π FlyLeaf BZA π
Open in Telegram
373
Subscribers
No data24 hours
No data7 days
No data30 days
Posts Archive
Fly Leaf No. 4 / 2024
Attention...... All Concerned β¦..
WORK SITE PROTECTION.
Fly Leaf No. 3 / 2024
Attention.... All Concerned...
SECURING OF VEHICLES / LOADS / TRAINS / LOCOMOTIVES.
Fly Leaf No. 2 / 2024
Attention.... All Concerned...
HOT AXLE, CAUSES AND PREVENTION.
Fly Leaf 1 - 2024
Attention... Engineering Officials ...
DEFECTS NOTICED IN DIFFERENT LOCATIONS OF POINTS & CROSSINGS WHICH
NEED RECTIFICATION.
Fly Leaf No. 12 / 2023
Attention.... All Concerned β¦
Sub : Train Operation during Foggy & inclement weather β Precautions.
FlyLeaf 11 - 2023
Attention...... All Concerned β¦..
WINTER PRECAUTONS TO PREVENT RAIL / WELD FAILURE β SAFETY OF TRACK.
FlyLeaf 10 - 2023
Attention...... All Concerned β¦..
JOINT PROCEDURE ORDER FOR LOADING, UNLOADING AND TRANSPORTATION OF
BALLAST DEPARTMENTAL MATERIAL TRAINS (DMTs).
FlyLeaf 09 - 2023
Attention...... All Concerned β¦..
IMPORTANT INSTRUCTIONS FOR OFFICERS / SENIOR SUPERVISORS IN ACCIDENTS.
FlyLeaf 08 - 2023
Attention...... All Concerned β¦..
JOINT PROCEDURAL ORDER FOR USE OF WALKIE β TALKIES FOR
COMMUNICATION BETWEEN SHUNTING STAFF AND LOCO PILOT / SHUNTER
DURING SHUNTING.
FlyLeaf 07 - 2023
Attention...... All Concerned β¦..
JOINT ENGINEERING AND SIGNAL PROCEDURE ORDER : 01/2023
Sub : Attendance of deficiencies observed during the Joint Inspection of
Points and Crossings
Fly Leaf No. 06 / 2023
Attention...... All Concerned β¦..
JOINT PROCEDURE ORDER FOR PREVENTING OPEN DOORS OF WAGONS
HITTING RAILWAY STRUCTURES.
JPO NO. 05/2023Fly Leaf No. 05 / 2023
Attention...... All Concerned β¦..
INSTRUCTIONS FOR DRIVERS TO MANAGE BRAKE SYSTEM OF LOCOMOTIVE /
TRAIN IN DIFFERENT SITUATIONS ENCOUNTERED DURING TRAIN OPERATION.
As per RDSO Lr. No. MC / LHB / Brake dated 08.08.2019.