Q. A steel with 0.8% carbon and 100% pearlite is called ? RRB JE 2019
2 771
Q.Which of the following is a slow rise of plastic deformation under the action of stresses? RRB JE 2019
2 771
If you still don't watch this video then for your benefit watch this for clear all concept of Industrial Management.
https://youtu.be/4cn0foOwBQ4
2 771
Q. For critical path slack and float of all critical activities will be zero
2 771
Q. The word slack is used in PERT analysis and FLOAT is used in CPM analysis
2 771
Q. In PERT analysis, the possible number of time estimates for activities linking up two events are
A)Four-time estimates
B)Two-time estimates C)Three-time estimates D)One-time estimate RRB JE 2019
2 771
Q. Negative slack occurs when
A)Events stick to their schedule
B)Dummy activities are large in number C)Activities lie in critical path D)There is deficiency of resources RRB JE 2019
2 771
Q. Which of the following statements is FALSE about CPM?
A)It is an activity oriented technique B)It is mainly used for construction programme C)It ignores chance element D)It is an event oriented technique RRB JE 2019
2 771
Q. Which of the following distribution represents the time estimates in PERT
[RRB JE 2019]
2 771
Q. The amount of time by which an activity can be delayed without affecting project completion time is
[RRB JE 2019]
2 771
Edit, Sign and Share PDF files on the go. Download Acrobat Reader for mobile: https://adobeacrobat.app.link/Mhhs4GmNsxb
2 771
PERT/CPM very important topic for RRB JE.
Two to three questions they asked in previous year from this topic.
Must watch this video
https://youtu.be/xQ7X3kMuyaY