For most of concrete mixes, over-
vibration creates the problem of
segregation in which the denser
aggregates settle to the bottom
while the lighter cement paste
tends to move upwards. ... If
concrete is placed in a single lift
for road works, the resistance to
abrasion is poor for the laitance
surface of the carriageway.
Steps Involved In Concreting
Process
Concrete is a construction material made from a
mixture of cement, aggregate (sand or gravel), water
and sometimes admixtures in required proportions.
Following are the major steps which involved in
concreting process:
Steps In Concreting:
Batching:
The process of measuring different concrete
materials such as cement, coarse aggregate, sand,
water for the making of concrete is known as
batching. Batching can be done in two different
ways.
1. Volume Batching
2. Weight Batching.
In volume batching the measurements of concrete
materials are taken by volume & On the other hand
the measurements are taken by weight in weight
batching.
Mixing:
In this process, all the materials are thoroughly
mixed in required proportions until the paste shows
uniform color and consistency. Hand mixing and
machine mixing are the two different methods of
mixing.
Note: To achieve optimum quality the materials
should be mixed first in dry condition and then in
wet condition.
Transportation:
When the mixing is done properly the freshly made
concrete is then transported to the construction
site, this process is known as transportation. After
that, the concrete is correctly placed on the
formworks. Concrete can be transported to the site
location in two ways
1. Manual Transportation.
2. Mechanical Transportation.
Compaction:
Compaction is the process in which the air bubbles
are eliminated from the freshly placed concrete. It is
required to increase the ultimate strength of
concrete by enhancing the bond with reinforcement.
Curing:
Curing is the process in which the concrete keeps its
moisture for a certain time period to complete the
hydration process. Curing should be done properly to
increase the strength of concrete.
A lintel or lintol is a structural horizontal block that spans
the space or opening between two vertical supports. It
can be a decorative architectural element, or a combined
ornamented structural item. It is often found over portals ,
doors , windows and fireplaces. In the case of windows, the
bottom span is instead referred to as a sill , but, unlike a
lintel, does not serve to bear a load to ensure the integrity
of the wall. Modern day lintels are made using prestressed
concrete and are also referred to as beams in beam and
block slabs or ribs in rib and block slabs. These prestressed
concrete lintels and blocks are components that are packed
together and propped to form a suspended floor concrete
slab.
pothesized structural
relationship between one construct and another. This shows
the cause and effect relationship. Each hypothesized
relationship uses one degree of freedom. The model can be
recursive or non-recursive.
Examine the structural model validity: In the last step, a
researcher examines the structural model validity. A model
is considered a good fit if the value of the chi-square test is
insignificant, and at least one incremental fit index (like CFI,
GFI, TLI, AGFI, etc.) and one badness of fit index (like RMR,
RMSEA, SRMR, etc.) meet the predetermined criteria.