366
Subscribers
No data24 hours
No data7 days
No data30 days
Data loading in progress...
Tags Cloud
No data
Any problems? Please refresh the page or contact our support manager.
Incoming and Outgoing Mentions
---
---
---
---
---
---
Attracting Subscribers
August '24
August '24
+5
in 0 channels
July '24
+35
in 0 channels
Get PRO
June '24
+8
in 0 channels
Get PRO
May '24
+25
in 0 channels
Get PRO
April '24
+31
in 0 channels
Get PRO
March '24
+40
in 0 channels
Get PRO
February '24
+212
in 0 channels
Get PRO
January '24
+110
in 0 channels
Get PRO
December '23
+129
in 1 channels
Get PRO
November '230
in 1 channels
Get PRO
October '23
+366
in 1 channels
| Date | Subscriber Growth | Mentions | Channels | |
| 06 August | 0 | |||
| 05 August | +3 | |||
| 04 August | +1 | |||
| 03 August | +1 | |||
| 02 August | 0 | |||
| 01 August | 0 |
Channel Posts
Routing Issue in Hong Kong
We are investigating this problem.
Keep posted at akari.fail
https://akari.fail/incidents/9qls42hvdt53
| 2 | 关于 SGBGP 产品的路由调整
SGBGP Lite:
+ CDN77 (AS60068)
SGBGP Standard:
+ GSL Networks (AS137409) | 541 |
| 3 | 鉴于最近 HE 骨干网的不稳定情况,我们对我们的网络策略做出以下调整
HK Standard/Lite - SG Lite 均可通过传输互访,端内 31.5 ms.
SG Lite 和香港部分 ISP 也可以通过传输互访.
HKBGP Lite 近期可能会出现国际方向间歇性丢包,系 HE 骨干网 问题造成,我们暂无解决方法,可以升级 HKBGP Standard/Pro 来提升体验。
以上的调整均为为了客户体验做出的临时性调整,我们保留回退操作的权利,Lite 系列路由不做保证。 | 545 |
| 4 | Routing Issue in Taipei
We are investigating this problem.
Keep posted at akari.fail
https://akari.fail/incidents/b7bt3pst4gw0 | 1 025 |
| 5 | Recent network changes
+ Google PNI 100G in HK
+ HK-SG IEPL
+ HK-TW IEPL
+ HK-JP IEPL (provisioning)
+ TW-JP IEPL (provisioning)
+ GSL Networks in HK/SG/JP (provisioning)
近期可能会有一系列新产品和促销活动,关注频道以获取最新更新。 | 654 |
| 6 | 香港 - 台北传输已经接通
目前 HK Standard - TW Lite 可通过传输互访,端内 18 ms.
新加坡 - 香港传输已经接通
目前 HK Standard - SG Lite 可通过传输互访,端内 31.5 ms. | 1 318 |
| 7 | [SOLVED] Connectivity Degradation in Hong Kong Region
Incident Report for Akari Networks
https://akari.fail/incidents/1lmdnm0lqjvh | 1 470 |
| 8 | [TPE1 & TPE2] Core Router Upgrade
Time: 2023.07.16 01:30 - 02:30 HKT.
We wish to inform our esteemed customers that we will be performing a scheduled maintenance in our TPE (Taipei) data center. This maintenance is scheduled to commence on July 16th at 01:30 and is expected to conclude by 02:30 UTC+8.
During this maintenance window, our engineering team will be replacing the core router with the Juniper MX204 series. This is part of our continuous efforts to provide you with the most reliable and secure network possible.
Please be aware that there might be intermittent network interruptions for a few minutes during this period. We kindly request your understanding as we carry out these necessary upgrades to serve you better.
Our team will make every effort to minimize any inconvenience and we appreciate your patience during this time. Please ensure you have made necessary arrangements to manage your traffic during this maintenance window.
If you have any questions or concerns, please feel free to reach out to our support team.
https://akari.fail/incidents/7mh71r41zm5k | 929 |
| 9 | The HKG8-HKG12 link now operates under 1+1 protection.
We are now also offering transmission leasing between these two data centers with 1+1 protection. For further details, please contact @alanyhq.
HKG8 : Itech Tower 2
HKG12 : Equinix HK2 | 824 |
| 10 | Maintenance is complete. We will continue to monitor link stability for 24 hours. | 664 |
| 11 | Rearranged on 2023.07.05 08:00 - 10:00 HKT. | 894 |
| 12 | Due to a Chinese holiday, the planned maintenance scheduled for June 20th from 9:00 AM to 12:00 PM will be postponed. A new date will be announced soon. | 782 |
| 13 | [HKG8 & HKG12] DWDM Maintenance
Time: 2023.07.05 08:00 - 10:00 HKT.
We have given thorough consideration to the impact of this maintenance, and we anticipate that there will be no noticeable effect on your business operations. However, we must note that despite all possible precautions, there is always a chance of issues arising during any maintenance work, which may result in temporary disconnections for some users.
During this maintenance, we will be transitioning from a single dark fiber to two non-overlapping dark fibers for backup redundancy. This upgrade is aimed at enhancing our service reliability and further improving the quality of our services.
After this maintenance, we expect to provide a total interconnect capacity of 400G within the two data centers, which includes 200G 1+1 backup. This will provide you with improved data transfer and access speeds.
Please note that this maintenance work might cause brief service interruptions, and we recommend that you prepare accordingly. If you encounter any issues during this period, our customer service team will be on standby to provide any assistance you may need.
We apologize for any inconvenience that this maintenance may cause, and we appreciate your understanding and support in this matter.
Thank you for your trust in our services, and we look forward to serving you better after the maintenance. | 1 132 |
| 14 | [TPE1 & TPE2] Urgent Network Maintenance Notice - Taiwan POP Router Restart
Time: 2023.06.09 14:25 HKT
We regret to inform you that our Taiwan Core Router needs to be urgently restarted due to the detection of a significant issue. This necessary step is vital for applying configurations that may resolve the detected problem.
The operation for this restart is scheduled to occur at 14:25 local time. As a result of this action, please anticipate potential network disruption which may result in an offline status for a few minutes.
We understand the inconvenience that this might cause and sincerely apologize for the short notice. The decision to restart is never made lightly, but it's crucial to maintain the highest possible level of service quality and reliability.
We greatly appreciate your understanding and patience during this maintenance window. Should you have any questions or concerns, please feel free to reach out to our customer service team who are ready to assist you. | 868 |
| 15 | [HKG8 & HKG12] Equinix Internet Exchange BGP Session Flap
Time: 2023.06.08 10:15 HKT
We have noticed that the BGP session between our network and the Route Server (RS) of the Equinix Internet Exchange is experiencing instability. We have confirmed that this issue is not due to link jitter and have reached out to Equinix for troubleshooting assistance.
Please be aware that there may be about 1 minute of network jitter around 10:15, which is caused by BGP reconvergence.
We sincerely apologize for any inconvenience this may cause. We understand that maintaining stable connectivity is critical, and we appreciate your patience and understanding while we diligently work on resolving this issue.
We want to assure you that we will continue to monitor this situation closely and will keep you updated on the progress of the resolution. Your satisfaction is our top priority, and we are committed to providing the best service possible. Thank you for your continued support. | 650 |
| 16 | [HKG8 & HKG12] HKIX Local Loop Maintenance
Time: 2023.05.29 19:00 HKT
We found that our local loop to HKIX unstable and up/down 4 times in the past 30 mins, we has shut down the port as made serious impact to our network.
We will arrange technician to on-site both end to health check tonight. to process bert test to trouble shot.
During this maintenance period, our HKIX Port will be interrupted, traffic passing through HKIX will be rerouted to our other upstreams. | 3 327 |
| 17 | 来自HE的回复:
We are currently tracking a BGP issue caused by a malformed update. This appears to be affecting Juniper routers. We are working on mitigating the issue.
我们目前暂时中断了与HE的BGP会话,目前 HKBGP Lite 路由可能会受到影响。 | 1 062 |
| 18 | [HKG8 & HKG12] 香港网络中断
时间: 2023.04.20 10:50 HKT - 10:58 HKT
本次故障的主要原因是上游BGP会话出现异常抖动,这导致核心路由器内存资源被大量占用,最终导致内存溢出。由于内存溢出,所有BGP会话被重置,进而影响了网络的稳定性和业务的正常进行。
我们计划增加一台核心路由,对关键业务进行多节点部署来提高容灾能力,请等待下一步的维护通知。 | 1 011 |
| 19 | [Offer] 台湾 Colo 促销活动
我们的新台湾数据中心位于台北宏鼎电讯大楼 (Chief HD Building Taipei)。您可以免费使用我们提供的跨数据中心传输接入 TWBGP Lite / Standard,同时支持客户自带 IP 地址,由我们代为宣告或者建立 BGP Session。
上架服务器免费,但后续运维服务将会产生费用。
此外,我们还可提供有偿 STUIX Port 服务,并协助您连接到位于 Chief LY 的其他客户机柜。
预计 5 月初交付,如需了解更多详情,请联系 @alanyhq。 | 1 000 |
