ar
Feedback
ByteTikvah

ByteTikvah

الذهاب إلى القناة على Telegram

English translations & summarization of Ethiopian news from Tikvah Ethiopia, We are not affiliated, associated, authorized, endorsed by, or in any way officially connected with TIKVAH-ETHIOPIA Sources: @tikvahethiopia Contact: Direct Message

إظهار المزيد
لم يتم تحديد البلدالفئة غير محددة
215
المشتركون
لا توجد بيانات24 ساعات
+17 أيام
-130 أيام
أرشيف المشاركات
The Central Ethiopia Region announced that out of 85,531 students who took the regional 8th-grade exam this year, 83,342 stud
The Central Ethiopia Region announced that out of 85,531 students who took the regional 8th-grade exam this year, 83,342 students, or 97.4 percent, passed. The region also announced that out of 1,538 schools, 1,017 schools passed all their students, and stated that no school failed any student. It also indicated that this year's result improved by 61.5 percent compared to the 2017 Ethiopian calendar year. http://ce.ministry.et @tikvahethiopia Original Post: https://t.me/tikvahethiopia/107010
tldr: Central Ethiopia Region announced a 97.4% pass rate for 8th-grade exams this year, with 1,017 schools achieving a 100% pass rate. This marks a 61.5% improvement over the 2017 Ethiopian calendar year results. #Education @ByteTikvah

Saudi Arabia announced the arrest of 14 Ethiopians and Yemeni citizens attempting to smuggle 240 kilograms of khat in the Asi
+1
Saudi Arabia announced the arrest of 14 Ethiopians and Yemeni citizens attempting to smuggle 240 kilograms of khat in the Asir region. In a separate operation, three Ethiopians were also apprehended while trying to smuggle 17 kilograms of hashish and 7,500 amphetamine pills. After completing initial legal procedures, Saudi Arabian border guard forces handed over the suspects and the seized drugs to the relevant authority. Importing or trafficking narcotics into Saudi Arabia can result in the death penalty, and many have previously been sentenced to death for drug trafficking. Original Post: https://t.me/tikvahethiopia/107009
tldr: Saudi Arabia arrested 17 individuals, including Ethiopians and Yemenis, in two separate operations for attempting to smuggle 240 kg of khat, 17 kg of hashish, and 7,500 amphetamine pills. Drug trafficking in Saudi Arabia carries a potential death penalty. #Crime @ByteTikvah

Response to the Audit Finding It is recalled that the Federal Auditor General disclosed significant audit findings on the Wel
+9
Response to the Audit Finding It is recalled that the Federal Auditor General disclosed significant audit findings on the Welmel and Chelchel irrigation projects. After this report was released, the Ministry of Irrigation and Lowland Areas issued a statement, though it did not directly name the Office of the Auditor General. The main contractor, Alemayehu Ketema General Contractor, directly responded to the report. In its statement, without directly naming the Federal Auditor General, the Ministry stated that efforts to obstruct and tarnish the achievements recorded in the irrigation sector are unacceptable. It mentioned that historically unprecedented results are being achieved in Ethiopia's irrigation sector, indicating the existence of forces that do not want to accept and criticize this success. Furthermore, it announced that the projects' implementation was carried out according to law and contract, price adjustments have been applied since 2013 E.C. (2020/2021 G.C.) based on government decisions, new study and design standards for irrigation projects are being prepared, and the work of successfully completing ongoing projects will continue to be strengthened. Alemayehu Ketema General Contractor, for its part, stated that it had not received the full audit report and that the findings presented in the media do not represent it and are incorrect. While stating that there was absolutely no prohibition on price adjustments for the Chelchel project, it explained that for the Welmel project, even though price adjustment was not allowed, the price adjustment made was based on approval and directive from the Ministry of Finance and the Public Procurement and Property Administration Agency, and through the direction given by the Ministry of Irrigation and Lowland Areas, which is the project owner. It stated that contract amendments were made considering the significant price increases that occurred in construction input materials, fuel, machinery, etc. The contractor also stated that change orders were executed due to design changes, unforeseen underground conditions, and additional works approved by the employer, and were not illegal. It also mentioned that vehicle purchases were contractually permitted acquisitions made for project monitoring and supervision, and announced that upon project completion, they would be transferred from Code-3 to Code-4 (to the government). It explained that this is a fully legal procedure practiced in large infrastructure projects both in Ethiopia and internationally. The contractor stated that the report claiming "the purchase of seven field vehicles for 75 million Birr was made with fraudulent payment verification, generating an additional 6 million Birr benefit for the contractor" is completely false. It stated that only two vehicles were purchased for the Welmel irrigation project and are in the possession of the office. The contractor indicated that it did not gain any undue benefit from property acquisition. The contractor announced its full readiness to cooperate with any legal, independent, and evidence-based investigation and its willingness to provide all relevant documents to all concerned bodies. In the report recently disclosed by the Federal Auditor General, on the projects: - Tender procurement violations - Repeated contract amendments - 3.7 billion Birr price adjustment - 935 million Birr additional expenditure - 83 million Birr vehicle purchases (Prado and LC300 V6) (90% covered by Chelchel project budget), with vehicles in the contractor's possession. - Construction of 24 villa houses outside the main contract. - Indicated numerous deficiencies in... Original Post: https://t.me/tikvahethiopia/107007
tldr: Ethiopia's Federal Auditor General found major irregularities in Welmel and Chelchel irrigation projects. Both the Ministry of Irrigation and the contractor denied the audit findings, asserting project legality and readiness for investigation. #Politics @ByteTikvah

Human-Monkey ConflictRecently, Nech Sar National Park, in a letter written to Arba Minch City Peace and Security, Police, Env
+1
Human-Monkey ConflictRecently, Nech Sar National Park, in a letter written to Arba Minch City Peace and Security, Police, Environmental Protection Office, and Culture and Tourism Department, stated that monkey troops found in Nech Sar National Park: - in Arba Minch city Television neighborhood, - at Arba Minch University, - at Arba Minch Airport, and around Arba Minch General Hospital, due to repeated attacks they cause, a systematic monkey reduction operation will be carried out starting from 10/11/2018 E.C.The letter was written to inform residents so that the community would not panic when gunshots are heard and to ask for their cooperation in the implementation.This letter has been circulated on social media and become a topic of discussion.Tikvah Ethiopia spoke to the manager of Nech Sar National Park, park employees, and Arba Minch city residents about the letter and the issue.What did residents say?Residents living near Nech Sar who spoke to Tikvah Ethiopia said, "The measure is overdue."According to them, the monkey troops have not only destroyed garden vegetables and crops but also caused damage by breaking roof sheets and stealing household items.One resident living near Arba Minch Hospital, who said, "My child was chased and scratched, and we are worried if she might contract another disease," stated that the troop has been specifically attacking vulnerable people, and they have repeatedly reported it to the police. They expressed their happiness upon hearing that the reduction operation would be carried out based on a court decision.What did park employees say?Employees who have worked for many years at Nech Sar National Park told Tikvah Ethiopia that the monkey population in the park has been increasing over time, causing repeated significant damage to villages and institutions near Nech Sar.According to a park community service employee, the monkey troops have not only caused extensive damage to crops, vegetables, and fruits but have also started eating residents' chickens and goat kids, leading to significant complaints from the community.As a result, employees explained that they frequently faced criticism from the community.Later, the local community took the matter to court, and based on the court's decision, after necessary preparations were completed, it was decided to carry out a reduction operation targeting old and alpha monkeys, they told Tikvah Ethiopia.What did the park manager say?Mr. Meseret Demelew, head of Nech Sar National Park, told Tikvah Ethiopia that the letter circulating on social media is authentic, but the way it is being circulated "has another agenda."According to him, behind the letter, a survey involving stakeholders was conducted following the necessary steps, procedures, and guidelines, and after appropriate national notification was given, the work was put into implementation.Mr. Meseret stated, "As an animal protection body, we do not commit illegal acts against animals," and clarified that the reduction operation: ° by the Ethiopian Biodiversity Institute, the Wildlife and Environmental Protection Authority, ° by the Ethiopian National Parks Headquarters, ° by the Arba Minch City Mayor's Office and other stakeholders, is a process that has been discussed and approved.He also pointed out that this approach is a procedure applied in other areas when wild animals commit similar attacks on people.Tikvah EthiopiaHawassaJuly 13, 2018 E.C.@tikvahethiopia Original Post: https://t.me/tikvahethiopia/106996
tldr: Nech Sar National Park will begin a systematic monkey reduction operation in Arba Minch starting November 10, 2018 E.C., due to repeated attacks on residents and property. This measure, supported by a court decision and various stakeholders, aims to address significant damage and safety concerns. #Local @ByteTikvah

Six homebuyers have taken Noah Real Estate to the Federal High Court, stating, "We have handed over our apartments for which
+1
Six homebuyers have taken Noah Real Estate to the Federal High Court, stating, "We have handed over our apartments for which we paid over 50 million Birr." The buyers filed the lawsuit concerning the 19-story Noah Victory Site located in the Yeka Sub-city, Woreda 6, Women's Square area of Addis Ababa. According to the plaintiffs, the developer, Noah Real Estate, had contractually agreed to complete construction and hand over the apartments within 36 months, but in practice, it took six years. The plaintiffs state that Noah Real Estate had agreed in the contract to complete and hand over the apartment residential units within three years from the contract date, but "during this time, the defendant was unable to complete and hand over the apartment to the plaintiffs." They mentioned that the construction was completed three months ago this year, and even after a long delay, Noah Real Estate is unwilling to hand over the apartments to the plaintiffs as per the contract. For this reason, they stated in their lawsuit that they were forced to go to court after giving a written warning on March 30, 2018 E.C., but received no positive response. Noah Real Estate, for its part, stated that the plaintiffs have not paid the square meter difference that arose when individual maps were prepared. It also mentioned that although it discussed the matter with the buyers, they took the issue to court. The buyers explained that the disagreement between the two parties arose because after Noah Real Estate announced "Your house is completed," it told the buyers who came to collect their keys, "A square meter difference has occurred when the sub-city prepared individual maps; pay an additional fee." They further explained that the payment increase came about because the square footage of common areas increased when individual maps were prepared. Noah Real Estate stated that the square meter area mentioned in the contract showed an increase of more than 10 percent and that it has the right to demand additional payment according to the contract. The lawsuit document shows that the 1st plaintiff, Ato Tamrat Gezahegn Gero, purchased a residential unit with a net area of 176.74 square meters, plus 31.24 square meters of common and circulation areas, totaling 207.98 square meters, for 12 million Birr and completed his payment. The lawsuit document further explains that other plaintiffs similarly completed their payments in full, specifying the area of their homes, common areas, and circulation areas. In its response to the court, Noah Real Estate admitted that the plaintiffs had made their payments and that construction was completed, but cited that an increase of more than 10 percent in square footage was observed when individual maps were prepared. For example, it stated that the 1st plaintiff's house area, specified as 207.98 square meters in the contract, was found to be 265 square meters on the individual map. It also indicated that for the 2nd and 3rd plaintiffs, 207.98 square meters was specified in the contract, but it was 265.11 square meters on the map, which is an increase of 57.13 square meters. The document also indicates that the 4th plaintiff has a similar increase of 57.13 square meters, while the remaining two plaintiffs showed a difference of 44.5 square meters. The plaintiffs, on their part, stated that no additional square footage was added to their apartments and that they would not pay the additional fee of 3 to 4 million Birr requested for the alleged increase in the individual map, stating "it does not concern us." Furthermore, they mentioned that according to Article 6.1 of their contract, they had agreed that no adjustment would be made to the apartment's sale price. They also stated... Original Post: https://t.me/tikvahethiopia/106994
tldr: Six homebuyers are suing Noah Real Estate for delayed apartment delivery and demanding 3-4 million Birr extra for alleged square footage increases, which buyers dispute. #Business @ByteTikvah

Addis Ababa University College of Technology and Built Environment School of Information Technology and Engineering Exciting
Addis Ababa University College of Technology and Built Environment School of Information Technology and Engineering Exciting training opportunity on Data Analytics, Visualization and Dashboard development with Power BI Want to be a pioneer in “Data Analytics with power BI”? IF SO, SECURE your SLOTS as soon as possible. Eligibility: Everyone from any background with interest in data analytics with Power BI. Programming background is not mandatory Registration July 19,2026 to Aug 7, 2026 Class start: Aug 8, 2026 Class mode: Fully live online (All lab and lecture resources will be shared with full video recording after every class session) Class Duration: 4 weekends Class Time: Every Saturday and Sunday from (2:00 pm – 6:00 pm) Certification: You will earn one certificates in this training. Register Here: https://forms.gle/QSK4mnKGYYCEd9mT6 OR physically at 5 kilo campus, school of Information Technology office, during office hour Join Our telegram channel: @DataScience_AAU For more information contact us: Mobile: 0979724497 | 091212 0795 Office: 011-1-260194 Payment Address: Technology Faculty Commercial Bank Of Ethiopia Acct No: 1000010755313 Note**: upload your payment receipt here https://forms.gle/QSK4mnKGYYCEd9mT6 or send via Telegram @kasabd97 Original Post: https://t.me/tikvahethiopia/106992
tldr: Addis Ababa University is offering an online training opportunity in Data Analytics, Visualization, and Dashboard development using Power BI. The 4-weekend course starts August 8, 2026, with registration open until August 7, 2026, and is open to all backgrounds. Participants will earn a certificate upon completion. #General @ByteTikvah

#WorldCup: Spain became the World Cup winner. Spain, which fought against Argentina in the 2026 World Cup final, won the trop
+5
#WorldCup: Spain became the World Cup winner. Spain, which fought against Argentina in the 2026 World Cup final, won the trophy by defeating them 1-0. Spain scored one goal and won in the additional 30 minutes after the regular 90 minutes of the game ended. Throughout the entire game, Spain had a significant advantage. Lionel Messi's chance to achieve consecutive World Cups was unsuccessful. July 13, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106991
tldr: Spain defeated Argentina 1-0 in the 2026 World Cup final, securing the trophy with a goal scored in extra time. This victory prevented Lionel Messi from winning consecutive World Cups. #Sport @ByteTikvah

... The 'Golden Visa' card, which is given to foreign investors and is valid for up to 10 years, will become operational in t
+1
... The 'Golden Visa' card, which is given to foreign investors and is valid for up to 10 years, will become operational in the current budget year" - Immigration and Citizenship Service (to Tikvah Ethiopia) The Immigration and Citizenship Service (ICS) told Tikvah Ethiopia that it will make the 'Golden Visa' card, which is given to foreign investors who make a significant contribution to the country's economy and is valid for up to 10 years, ready for service in the current 2019 budget year. It has been stated that this residence permit, named 'Golden Visa', is issued in card form in countries like the United Arab Emirates (UAE) and others, and grants special privileges to foreign business owners/investors. The 10-year Golden Visa card is primarily designed to provide long-term security for investors who wish to work in Ethiopia by injecting significant capital, and for their families. Explaining why the card is named "Golden Visa," the Immigration and Citizenship Service told us, "The reason we call the 'Golden' Visa card a visa is to highlight the special benefits (privileges) it provides to the people," adding that it is a system similar to what other countries implement. He added, "The Golden Visa is related to investors; they can stay for ten years with the visa. Its main purpose is to encourage investors to inject significant capital and feel secure in this country, allowing them and their families to work in Ethiopia for a long time, connected with the country." Regarding the benefits of the card, he confirmed, "When a foreign national lives in Ethiopia, they must have a legal residence permit or an Ethiopian-origin ID; otherwise, they can only stay for a short period, like a regular visa, but cannot reside. When it comes to the 'Golden Visa,' for example, if someone invests 10 million dollars or more, and applicants are confirmed to be free from any security threats, they will receive the card. Receiving it means they are legal residents in Ethiopia." The service confirmed to Tikvah Ethiopia that the necessary proclamation and regulation amendments for launching the service have been approved and finalized by the Council of Ministers and the House of People's Representatives. Currently, work is underway to finalize detailed implementation directives with the Ministry of Justice, along with infrastructure development and card preparation (personalization). Although it was stated that one could obtain the card by "investing 10 million dollars or 5 million dollars and creating job opportunities for many Ethiopians, fulfilling one of the two criteria," the upcoming implementation directive will determine: • What does it mean to create job opportunities for many Ethiopians? What is the number? • How will it be revoked if there are security-related issues? • How will a foreign investor engaged in a very challenging field of work and an investor who created job opportunities requiring less effort be viewed? These and other detailed matters will be decided. It is stated that after the necessary legal and technological preparations are completed, the Golden Visa card will begin to be issued to investors within the 2019 budget year. Investors are expected to pay 10,000 US dollars for regular service and 12,500 US dollars for express service to obtain this 10-year Golden Visa card. Additionally, a 'home service' option has been prepared to allow access to the service conveniently at their location. Tikvah Ethiopia Addis Ababa July 12, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106985
tldr: Ethiopia will launch a 10-year "Golden Visa" for foreign investors contributing significantly to the economy, requiring a minimum $5-10 million investment and a fee. #Business @ByteTikvah

Success Bank volleyball team became the champion of the 2018 ESEMACO National Sports Competition 🏆🏐🎉The Success Bank men's
+3
Success Bank volleyball team became the champion of the 2018 ESEMACO National Sports Competition 🏆🏐🎉The Success Bank men's volleyball team, which participated in the 2018 ESEMACO Sports Competition organized by the Confederation of Ethiopian Trade Unions (ESEMACO) and held nationwide with great fanfare, became the champion.Congratulations to you; congratulations to us!Success Bank, the foundation of your success! Original Post: https://t.me/tikvahethiopia/106980
tldr: Success Bank's men's volleyball team won the 2018 ESEMACO National Sports Competition, organized by the Confederation of Ethiopian Trade Unions. #Sport @ByteTikvah

The Ministry of Education has issued a directive stipulating that the term of office for university presidents shall be 6 years for a single term. According to the provisions of the directive, male candidates competing for the presidency must have at least the academic rank of Assistant Professor or higher. The Ministry of Education has unveiled a new directive (Directive No. 1146/2018) governing the appointment of presidents and vice-presidents in government higher education institutions. This directive aims to transform the previous leadership appointment system in higher education institutions, establishing a process based on merit and competition. The Ministry stated that universities are currently undergoing numerous reform efforts, emphasizing the need for leaders who are professionally mature, ethically sound, and accepted by the university community to guide these changes. The new directive stipulates that the leadership selection will be guided by a transparent point allocation system (30/30/40). Accordingly, educational background and academic rank will account for 30% of the points, where the educational level and academic rank of candidates competing for president and vice-president will be assessed (the higher the rank, e.g., Professor, the higher the points awarded). Work experience will similarly account for 30% of the points, with candidates' time spent in institution building and leadership roles being detailed and scored. Another major component in the leadership selection, accounting for the largest share of points, is strategic plan and presentation (40%). Candidates are required to present a detailed plan to the university council and board members, demonstrating how they will address the institution's problems and lead it forward. The recruitment process will be led by two independent committees (a 4-member candidate identification committee and a 7-member recruitment and selection committee). Candidates nominated for leadership positions in government higher education institutions must not have been accused and found guilty of serious crimes related to corruption, breach of trust, or ethics, and must not have civil lawsuits that could affect their job performance. Additionally, candidates are required to be Ethiopian or of Ethiopian origin, and must be able to serve a full term of office before reaching retirement age. Regarding academic qualifications, male candidates competing for the presidency must have at least the rank of Assistant Professor or higher. Regarding term limits, a leader who has served as president in any government university for two consecutive terms cannot compete again; however, a leader who has served as vice-president for two terms can compete for the presidency, as stated in the directive. Regarding work experience and educational background requirements, a candidate competing for the presidency must have served at least 2 years as president or 3 years as vice-president/dean. The directive includes special provisions to encourage women's participation, allowing female candidates to compete with a second degree without requiring a specific academic rank if there are not enough qualified female candidates. According to the directive, the term of office for a university president is 6 years for a single term, while for vice-presidents it is 4 years. A university president may continue for a second term without competition after completing one term only if the institution's performance is high and approved by the Ministry of Education. However, the leadership will be evaluated quarterly by the board during their tenure. If the performance falls below 60% in two consecutive six-month evaluations, if they are unable to perform their duties due to healt... Original Post: https://t.me/tikvahethiopia/106979
tldr: Ethiopia's Ministry of Education issued a new directive for university presidents, setting a 6-year term and establishing a merit-based selection process. #Education @ByteTikvah

Second week Thursday in South Africa. Ethiopian immigrants residing in South Africa informed Tikvah Ethiopia that the attacks
Second week Thursday in South Africa. Ethiopian immigrants residing in South Africa informed Tikvah Ethiopia that the attacks and harassment they typically faced every Thursday from anti-immigrant groups did not materialize as feared this second week, and the situation was relatively calm. Previously, an extremist anti-immigrant group had threatened to hold weekly Thursday protests, apprehending undocumented immigrants by its own force and handing them over to the police. Following this, on the first Thursday after June 30 (G.C.), significant activity occurred in various parts of the country, leading to the arrest and handover to police of many foreign nationals, including numerous Ethiopians; this created great fear and panic among the immigrant community. However, on the second Thursday, Ethiopians living in the country reported that the situation was significantly calmer and more stable compared to the previous events and fears. Nevertheless, they cautioned that complete complacency should not be adopted at this time, and precautions should continue to be taken. Tikvah Ethiopia, Hamle 11, 2018 E.C. Original Post: https://t.me/tikvahethiopia/106978
tldr: Ethiopian immigrants in South Africa reported a calmer second Thursday, with fewer anti-immigrant attacks than feared, following previous arrests of foreign nationals. They advise continued caution despite the improved situation. #World @ByteTikvah

The Zambian Immigration Department announced the arrest of 9 Ethiopians who were attempting to illegally enter South Africa and 2 Zimbabwean drivers who were transporting them in a truck in an area called Kazungula. The suspects have been charged with human trafficking, and the nine (9) Ethiopians are awaiting their legal process. The department indicated that it will continue to strengthen control in border areas. Tikvah Ethiopia, Hamlé 11, 2018 E.C. Original Post: https://t.me/tikvahethiopia/106977
tldr: Zambian authorities arrested 9 Ethiopians attempting illegal entry to South Africa and 2 Zimbabwean drivers for human trafficking in Kazungula. #Crime @ByteTikvah

National Dialogue #Day4 The Ethiopian Political Parties Joint Council told Tikvah Ethiopia that three political parties, whic
National Dialogue #Day4 The Ethiopian Political Parties Joint Council told Tikvah Ethiopia that three political parties, which had not participated in the national dialogue, finally joined the national conference at the last minute. Previously, some political parties had remained outside the dialogue, demanding that various preconditions be met. According to Ato Solomon Ayele, Chairman of the Council, "Wolaita National Movement (WBN), Arena Tigray, and Enat Party participated in the conference being held at the Convention Center; there are still 5 or 6 parties that have not participated; we have called on them to participate." He also stated that more than sixty (60) political parties participated in the conference. On his part, Professor Mesfin Araya, Chief Commissioner of the National Dialogue Commission, stated that parties that had not participated previously submitted requests and were finally included, emphasizing that this is essential for the country. He also called on parties and armed groups that have not yet participated to join the dialogue. Enat Party had previously not participated in the agenda-setting process, and when asked by Tikvah Ethiopia why it wouldn't participate, it stated, "Negotiations must precede the dialogue, a ceasefire must be established, and a political solution must be sought for the war in the Amhara region." On the other hand, there were participants who came to the conference without being invited, but it was stated that the issue was resolved later. Commissioner Mesfin said, "There were problems encountered in the process over the past few days. The problems are minor. For example, many people showed interest at the end without us distributing badges." Relatedly, Ato Solomon Ayele told Tikvah Ethiopia that the problem caused by political party participants objecting to being assigned to only one agenda has been corrected. He stated that the parties' suggestion was correct, that the error was not intentional, and that now all four participants from each party have been assigned to discuss various agendas. Tikvah Ethiopia Addis Ababa July 11, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106976
tldr: Three previously boycotting political parties, including Wolaita National Movement, Arena Tigray, and Enat Party, joined Ethiopia's national dialogue on its fourth day. Over 60 parties are now participating, with calls for remaining holdouts and armed groups to join the crucial discussions. #Politics @ByteTikvah

"It is forbidden to imprison journalists and chief editors without a court conviction" - Mrs. Semegne Wube.It is known that t
+1
"It is forbidden to imprison journalists and chief editors without a court conviction" - Mrs. Semegne Wube.It is known that the Freedom of Information Proclamation No. 1427/2018, prepared by the Ethiopian Institution of the Ombudsman, was approved by the House of People's Representatives on June 18, 2018 E.C.According to this Freedom of Information Proclamation, Chief Ombudsman Mrs. Semegne Wube stated that it is forbidden to imprison journalists, chief editors, and any other person related to a case for investigation or any other reason before a court conviction is issued.Mrs. Semegne added that a media professional (journalist) who disseminates information in good faith is exempt from liability."Even if a document legally obtained by a journalist from a government or private organization contains distorted or incorrect information, if it is proven that the information was shared or published to the public in good faith, they will not be held legally accountable," she said.She further added, "A journalist who has been subjected to administrative or legal punishment for disclosing information concerning a fault or a serious harmful danger to the public has the right to appeal to the court."The proclamation stipulates that anyone who intentionally: destroys, damages, alters, deletes, conceals, falsifies, maliciously withholds, creates a false document, or causes information to be kept secret to cover up corruption, other illegal practices, inefficiency in performance, or a scandal of an individual, government body, or organization, shall be punished with imprisonment not exceeding 5 years or a fine of 100,000 Birr, or both.Similarly, it states that refusing an information request, failing to provide information, being unwilling to assist information seekers and persons with disabilities, failing to provide copies, or intentionally providing false information shall be punishable by simple imprisonment of up to 1 year or a fine ranging from 25,000 to 50,000 Birr.Furthermore, it is stated that any entity that intentionally fails to fulfill obligations stipulated in the proclamation shall be fined between 25,000 and 50,000 Birr.According to Mrs. Semegne, while the previous proclamation imposed the obligation to provide information only on government institutions, the new proclamation also obliges large private organizations, private entities working in partnership with the government, and those acting as government representatives to provide information.As per the proclamation, every institution has an obligation to provide information and is required to assign an independent information officer to enforce this obligation.Furthermore, it is stated that each institution must submit an annual report containing information requests received, responses given, and reasons for refusal to the Institution of the Ombudsman, and the Ombudsman will submit these reports annually to the House of People's Representatives.Mrs. Semegne stated that draft regulations and directives to fully implement the proclamation have been prepared, and work will continue based on the proclamation until these regulations are approved by the Council.Tikvah Ethiopia Addis Ababa July 11, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106975
tldr: Ethiopia's new Freedom of Information Proclamation (1427/2018) prohibits jailing journalists without conviction and protects good-faith reporting. It mandates information sharing from private entities and penalizes obstruction or falsification. #Politics @ByteTikvah

The case that has been litigated for over 2 years between Flintstones S.C. and its customers has reached a conclusion at the
+1
The case that has been litigated for over 2 years between Flintstones S.C. and its customers has reached a conclusion at the Federal Cassation Court. According to the ruling, Flintstones Share Company will pay over 282 million Birr in compensation to its former customers. The Federal Supreme Court Cassation Bench, in its session held on 08/11/18 E.C., upheld the decision previously given by the Arbitration Tribunal regarding 212 customers who filed a lawsuit against "Flintstones Engineering S.C." (currently named Flintstones S.C.) for purchasing homes from the company but not receiving construction handover. The case began because Flintstones Engineering S.C. failed to hand over homes within the agreed-upon time, according to home purchase contracts entered into with its customers from 2008 to 2009 E.C. The customers had purchased homes through a contractual agreement with Flintstones Homes S.C., a real estate company engaged in building and selling houses, for the construction and handover of condominium buildings at a site called "Bole Beshale" in Lemi Kura sub-city, Addis Ababa. According to the contract, the home handover should have been completed within 28+2 months from the year the customers made the purchase; however, due to repeated delays in construction by the company, the customers did not receive handover for many years. Although the plaintiff customers made the home purchases at various times between 2008 E.C. and 2009 E.C., Flintstones failed to build and hand over the homes within the contract period specified in their home construction and sale agreements. Following this, 212 plaintiffs (homebuyers) jointly took the matter to an Arbitration Tribunal and filed a lawsuit. The Arbitration Tribunal, after hearing evidence and arguments from both parties, issued a detailed ruling on May 23, 2016 E.C. In its decision, the Tribunal confirmed that the customers have the right to compensation for the damages they incurred because the company failed to adhere to the contractual construction completion deadlines (i.e., 15 months for foundation work, additional months for second-stage construction, and final handover time, all calculated from the contract signing date). At the Tribunal, Flintstones Share Company argued that it could not build and hand over the construction as per the contract due to the COVID-19 pandemic, the civil war in the north, the depreciation of the Birr's purchasing power, foreign currency shortages, and other related reasons, but these arguments were not accepted by the Tribunal. Accordingly: - Delay compensation calculated based on the house size (in square meters) and contract price should be paid to each plaintiff customer; - Proportional compensation should be calculated for each house based on an average square meter price of Birr 13,700.00, considering varying sizes (ranging from 41.08 to 86.23 square meters); - The defendant company should pay a total compensation of over 282,780,000 Birr to all 212 plaintiffs combined; - And additional interest and related costs should be covered as per the law, the Tribunal decided. The decision orders that the payment be made to each plaintiff based on individually calculated amounts, specified by name and house number. Dissatisfied with the Arbitration Tribunal's decision, the plaintiffs took the case to the Federal Supreme Court Cassation Bench with a cassation appeal. The individuals who purchased the homes (plaintiffs) took the case to the Cassation Bench with the main argument that the company should pay compensation based on the current market value. The plaintiffs argued that while the average square meter price was 13,700 Birr when they bought the homes, the market value had incre... Original Post: https://t.me/tikvahethiopia/106972
tldr: The Federal Cassation Court ordered Flintstones S.C. to pay over 282 million Birr in compensation to 212 customers for failing to deliver contracted homes, upholding an arbitration ruling. #Business @ByteTikvah

A peaceful demonstration was held at Meskel Square, organized by the Tigray Peace and Change Council, under the slogan "Stop
+5
A peaceful demonstration was held at Meskel Square, organized by the Tigray Peace and Change Council, under the slogan "Stop Abductions, Let Peace Prevail." The demonstration called for an end to the tense situation in the region and for lasting peace to prevail. Ato Getachew Reda, the Prime Minister's Advisor on East African Affairs, who was present at the demonstration, stated that efforts to implement the Pretoria Agreement were hampered by "a group seeking to seize full power." According to his explanation, it was chosen to align with Shaebia by creating a narrative that the agreement "collapsed" without being implemented. In his speech, Ato Getachew stated that the TPLF, in cooperation with Shaebia, exacerbated conflict in Tigray, led youths to death and displacement, and exposed the region to instability. He also emphasized that youths are being sold to foreign forces and that young people who opposed the group's actions have been imprisoned, stressing that there should be accountability for this situation. Furthermore, he stated that the budget allocated to the region has been wasted instead of being used for public services, and this was hidden from the public while repeatedly blaming the federal government. Ato Getachew emphasized that the solution to Tigray's problem can only be found through peace and dialogue, and that any solution must be people-centered. He also called on the federal government to fulfill its constitutional responsibility to protect the people and urged the international community to exert appropriate pressure on the issue. On the other hand, at the demonstration: - "The repressive decree imposed by the TPLF group must be lifted immediately!" - "Enough with war; peace is the choice of the Tigrayan people." - "The forced abduction of youths for war purposes must stop!" - "Enough with war, enough with displacement!" - "Peace is the choice of the Tigrayan people!" - "The Pretoria Agreement must be fully respected!" July 11, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106970
tldr: A peaceful demonstration in Meskel Square called for peace in Tigray, as a PM advisor accused the TPLF of hindering the Pretoria Agreement and causing instability by aligning with Shaebia. #Politics @ByteTikvah

#Reminder: Tomorrow, Saturday, for Tikvah Ethiopia family members who will be traveling for work or various personal matters, or who have appointments or plans to visit friends and relatives, roads will be closed starting from 5:00 AM due to a rally taking place at "Meskel Square". When you leave home tomorrow morning, please use alternative routes. To view the closed roads 👉 https://t.me/tikvahethiopia/106957?single #AddisAbaba @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106964
tldr: Roads around Meskel Square in Addis Ababa will be closed starting 5:00 AM on Saturday due to a rally; commuters should use alternative routes. #Local @ByteTikvah

The U.S. Department of Homeland Security (DHS) has issued a new draft directive that will limit the stay of foreign students,
The U.S. Department of Homeland Security (DHS) has issued a new draft directive that will limit the stay of foreign students, cultural exchange participants, and journalists in the United States. According to the directive, students will be allowed to stay for a maximum of 4 years; if they need additional time to complete their studies, they will have to apply for a visa extension. The time given to leave the country after completing their studies will also be reduced from 60 to 30 days. Additionally, the stay for foreign journalists will be limited to 240 days, while for journalists of Chinese nationality, it will be only 90 days. The Department stated that the decision was necessary due to the increasing number of temporary visa holders and the difficulty in controlling people who overstay their permitted time. The directive will become effective 60 days after its publication in the Federal Register. Reuters is the source of the information. July 10, 2018 E.C. Original Post: https://t.me/tikvahethiopia/106963
tldr: The U.S. Department of Homeland Security proposes new rules to limit foreign students' stays to four years and journalists' stays to 240 days, aiming to curb overstays. #Politics @ByteTikvah

To students and parents:It is known that this is the time when schools are closed and preparations for the next academic year
To students and parents:It is known that this is the time when schools are closed and preparations for the next academic year are being made.So, as a new academic year approaches, individuals and organizations claiming "we send abroad for free education opportunities" proliferate like mushrooms.The enticing advertisement used to attract students is "we will send you abroad on a scholarship without any payment."And then? They say, "Pay money upfront, then we will send you."There is no stone unturned to defraud students and their families, so be careful.Therefore:- Before accepting any scholarship opportunity, thoroughly verify the institution's credibility.- When asked to "pay an upfront fee," investigate carefully; do not pay money without verification.- If any institution is genuine, it should provide sufficient information about its service without requiring upfront payment.- Parents, in this era of high cost of living, do not pay money without verification out of emotion for your children; exercise extreme caution.Tikvah EthiopiaJuly 10, 2018 E.C.@tikvahethiopia Original Post: https://t.me/tikvahethiopia/106962
tldr: Tikvah Ethiopia warns students and parents against scholarship scams demanding upfront payments for "free education abroad"; always verify before paying. #Crime @ByteTikvah

Tomorrow's Meskel Square Rally The peaceful rally to be held tomorrow by the Tigray Peace and Change Council at Meskel Square
Tomorrow's Meskel Square Rally The peaceful rally to be held tomorrow by the Tigray Peace and Change Council at Meskel Square in Addis Ababa is to: - Protest the abuses committed against Tigrayan mothers, - Protest the forced military conscription, death, and displacement of youth, - Protest humanitarian problems, and to demand the implementation of the Pretoria Agreement and for the federal government to fulfill its constitutional responsibilities. The Council stated that the rally reflects the Tigrayan people's love for peace and hatred for war, and called on Tigrayans living in Addis Ababa and its surroundings to participate. On the other hand, the TPLF strongly opposed the rally, stating that it is "an anti-existence activity targeting the Tigrayan people." It also warned the rally organizers that they "will not escape historical, moral, and legal accountability," and urged them to refrain from their actions. In a message conveyed on social media by Ato Getachew Reda, former TPLF and regional president, he stated that the rally is being held to protest attacks, displacement, death and displacement of youth, and war against the Tigrayan people, and called on "everyone concerned about existence and peace to raise their voice." He also stated that "the rally opposes the backward group that seeks to assert its existence on the suffering of the people." July 10, 2018 E.C. @tikvahethiopia Original Post: https://t.me/tikvahethiopia/106961
tldr: The Tigray Peace and Change Council plans a rally in Addis Ababa to protest abuses in Tigray and demand Pretoria Agreement implementation, facing strong TPLF opposition. The TPLF labels the rally an "anti-existence activity" targeting Tigrayans, warning organizers of accountability. #Politics @ByteTikvah