demonstrates the final shapes with dimensions created based on the project specifications and procedures, and used for design basis (flow diagrams, one-line diagrams, etc.), manufacture, fabrication, installation, and construction. Type of drawings are sketch, two-dimensional CAD, three-dimensional CAD and three-dimension model drawing. They are also used for quantities for bulk material and construction cost estimate work.
- Information:
is a fact of situation, person, event, work, or data developed on paper, electronic, audio, video by word, table, drawing, or document which knowledge and data can be signified understanding of real things or abstract concepts. Information is meaningful and valuable data that can affect the behavior, decision, or outcome, and lead to an increase in understanding and decrease in uncertainty.
- Review:
is
1) an activity to figure out how well the thing being done or the capable of achieving established objectives;
2) an activity of considering something again in order to make a suitable, adequate, effective, and efficient way of achieving established objectives.
- Approval:
is
1) an act of endorsing or adding positive authorization, acceptance or agreement, or official permission;
2) an agreement or consensus on an activity or output comparing with baselines or contractual requirements by an approver to proceed a next step of activity, or work defined in project plans and procedures.
- Document Review and Approval:
is a project design and engineering work process in the development of project deliverables. Following the initial document development and necessary internal check and review processes to ensure adequate quality, and then the document will be released for external review ultimately leading to its approval. A part of the internal checks includes proper documentation of required design and controlling steps, assurance of critical safety and alignment with operating requirements, project specifications whilst ensuring that contract, client and regulatory requirements are satisfied.
- Document Review and Approval Procedure:
is a quality management work process of the project document control and management. The Document Review and Approval Procedure defines the adequate review or approval of project documents including Document Distributions, Document Review and Approval Category, Cycle, etc., which is successfully completed documentation work processes before beginning of subsequent works.
. | 0 |
| 12 | Document Review and Approval
A. Definition
B. Document Review and Approval Work Process
C. Document Review and Approval Definitions
. | 0 |
| 13 | #Project_Management #DCC #General | 0 |
| 14 | Document Review and Approval
. | 0 |
| 15 | Engineering Critical Path
. | 0 |
| 16 | Overall Engineering Sequence
. | 0 |
| 17 | Process Engineer Skill
1- Engineering Calculations, Design & Simulation, Equipment Specifications.
2- Process General Philosophies & Drawings (PFD, UFD, P&ID, C&E Matrix).
3- Feasibility Study, Basic and Detail Engineering.
4- HAZOP, Process Safety & Area classification.
5- PSV sizing, Flare-Network Studies & Depressurizing calculations.
6- Heat Exchangers & Air Cooler Thermal Design.
7- Calculation & Design of Utility Systems (Steam, Instrument Air, Fuel Gas, etc.)
8- Hydraulic Calculation, Pipe & Pipeline (Pipe Network) Sizing.
9- Pump, Turbine & Compressor Calculation.
. | 0 |
| 18 | Oil & Gas Engineering Consultants Company
Process Department | 0 |
| 19 | Oil & Gas Engineering Consultants Company
Process Department
. | 0 |
| 20 | Estimation of Power Law Model Coefficients
. | 0 |
