Bad Dog
الذهاب إلى القناة على Telegram
DM to join the discussion chat. It is no longer linked to the channel
إظهار المزيد1 401
المشتركون
-124 ساعات
-17 أيام
+530 أيام
أرشيف المشاركات
1 401
While I’m not set up, I was able to break ground and adjust the tail for Aaric. Claws next
1 401
set up several shelves today! Working on clearing up the basement area into functional storage for ongoing projects. Getting about 1000 yards of Lycra stored took a lot
1 401
Setup is not a fast process and for the main work room where the minky is I’ll prob move most of the stuff on those shelves as I still have shelves to set up. 3D printing area has a lot to go. Honestly everywhere does, but working rlly hard to get things where they gotta be
1 401
All the fur is moved over (NOT sorted), all commissions in progress moved over. Still have a lot of other things to move before I can begin setup
1 401
Big moving day today! Juki, embroidery machine, about half the fur are moved over. Still have a decent bit of shelves, desk, and ton of fur to move. It’ll take time to set everything up properly!
1 401
been repainting new spot. The sump drain is completely clogged, utilities r on, tmr is the start of the second uhaul to move the shop. I have to replace the pressure regulator valve for the water heater. Finally got utilities on. Moved all the 3D printers, printers, dye sub, and fursuit heads today
1 401
Unloaded the storage assets that weren’t stolen. Still must unload them. Today was a huge work day
1 401
Heads up- have to very suddenly move. It’ll be a few weeks before it begins. Working on packing down the shop but it’s not a fast process esp w this health condition. I will likely get surgery when the heavy lifting is done
