en
Feedback
Engineering References

Engineering References

Open in Telegram

Engineering References

Show more
The country is not specifiedThe category is not specified

πŸ“ˆ Analytical overview of Telegram channel Engineering References

Channel Engineering References (@engineeringreferences) is an active participant. Currently, the community unites 10 426 subscribers, ranking in the Other category.

πŸ“Š Audience metrics and dynamics

Since its creation on Π½Π΅Π²Ρ–Π΄ΠΎΠΌΠΎ, the project has demonstrated rapid growth, gathering an audience of 10 426 subscribers.

According to the latest data from 02 December, 2024, the channel demonstrates stable activity. Although there has been a change in the number of participants by 13 over the last 30 days and by 3 over the last 24 hours, overall reach remains high.

  • Verification status: Not verified
  • Engagement rate (ER): The average audience engagement rate is 0%. Within the first 24 hours after publication, content typically collects N/A% reactions from the total number of subscribers.
  • Post reach: On average, each post receives 0 views. Within the first day, a publication typically gains 0 views.
  • Reactions and interaction: The audience actively supports content: the average number of reactions per post is 0.

πŸ“ Description and content policy

The author describes the resource as a platform for expressing subjective opinions:
β€œEngineering References”

Thanks to the high frequency of updates (latest data received on 03 December, 2024), the channel maintains relevance and a high level of publication reach. Analytics show that the audience actively interacts with content, making it an important point of influence in the Other category.

10 426
Subscribers
+324 hours
+57 days
+1330 days
Posts Archive
NORSOK_D_DP_001_1st_1994_Design.pdf1.20 KB

NORSOK_D_CR_003_1st_1995_Common.pdf0.19 KB

NORSOK_D_010_3rd_2004_Well_integrity.pdf3.02 MB

NORSOK-D-010 2nd 1998 Drilling & well operations.pdf1.77 KB

NORSOK-D-010 1st 1997 Drilling & well operations.pdf2.27 KB

NORSOK-D-007 2nd 2013 Well testing system.pdf2.47 KB

NORSOK-D-002 2nd 2013 Well intervention equipment.pdf2.76 KB

NORSOK_D_002_1st_2000_System_Requirements.pdf4.87 KB

NORSOK-D-001 3rd 2012 Drilling facilities.pdf1.80 MB

NORSOK-D-001 2nd 1998 Drilling facilities.pdf1.98 KB

NORSOK_E_CR_002_1st_1996_Common.pdf3.78 KB

NORSOK_E_CR_001_2nd_1996_Common.pdf1.75 KB

NORSOK_E_CR_001_1st_1994_Common.pdf1.70 KB

NORSOK-E-002 3rd 2001 Adjustable speed AC motor drives.pdf1.72 KB

NORSOK-E-002 2nd 1997 Adjustable speed AC motor drives.pdf1.28 KB

NORSOK-E-001 5th 2007 Electrical systems.pdf5.82 MB

NORSOK-E-001 4th 2001 Electrical systems.pdf5.43 KB

NORSOK-E-001 3rd 1997 Electrical systems.pdf1.58 KB

NORSOK_G_CR_001_1st_1996_Common.pdf3.92 KB

NORSOK_G_001_CR_1st_1996_Common.pdf1.89 KB