en
Feedback
HVAC Engineering World

HVAC Engineering World

Open in Telegram

📈 Analytical overview of Telegram channel HVAC Engineering World

Channel HVAC Engineering World (@hvacengineeringworld) in the English language segment is an active participant. Currently, the community unites 15 948 subscribers, ranking 8 229 in the Technologies & Applications category and 26 903 in the India region.

📊 Audience metrics and dynamics

Since its creation on невідомо, the project has demonstrated rapid growth, gathering an audience of 15 948 subscribers.

According to the latest data from 21 June, 2026, the channel demonstrates stable activity. Although there has been a change in the number of participants by 29 over the last 30 days and by 2 over the last 24 hours, overall reach remains high.

  • Verification status: Not verified
  • Engagement rate (ER): The average audience engagement rate is 13.74%. Within the first 24 hours after publication, content typically collects 3.58% reactions from the total number of subscribers.
  • Post reach: On average, each post receives 2 191 views. Within the first day, a publication typically gains 571 views.
  • Reactions and interaction: The audience actively supports content: the average number of reactions per post is 0.
  • Thematic interests: Content is focused on key topics such as alignment, heat, pressure, refrigerant, expansion.

📝 Description and content policy

Channel description not provided.

Thanks to the high frequency of updates (latest data received on 22 June, 2026), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Technologies & Applications category.

15 948
Subscribers
+224 hours
+147 days
+2930 days
Attracting Subscribers
June '26
June '26
+64
in 0 channels
May '26
+153
in 0 channels
Get PRO
April '26
+132
in 0 channels
Get PRO
March '26
+96
in 0 channels
Get PRO
February '26
+186
in 0 channels
Get PRO
January '26
+209
in 0 channels
Get PRO
December '25
+143
in 0 channels
Get PRO
November '25
+150
in 0 channels
Get PRO
October '25
+256
in 0 channels
Get PRO
September '25
+305
in 0 channels
Get PRO
August '25
+459
in 0 channels
Get PRO
July '25
+1 130
in 0 channels
Get PRO
June '25
+189
in 0 channels
Get PRO
May '25
+379
in 0 channels
Get PRO
April '25
+1 487
in 4 channels
Get PRO
March '25
+215
in 2 channels
Get PRO
February '25
+183
in 1 channels
Get PRO
January '25
+338
in 0 channels
Get PRO
December '24
+318
in 4 channels
Get PRO
November '24
+327
in 0 channels
Get PRO
October '24
+376
in 4 channels
Get PRO
September '24
+379
in 1 channels
Get PRO
August '24
+328
in 5 channels
Get PRO
July '24
+662
in 1 channels
Get PRO
June '24
+615
in 4 channels
Get PRO
May '24
+506
in 4 channels
Get PRO
April '24
+437
in 4 channels
Get PRO
March '24
+478
in 5 channels
Get PRO
February '24
+552
in 4 channels
Get PRO
January '24
+358
in 4 channels
Get PRO
December '23
+272
in 4 channels
Get PRO
November '23
+110
in 0 channels
Get PRO
October '23
+138
in 1 channels
Get PRO
September '23
+188
in 0 channels
Get PRO
August '23
+405
in 0 channels
Get PRO
July '23
+321
in 0 channels
Get PRO
June '23
+393
in 0 channels
Get PRO
May '23
+519
in 0 channels
Get PRO
April '23
+318
in 0 channels
Get PRO
March '23
+291
in 0 channels
Get PRO
February '23
+436
in 0 channels
Get PRO
January '23
+479
in 0 channels
Get PRO
December '22
+384
in 0 channels
Get PRO
November '22
+202
in 0 channels
Get PRO
October '22
+224
in 0 channels
Get PRO
September '22
+281
in 0 channels
Get PRO
August '22
+214
in 0 channels
Get PRO
July '22
+128
in 0 channels
Get PRO
June '22
+58
in 0 channels
Get PRO
May '22
+242
in 0 channels
Get PRO
April '22
+1 404
in 0 channels
Date
Subscriber Growth
Mentions
Channels
21 June+2
20 June+5
19 June+8
18 June+1
17 June+1
16 June+8
15 June+2
14 June+2
13 June+5
12 June+6
11 June+5
10 June+1
09 June+8
08 June0
07 June0
06 June+2
05 June+1
04 June+5
03 June+1
02 June0
01 June+1
Channel Posts
nnouncement for New Plumbing Design Batch using NBCS 2026 `_SAN MEP Solutions_``` is excited to announce that we are going to
nnouncement for New Plumbing Design Batch using NBCS 2026 `_SAN MEP Solutions_``` is excited to announce that we are going to start *Plumbing Design Course* suitable for working professionals In this Course, We will be covering: 1. Water Supply Distribution System as per NBCS 2026 Code & IPC Codes 2. Water Drainage & Storm Drainage System NBCS 2026 & IPC Codes 3. Break Pressure Tank Requirement as per NBCS 2026 4. High Rise Building Schematic - NBCS 2026 and so on.... Course Starting from 22-06-2026 Timings from 09:00 PM IST Onwards DM for more details https://wa.me/qr/F5N37GMLWNSGM1

2
Announcement for New Plumbing Design Batch using NBCS 2026 *SAN MEP Solutions* is excited to announce that we are going to st
Announcement for New Plumbing Design Batch using NBCS 2026 *SAN MEP Solutions* is excited to announce that we are going to start *Plumbing Design Course* suitable for working professionals In this Course, We will be covering: 1. Water Supply Distribution System as per NBCS 2026 Code & IPC Codes 2. Water Drainage & Storm Drainage System NBCS 2026 & IPC Codes 3. Break Pressure Tank Requirement as per NBCS 2026 4. High Rise Building Schematic - NBCS 2026 and so on.... Course Starting from 22-06-2026 Timings from 09:00 PM IST Onwards DM for more details https://wa.me/qr/F5N37GMLWNSGM1
1 801
3
https://www.facebook.com/share/r/1BbFHrYzaM/
1 931
4
Weekend Data Center MEP Design Course for working professionals Recurring Every Sunday from 10:00 AM to 02:00 PM IST Starting
Weekend Data Center MEP Design Course for working professionals Recurring Every Sunday from 10:00 AM to 02:00 PM IST Starting from 7th June 2026 (5-6 Weeks) DM for more details *https://wa.me/message/4CIVNZX4CFFQJ1*
2 841
5
https://www.facebook.com/share/r/1No7LxRWDK/
3 628
6
https://www.facebook.com/share/r/1JJjMyH3NU/
3 997
7
50 MW Hyper Scale Data Center MEP Design Course is going to start as per TIA 942 Codes Requirement and NBCS 2026 Standards Th
50 MW Hyper Scale Data Center MEP Design Course is going to start as per TIA 942 Codes Requirement and NBCS 2026 Standards This Course will mainly cover: HVAC Design System Electrical Design System Pre Action / Fire Suppression System Telecom Design System - Primary and Secondary System *Timing - 10PM IST Onwards* *Starting from 15-05-2026* DM for more details https://wa.me/message/4CIVNZX4CFFQJ1
4 417
8
50 MW Hyper Scale Data Center MEP Design Course is going to start as per TIA 942 Codes Requirement and NBCS 2026 Standards Th
50 MW Hyper Scale Data Center MEP Design Course is going to start as per TIA 942 Codes Requirement and NBCS 2026 Standards This Course will mainly cover: HVAC Design System Electrical Design System Pre Action / Fire Suppression System Telecom Design System - Primary and Secondary System Timing - 10PM IST Onwards DM for more details https://wa.me/message/4CIVNZX4CFFQJ1
3 757
9
https://dai.ly/xa68okw
0
10
Thread Cutting in CNC Lathe Machine https://dai.ly/xa68k94
0
11
Compressors Chart
Compressors Chart
0
12
https://www.dailymotion.com/video/x8h5sbi
0
13
Master HVAC formulas in one glance 📊❄️🔥 From heat load to airflow and efficiency — these are the core calculations every HV
Master HVAC formulas in one glance 📊❄️🔥 From heat load to airflow and efficiency — these are the core calculations every HVAC technician and engineer should know. Save this post now and level up your practical knowledge! 💡 ✔️ Perfect for students & site engineers ✔️ Quick revision before work ✔️ Essential for interviews 👉 Small formulas, BIG impact in real projects! #HVAC #HVACBasics #HVACDesign #Engineering #MechanicalEngineering #BuildingServices #AirConditioning #HVACTechnician #Construction #SiteEngineering #MEP #HVACFormulas #LearnEngineering #TechnicalKnowledge #EngineeringLife
0
14
No text...
0
15
Must Share This Post - Top 20 HVAC Formulas Sheet #foryouシpage #HVACIndia #LearnHvac #HVACBasics #ductdesign #coolingsystem #airconditioningrepair #vrfsystem #airconditioner #aircompressor
0
16
#hvac #vrfsystem #airconditioner #SplitAC #foryouシpage
0
17
No text...
0
18
🔥 HVAC VACUUM PROCESS (BEFORE GAS CHARGING) 🔧 ✅ Connect Double Manifold Gauge Set 🔵 Low Side → Suction Line 🔴 High Side → Discharge Line 🟡 Center Hose → Vacuum Pump ⚡ Start Vacuum Pump ➡️ Open Both Valves (High + Low) 💨 Evacuate Air & Moisture ✔️ Remove Non-Condensable Gases ✔️ Prevent System Damage ⏱️ Run for 20–30 Minutes 📉 Achieve Deep Vacuum (-29 inHg or 500 Microns) 🛑 Close Valves & Stop Pump 🔍 Hold Vacuum (Leak Test) ❄️ System Ready for Refrigerant Charging! 💡 Pro Tip: Never skip vacuuming — Moisture = Compressor Failure ⚠️ #HVACTechnicalSupport #technicalpost #fridgeworking #LearnEngineering #coolingsystem #mechanicalengineering #HVACDesign #chillers #EngineeringKnowledge #VRF
0
19
No text...
0