TAF ENGINEERING SERVICES - CIVIL ENGINEERING ๐ทโโ๐ท๐ฅ
1) TNPSC/MAWS - AE,JDO, SURVEYOR, DRAUGHTSMAN 2) SSC JE, RRB JE 3) TRB (For Both Technical And General studies)
ุฅุธูุงุฑ ุงูู ุฒูุฏ๐ ูุธุฑุฉ ุชุญููููุฉ ุนูู ููุงุฉ ุชูููุฌุฑุงู TAF ENGINEERING SERVICES - CIVIL ENGINEERING ๐ทโโ๐ท๐ฅ
ุชูุนุฏ ููุงุฉ TAF ENGINEERING SERVICES - CIVIL ENGINEERING ๐ทโโ๐ท๐ฅ (@tafengineering2023) ูู ุงููุทุงุน ุงููุบูู ุงูุฅููููุฒูุฉ ูุงุนุจุงู ูุดุทุงู. ูุถู ุงูู ุฌุชู ุน ุญุงููุงู 11 233 ู ุดุชุฑูุงูุ ู ุญุชูุงู ุงูู ุฑุชุจุฉ 17 963 ูู ูุฆุฉ ุงูุชุนููู ูุงูู ุฑุชุจุฉ 37 437 ูู ู ูุทูุฉ ุงูููุฏ.
๐ ู ุคุดุฑุงุช ุงูุฌู ููุฑ ูุงูุญุฑุงู
ู ูุฐ ุชุฃุณูุณู ูู ะฝะตะฒัะดะพะผะพุ ุญูู ุงูู ุดุฑูุน ูู ูุงู ุณุฑูุนุงู ูุฌู ุน 11 233 ู ุดุชุฑูุงู.
ุจุญุณุจ ุขุฎุฑ ุงูุจูุงูุงุช ุจุชุงุฑูุฎ 10 ููููู, 2026ุ ุชุญุงูุธ ุงูููุงุฉ ุนูู ูุดุงุท ู ุณุชูุฑ. ุฎูุงู ุขุฎุฑ 30 ููู ุงู ุชุบููุฑ ุนุฏุฏ ุงูุฃุนุถุงุก ุจู ูุฏุงุฑ 109ุ ููู ุขุฎุฑ 24 ุณุงุนุฉ ุจู ูุฏุงุฑ -2ุ ู ุน ุจูุงุก ุงููุตูู ุงูุนุงู ู ุฑุชูุนุงู.
- ุญุงูุฉ ุงูุชุญูู: ุบูุฑ ู ูุซููุฉ
- ู ุนุฏู ุงูุชูุงุนู (ER): ูุจูุบ ู ุชูุณุท ุชูุงุนู ุงูุฌู ููุฑ 8.16โ%. ูุฎูุงู ุฃูู 24 ุณุงุนุฉ ู ู ุงููุดุฑ ูุญุตุฏ ุงูู ุญุชูู ุนุงุฏุฉู 5.15โ% ู ู ุฑุฏูุฏ ุงููุนู ูุณุจุฉู ุฅูู ุฅุฌู ุงูู ุงูู ุดุชุฑููู.
- ูุตูู ุงูู ูุดูุฑุงุช: ูุญุตู ูู ู ูุดูุฑ ุนูู ู ุชูุณุท 916 ู ุดุงูุฏุฉ. ูุฎูุงู ุงูููู ุงูุฃูู ูุฌู ุน ุนุงุฏุฉู 578 ู ุดุงูุฏุฉ.
- ุงูุชูุงุนูุงุช ูุงูุงุณุชุฌุงุจุฉ: ูุชูุงุนู ุงูุฌู ููุฑ ุจุงูุชุธุงู ุ ู ุชูุณุท ุงูุชูุงุนูุงุช ููู ู ูุดูุฑ ูุจูุบ 1.
- ุงูุงูุชู ุงู ุงุช ุงูู ูุถูุนูุฉ: ูุฑูุฒ ุงูู ุญุชูู ุนูู ู ูุงุถูุน ุฑุฆูุณูุฉ ู ุซู taf, jdo, tnpsc, engineering, admission.
๐ ุงููุตู ูุณูุงุณุฉ ุงูู ุญุชูู
ูุตู ุงูู
ุคูู ุงูููุงุฉ ุจุฃููุง ู
ุณุงุญุฉ ููุชุนุจูุฑ ุนู ุงูุขุฑุงุก ุงูุฐุงุชูุฉ:
โ1) TNPSC/MAWS - AE,JDO, SURVEYOR, DRAUGHTSMAN
2) SSC JE, RRB JE
3) TRB
(For Both Technical And General studies)โ
ุจูุถู ูุชูุฑุฉ ุงูุชุญุฏูุซ ุงูู ุฑุชูุนุฉ (ุฃุญุฏุซ ุงูุจูุงูุงุช ุจุชุงุฑูุฎ 11 ููููู, 2026) ุชุญุงูุธ ุงูููุงุฉ ุนูู ุญุฏุงุซุชูุง ูู ุณุชูู ูุตูู ู ุฑุชูุน. ูุชูุธูุฑ ุงูุชุญูููุงุช ุชูุงุนูุงู ูุดุทุงู ู ู ุงูุฌู ููุฑุ ู ุง ูุฌุนููุง ููุทุฉ ุชุฃุซูุฑ ู ูู ุฉ ุถู ู ูุฆุฉ ุงูุชุนููู .
ุฌุงุฑู ุชุญู ูู ุงูุจูุงูุงุช...
| ุงูุชุงุฑูุฎ | ูู
ู ุงูู
ุดุชุฑููู | ุงูุฅุดุงุฑุงุช | ุงููููุงุช | |
| 11 ููููู | +1 | |||
| 10 ููููู | 0 | |||
| 09 ููููู | +5 | |||
| 08 ููููู | +7 | |||
| 07 ููููู | +7 | |||
| 06 ููููู | +7 | |||
| 05 ููููู | +9 | |||
| 04 ููููู | +5 | |||
| 03 ููููู | +4 | |||
| 02 ููููู | +12 | |||
| 01 ููููู | +4 |
| 2 | TAF ENGINEERING SERVICES
TNPSC JDO NEW BATCH (ONLINE CRASH COURSE)
FOR CIVIL DEPARTMENT
BATCH NAME= REDFORT 2.0 BATCH
DURATION = Upto September MONTH
COURSES = TNPSC JDO (TECHNICAL - CIVIL AND GS)
LANGUAGE = TECHNICAL CIVIL (SEPARATE - ENGLISH & TAMIL MEDIUM), GS (BILINGUAL)
Special Event:
1) WELL PLANNED TEST SERIES WITH EXPLANATION
2) INDIVIDUAL MENTORSHIP AND DOUBT CLARIFICATIONS
Around 500+ Engineers๐ทโโ๏ธ๐ทโโ๏ธ got placed in AE/JDO/SURVEYOR AND DRAUGHTSMAN LAST 3 YEARS ๐ฅ
Course Details video Link ๐
https://youtu.be/hdnwZXDwDVU?si=pq8YaqqbGphbBObd
Batch Schedule Pdf ๐:
https://drive.google.com/file/d/1IJcF7PWLICh4YQqMH-pr0ozjyfW70aNN/view
TAF AE STUDENT ACHIEVERS SPEECH๐:
https://youtube.com/shorts/l66t8WU3dy0?si=cZZRt6KUxofS89p_
ADMISSION IS GOING ON
9500259300, 7695856500, 9342326500๐๐ | 196 |
| 3 | TAF ENGINEERING SERVICES - CIVIL
DAY 11- 1 MINUTES 1MARK๐ท๐ทโโ๐ | 538 |
| 4 | 35.The operation of converting limestone into
quicklime by heating it to temperatures upto
900๏ฏC and releasing carbon dioxide is known as : | 471 |
| 5 | 34.For the construction of structures under water,
the lime used is | 425 |
| 6 | The minimum cement content for a sever exposure and corresponding minimum grade of concrete (PCC ) as per IS456:2000 | 427 |
| 7 | In which stage of engineering survey alignment of different proposal are compared and finalize as the best alignment | 415 |
| 8 | According to the IRC : 73 guidelines, extra widening of curves is not required on single lane carriageways if the radius of the curve is longer than | 369 |
| 9 | In designing of valley curve which of the following criteria of measurement needs to be followed | 359 |
| 10 | 20. Gabions are used for : | 286 |
| 11 | 19. If D is the depth of scour below original bed, then the width of launching apron is generally taken as | 343 |
| 12 | 18. A groyne with a curved head is known as | 344 |
| 13 | Dimension analysis of weight flow rate is | 279 |
| 14 | Water cement ratio to determine compressive strength of cement is taken as | 302 |
| 15 | 3. The limiting depth of neutral axis for a reinforced concrete beam of size 250 mm in width and 550 mm in depth, with effective cover of 50 mm for reinforcement, using Fe 500 steel is: | 310 |
| 16 | 2. If the length of an intermediate span of a continuous slab is 5 m , the length of the end span is kept | 271 |
| 17 | The city roads which are meant for the through traffic usually on a continous route are known as a | 274 |
| 18 | Maximum dry density using (ISHCT or modified compaction test) should not be less than __ (kg/m3) for embankments height greater than 3m | 285 |
| 19 | Soils having soluble sulphate content (SO3) greater than __ % are considered unsuitable in construction of embankment as well as subgrade | 288 |
| 20 | The moment of inertia of a triangle of base b and altitude h with respect to a centroidal axis parallel to its base would be | 308 |
ู
ุชุงุญ ุงูุขู! ุจุญุซ ุชูููุบุฑุงู
2025 โ ุฃูู
ุฑุคู ุงูุนุงู

