en
Feedback
ATS CLASSES

ATS CLASSES

Open in Telegram

This channel is create for RRB JE Mechanical and ALP/Tech .

Show more
2 771
Subscribers
No data24 hours
-57 days
-3930 days
Posts Archive
Q. Inventory control and quality control is involved in which of the following phases of production planning and control? [ RRB JE 2019 ]
Anonymous voting

Edit, Sign and Share PDF files on the go. Download Acrobat Reader for mobile: https://adobeacrobat.app.link/Mhhs4GmNsxb

Q. Which of the following is not involved in 5 M's in production or operations management? [RRB JE 2019]
Anonymous voting

Q. What do you think about FM questions practice video? Plz comment in YouTube video. shall I continue ?
Anonymous voting

Q.10 Which among the following technique use master schedule to manufacture the end product by preparing a detailed schedule of raw materials and components?
Anonymous voting

Q.9 The stresses developed on a perpendicular plane of a body due to external force is known as
Anonymous voting

Q.8 An approach in which minimum work is done to reduce or eliminate inventories rather than optimize it is known as
Anonymous voting

Q.7 Which among the following is NOT a metal forming process ?
Anonymous voting

Q.6 Pascal is the unit of
Anonymous voting

Q.5 Find the EOQ for the given data: Annual requirement of parts 800, inventory cost 10% of value/year, the setup cost is RS. 200 per setup and the cost per part Rs. 20.
Anonymous voting

Q.4 The factor safety defined as ratio of UTS to the working stress is applicable for which type of material
Anonymous voting

Q.3 A 30 cm dia pipe carries water under the head of 20 meter with velocity of 4 m/s . What is the flow rate in the pipe?
Anonymous voting

Q.2 The ratio of change in length of a specimen to that of the original length of the specimen under testing is known as
Anonymous voting

Q.1 The study of a body in motions due to external forces which cause the motion are considered is known as
Anonymous voting