የ2019 ዓ/ም 1ኛ ሩብ ዓመት የኮንስትራክሽን ስራዎች ቀጥተኛ ዋጋ ጥናት
2019 E.C 1st Quarter Construction Works (Only Direct Cost)
የአዲስ አበባ ከተማ አስተዳደር ዲዛይንና ግንባታ ስራዎች ቢሮ
18 Noy, 02:43
የግንባታ ስራ ጨረታ ማስታወቂያ፡
የአዲስ አበባ ከተማ መንገዶች ባለስልጣን ከዚህ በታች የተዘረዘሩትን የመንገድ ግንባታ ፕሮጀክቶች በግልፅ ጨረታ አወዳድሮ ማሰራት ይፈልጋል።
ፍላጎት ያላቸው ተቋራጮች በሙሉ የeGP system ላይ በመግባትና አስፈላጊውን መረጃ በመሙላት መሳተፍ ይችላሉ።
Construction Works Tender Notice:
The Addis Ababa City Roads Authority invites eligible contractors through an Open Tender for the Construction Works of below listed projects. Qualified firms can participate by registering and submitting all required information through the official eGP System.
1. Construction Works of Meklit Building - Adey Ababa Stadium Road Project (Up to Subbase)
Procurement Reference No.: AACRA-NCB-W-0063-2019-BID-Open
2. Construction Works of Bole Community School - Korea Hospital (R-3 St.km0+000-1+370) Road Project (Up to Subbase)
Procurement Reference No.: AACRA-NCB-W-0066-2019-BID-Open
3. Construction Works of Lebu Mosque-Varnero RA - Hujian Industry Zone - Back of Oromia Condominium Road Project Lot 1; St. km0+000-1+260 (Up to Subbase)
Procurement Reference No.: AACRA-NCB-W-0065-2019-BID-Open
4. Construction Works of Lebu Mosque - Varnero RA -Hudiyan Industry Zone - Back of Oromia Condominium Road Project Lot 2; St. km1+260-2+515 (Up to Subbase)
Procurement Reference No.: AACRA-NCB-W-0067-2019-BID-Open
5. Construction Works of Lebu Mosque - Varner RA - Hujian Industry Zone - Back of Oromia Condominium Road Project Lot 3; St. km2+515-3+770 (Up to Subbase)
Procurement Reference No.: AACRA-NCB-W-0064-2019-BID-Open
6. Construction Works of Lebu Music Sefer - Lebu Mesjid Area - Dombosko (St.km0+000-1+370) Road Project (Up to Sub-base)
Procurement Reference No.: AACRA-NCB-W-0075-2019-BID-Open
7. Construction Works of Sebeta Train Station Area - Furi - Kality - Crown Hotel and Furi Hana Sefera RA - Hana Mariyam Church Junction (Catholic University - Ali Bira RA; St.km3+300-4+600) Road Project (Up to Sub-base)
Procurement Reference No.: AACRA-NCB-W-0074-2019-BID-Open
8. Construction Works of Crown 40/60 Condominium - Sefera Galan Condominium and Yeka Tafo Main Road-2 (km0+000-0+937) Condominium Road Project (Up to Sub-base)
Procurement Reference No.: AACRA-NCB-W-0076-2019-BID-Open
12 Noy, 18:11
According to FIDIC Red book 2017
The Contractor is entitled to an Extension of Time (EOT) under Sub-Clause 8.5 for delay caused by which of the following?
12 Avg, 16:11
According to FIDIC Red book 2017
A Nominated Subcontractor performs defective work. Under Sub-Clause 5.2, how does the Contractor's responsibility for a Nominated Subcontractor generally compare to an ordinary Subcontractor?
12 Avg, 16:02
According to FIDIC Red book 2017
The Engineer instructs the Contractor to keep certain technical information confidential. Which clause governs confidentiality obligations generally?
12 Avg, 15:51
📘 What is FIDIC?
FIDIC = Fédération Internationale Des Ingénieurs-Conseils the global body (est. 1913, Geneva 🇨🇭) behind the world's most widely used construction contract templates.
🌈 The Rainbow Suite:
🔴 Red — Employer-designed construction
🟡 Yellow — Contractor-designed (Plant/Design-Build)
🟣 Silver — EPC/Turnkey
🟢 Green — Short form (small works)
🟠 Gold — Design-Build-Operate
🔵 Blue — Dredging & reclamation
✅ Why it matters:
Used by the World Bank, ADB, EIB & major lenders worldwide because it means fair risk-sharing and a contract language everyone in construction already understands. 🌍🏗
12 Avg, 15:26
+8
After successfully completing the Ras Mekonnen Bridge – Afinchober – Menen – Kechene Corridor Project, Gemshu Beyene Construction PLc have now Started the second Corridor Development Project: #Goro – #ICT Park – #Koye Feche.
The project has now reached the first layer of Dense Bituminous Macadam (DBM)
#Gemshu_Bayene_Construction_PLC
@ethiocivilengineeringdiscoveries
06 Iyul, 16:06
Project-Management-Explained-by-Business-Explained-v4 (1).pdf2.52 MB
18 Iyun, 15:22
Manufacturing process of Portland cement
@ethiocivilengineeringdiscoveries
10 Iyun, 02:56
🏗️🔍 10 Common Concrete Defects Observed on Site & How to Rectify Them
Concrete is one of the most durable construction materials, but poor workmanship, inadequate supervision, improper mix proportions, and poor construction practices can lead to defects that affect both quality and durability.
Understanding these defects is essential for engineers, contractors, supervisors, and construction professionals to ensure long-lasting and safe structures.
📌 In this image, we highlight:
✅ Honeycombing
✅ Cracks
✅ Cold Joints
✅ Segregation
✅ Bleeding
✅ Popouts
✅ Spalling
✅ Rust Stains
✅ Plastic Shrinkage Cracks
✅ Formwork Marks & Surface Irregularities
Along with their common causes and practical rectification methods used on construction sites.
💡 Remember: Quality concrete is not achieved during casting alone >it begins with proper planning, quality materials, skilled workmanship, adequate supervision, correct placement, proper compaction, and effective curing.
@ethiocivilengineeringdiscoveries
09 Iyun, 11:50
👉𝗙𝗜𝗗𝗜𝗖 𝗦𝘁𝗮𝗻𝗱𝗮𝗿𝗱 𝗟𝗲𝘁𝘁𝗲𝗿𝘀 𝗶𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 𝗣𝗿𝗼𝗷𝗲𝗰𝘁𝘀
💫These letters cover various aspects such as notifications, requests for information, change orders, progress reports, and dispute resolution.
𝟭. 𝗞𝗲𝘆 𝗨𝘀𝗲𝘀:
🔹Contractual Notifications: Inform parties about important events like delays and claims.
🔹Requests for Information (RFI): Standardize information requests.
🔹Change Orders: Manage project scope, schedule, or cost changes.
🔹Progress Reports: Update stakeholders on project progress.
🔹Dispute Resolution: Facilitate clear communication to resolve disputes.
𝟮. 𝗛𝗼𝘄 𝘁𝗼 𝗨𝘀𝗲:
🔸️Identify the Appropriate Letter: Choose the right template for your need.
🔸️Follow Procedures: Issue letters according to FIDIC contract procedures.
🔸️Maintain Records: Keep detailed records of all correspondence.
𝟯. 𝗕𝗲𝗻𝗲𝗳𝗶𝘁𝘀:
🔹Consistency: Ensures professional and consistent communication.
🔹Clarity: Prevents misunderstandings and disputes.
🔹Efficiency: Saves time and reduces administrative burdens.
@ethiocivilengineeringdiscoveries
08 Iyun, 00:43
📘 TYPES OF CONSTRUCTION CLAIMS
In construction projects, claims arise when changes, delays, or unexpected issues affect time, cost, or quality. Understanding these claims helps in proper project management and dispute resolution.
🔹 1. Change Order Claims
Claims for extra time or payment due to changes in the original scope of work.
These changes may be requested by the client or discovered during construction.
🔹 2. Delay Claims
Claims for additional time or cost caused by project delays.
Delays may come from the client, contractor, suppliers, weather, or other external factors.
🔹 3. Disruption Claims
Claims due to interruptions in planned work activities, which reduce productivity and increase costs.
🔹 4. Acceleration Claims
Claims for extra costs when a contractor is required to speed up work to meet deadlines after delays not caused by them.
🔹 5. Differing Site Conditions Claims
Claims arising when actual site conditions differ from what was stated in the contract or expected during planning.
🔹 6. Defective Work Claims
Claims related to repairing or replacing work that does not meet required standards or specifications.
🔹 7. Breach of Contract Claims
Claims resulting from failure of either party to meet contractual obligations such as payment, quality, or deadlines.
🔹 8. Termination Claims
Claims that arise when a contract is terminated, either for convenience or due to fault.
🔹 9. Payment Claims
Claims due to non-payment or delayed payment for completed works or supplied materials.
🔹 10. Force Majeure Claims
Claims caused by unexpected events beyond control such as natural disasters, political instability, or emergencies.
🔹 11. Warranty Claims
Claims for defects discovered after project completion during the warranty period.
🔹 12. Misrepresentation Claims
Claims due to false or misleading information that results in extra cost or delay.
🔹 13. Subcontractor Claims
Claims made between subcontractors and main contractors, usually related to payment or scope changes.
🔹 14. Prolongation Claims
Claims for additional cost due to project time extension beyond the original completion date.
📌 Conclusion
Proper understanding and management of construction claims is essential for smooth project delivery, cost control, and maintaining good contractual relationships.
TikTok: @jarraconengineering
Telegram: @ethiocivilengineeringdiscoveries
07 Iyun, 03:21
👉ለግንባታዎች መጓተት ተጠያቂው ማነው?
🚧በኢትዮጵያ የመሠረተ ልማትና የሕንፃዎች ግንባታ በፈጣን ሁኔታ እየተስፋፋ ከመምጣቱ ጋር ተያይዞ፣ መንግሥት እና ባለሀብቶች ትላልቅ ፕሮጀክቶችን ለማስገንባት የሚመድቡት በጀትም የዛኑ ያህል እየጨመረ መጥቷል፡፡
ነገር ግን ለግንባታ የተመደበው በጀት ሳያንስ ወይም ለግንባታ የሚሆን የገንዘብ ዕጥረት ሳይገጥም፣ ግንባታዎች በተያዘላቸው የጊዜ ገደብ ውስጥ ያለመጠናቀቀቸው ጉዳይ እየተለመደ እና አሳሳቢ እየሆነ ነው፡፡
እንደ አለም አቀፍ የፕሮጀክት ማኔጅመንት ኢንስቲቲዩት (IPMI) መረጃ፣ ሁሉም ድርጅቶች የሥራ ሂደት እና የፕሮጀክት ዕቅድን አጣጥመው በመጓዝ የተነደፈውን ፕሮጀክት በተያዘለት ጊዜ እንዳያገባድዱ ከሚያደርጓቸው መንስኤዎች አምስቱ የሚከተሉት ናቸው ይላል፡፡
1⃣ ችግሮችን ቀድሞ አለመረዳት
አብዛኛዎቹ ፕሮጀክቶች ዕቅዳቸው የሚሰናከለው በሥራ ሂደት ወደፊት ሊገጥማቸው የሚችለውን ችግር ቀደም ብለው መረዳት ባለመቻላቸው ነው፡፡ ለዚህ መንስኤ የሚሆነው፣ ፕሮጀክቶቹን በበላይነት በሚመሩት በዋናው ሥራ አስኪያጁ፣ በፕሮጀክት ማናጀሩ እና በቡድን መሪው መካከል ተከታታይ የሆነ እና ወቅቱን የጠበቀ የመረጃ ልውውጥ አለመኖሩ ነው፡፡
2⃣ ግልፅነት የጎደለው የፕሮጀክት ግብ
የፕሮጀክቱ ማናጀር ወይም ሥራ አስኪያጁ፣ ስለፕሮጀክቱ ግብ እና አላማ ግልጽ የሆነ መረጃ እና የሥራ ሂደት መመሪያ አዘጋጅተው ወደ ሥራ ካልገቡ፣ ሁሉም በየፊናቸው ኃላፊነቱን ለመወጣት በሚያደርገው ሩጫ ሥራው ቅንጅት እንዲያጣ እና ሂደቱ እንዲስተጓጎል ያደርጋል፡፡
3⃣ ተግባራዊ ክትትል የጎደለው ውሳኔ
የፕሮጀክት ሥራ አስፈፃሚዎች በግንባታ ቡድን መሪዎች እና በፕሮጀክት ማናጀሮች በተዋረደ የሚቀርብላቸውን ሰነድ እየፈረሙ፣ የዕቃ ግዥ እና የሥራ ቅጥር እንዲፈፀም ከማድረግ ባለፈ፣ በአካል ተገኝተው የግንባታውን ሂደት ስለማይከታተሉ ቅድሚያ የሚሰጣቸውን ጥሬ ቁሶች ወይም የግንባታ ማቴሪያሎችን መረዳት ይሳናቸዋል፡፡ በዚህም የተነሣ የማያስፈልግ ክምችት፣ አላስፈላጊ እጥረት እንዲከሰት እና የፕሮጀክቱ ሂደት እንዲጓተት ያደርጋል፡፡
4⃣ ለግንባታ መጣደፍ
የፕሮጀክት ግንባታውን በየዘርፉ የሚያካሄድ የግንባታ ቡድን ሳያዋቅሩ፣ የፕሮጀክቱን ግንባታ ተጣድፎ መጀመር እና መጣደፍ፣ አስፈላጊውን ባለሙያ እና የገንዘብ አቅርቦት በተፈለገ ጊዜ ለማግኘት ሂደቱን ያስተጓጉላል፡፡
5⃣ የመረጃ ልውውጥ ክፍተት
በፕሮጀክት ግንባታም ሆነ በማንኛውም መስክ ጊዜውን እና ወቅቱን የጠበቀ የመረጃ ልውውጥ ማድረግ ወሳኝ የመሆኑን ጉዳይ ማንም አይዘነጋውም፡፡ ይሁንና በፕሮጀክቱ የሥራ ኃላፊዎች እና የግንባታ ቡድኖች መካከል የሚደረግ የመረጃ ልውውጥ በኢሜይል ወይም በስልክ ግንኘነት የሚካሄድ በመሆኑ፣ መረጃው ለሁሉም ባለድርሻ አካላት ተደራሽ እንዳይሆን እና በእያንዳንዱ የኢ-ሜይል ሳጥን ውስጥ ተቆልፎ እንዲቀር ያደርጋል፡፡ በሥራ ሂደት፣ አንድ አስፈላጊ የሥራ አመራር ወይም ባለሙያ ወደ ፕሮጀክቱ ሲቀላቀልም የሚያገኘው መረጃ የተበታተነ እና ቅንጅነት የሌለው ስለሚሆን በፍጥነት ወደ ሥራው መቀላቀል ይሳነዋል፡፡ የነዚህ ድምር ውጤት ደግሞ ፕሮጀክቱ በተያዘለት የጊዜ ገደብ እንዳይጠናቀቅ ያደርገዋል፡፡
ይቀጥላል ....
@ethiocivilengineeringdiscoveries
04 Iyun, 10:42
Construction Project Management Practitioners this is for you:-
📚📚📚 Construction Project Manager's Pocket Book.
@ethiocivilengineeringdiscoveries
@jarraconengineering
27 May, 11:38
📚 Structural Engineer's Pocket book
@ethiocivilengineeringdiscoveries
24 May, 07:03
Can you try this Qn?
A trapezoidal channel is 10.0 m wide and has a side slope of 1.5 horizontal to 1 vertical. The bed slope is 0.0003. The channel is lined with smooth concrete of n = 0.012. Compute the mean velocity and discharge for a depth of flow of 3. O m?
@ethiocivilengineeringdiscoveries
24 May, 02:10
🗺️ Different Types of Maps
Maps are important tools used in engineering, surveying, planning, defence, and land management. Different maps serve different purposes. 📍
🔹 1️⃣ Topographical Map
Shows natural and man-made features such as:
🏞️ Hills & valleys
🌊 Rivers
🏘️ Villages & towns
🌳 Forests
✅ Used for land study and planning.
🔹 2️⃣ Cadastral Map
Shows property details such as:
🏠 House boundaries
🌾 Land plots
📏 Property limits
✅ Used for land ownership and legal purposes.
🔹 3️⃣ Engineering Map
Shows engineering projects including:
🛣️ Roads
🚆 Railways
💧 Reservoirs
🚜 Irrigation canals
✅ Used in construction and infrastructure development.
🔹 4️⃣ Geological Map
Shows:
⛏️ Rock types
🪨 Soil layers
💎 Underground resources
✅ Used in mining and foundation investigation.
🔹 5️⃣ Contour Map
Uses contour lines to show ground elevation and slope. 📈
✅ Helps to:
Determine reservoir capacity
Find suitable routes for roads & railways
🔹 6️⃣ Military Map
Shows:
🛣️ Roads
🚆 Railway networks
📍 Strategic defence locations
✅ Used for military planning and national defence.
🔹 7️⃣ Archaeological Map
Shows areas where:
🏺 Ancient relics
🏛️ Historical sites
🗿 Archaeological remains exist
✅ Used for historical and cultural studies.
🏗️ Jarracon Engineering
📲 TikTok: @jarraconengineering
📢 Telegram: @ethiocivilengineeringdiscoveries
23 May, 06:43