en
Feedback
ATS CLASSES

ATS CLASSES

Open in Telegram

This channel is create for RRB JE Mechanical and ALP/Tech .

Show more
2 771
Subscribers
No data24 hours
-57 days
-3930 days
Posts Archive
photo content

Q. Do you miss daily quiz ?
Anonymous voting

Q. Master production schedule gives inputs to
Anonymous voting

Q. The correct sequence of increasing production volume is
Anonymous voting

Q. Which class of inventory have highest annual value
Anonymous voting

Q. If the lead time is 10 days and daily consumption of a product is 50 unit then, find reorder level (ROL)
Anonymous voting

Q. If the ordering cost increases four times then effect on EOQ
Anonymous voting

Q. At BEP total profit is
Anonymous voting

Q. If the variable cost per in unit increases then what will be the effect on break even point
Anonymous voting

Q. Inputs of MRP
Anonymous voting

Q. Which of the following is referred to as MRP -II [RRB JE 2019]
Anonymous voting

Q. MRP-I refers to which of the following [RRB JE 2019]
Anonymous voting

Q. Which of the following is an output of Materials requirement planning [RRB JE 2019]
Anonymous voting

Edit, Sign and Share PDF files on the go. Download Acrobat Reader for mobile: https://adobeacrobat.app.link/Mhhs4GmNsxb

LEC -06 industrial mana.

Q. The demand rate for a item is 12000 units/year , the ordering cost is Rs 100 per order and the holding cost is Rs 0.8 per item per month. If no shortages are allowed and the replacement is instantaneous, then the no. of orders per year [RRB JE 2019]
Anonymous voting

Edit, Sign and Share PDF files on the go. Download Acrobat Reader for mobile: https://adobeacrobat.app.link/Mhhs4GmNsxb

Industrial Management lec-05