English Class DCI2☺
Show more
157
Subscribers
No data24 hours
No data7 days
No data30 days
- Subscribers
- Post coverage
- ER - engagement ratio
Data loading in progress...
Subscriber growth rate
Data loading in progress...
,
Not using fall protection harness while working on top of cement unit at main deck Port Aft side. It has risk of persons falling 6 meters down with serious consequences.
,
New persons are briefed theoritically & practically regarding H2S hazards & how to don BA sets of different air capacities.
,
Observed damaged belts being used. It has risk of leg injury during repair jobs.
,
Load test A of cutting skips, to ensure no failure will occur during lifting jobs. Keeping personnel away & use of proper heavy weights.
English class on Whatsapp
گروه تمرین انگلیسی و گهگاهی هم مطالب فارسی مهم
ادمین: عماد جعفری پور، نویسنده (رامهرمز+ تهران)
تشریف بیارید واتساپ😄👇👇👇🌺❤️
https://chat.whatsapp.com/4mGUzBDKLd14cunWhBrpnw
،
.
Emad J
Yesterday 10 Aug 2019 at 4:30 PM, Nasr-6 Companyman Mr. Padeban requested us to quickly lower one lifeboat (without any preparation or delay) while he himself stays as witness to ensure our rig readiness. This job was done safely & quickly. Video is attached. Portside lifeboat was lowered top 1 meter above sea surface & then raised up. No person was staying inside lifeboat during lowering & raising job. I should thank BM Ehsan Chabok, Mech Keykhaei, Ch elec Sajadieh, RA Ali Safari.
Lifeboat lowering DCI2 10 Aug 2019 Nasr-6 Pfm.mp421.11 MB
.
Replacing fall wires of DCI2 lifeboats as per steps described in JSA.
Video 6, Passing new fall wires through sheaves. Good teamwork by Zabih Avin, Pouya Asarpoor, Ehsan Dehghan, ...
19.23 MB