Talcher Super Thermal Powerstation is a coal power plant operated by NTPC with a total output of 3,000 MW
+2
Rihand Thermal Power Station is a coal power plant operated by NTPC with a total output of 3,000 MW
+1
Tiroda Thermal Power Project is a coal power plant operated by Adani Power with a total output of 3,300 MW
+3
Barh Super Thermal Power Station is a coal power plant operated by NTPC with a total output of 3,300 MW
+1
Tamnar Power Station is a coal power plant operated by Jindal Power Limited with a total output of 3,400 MW
+1
Sasan UMPP is a coal power plant operated by Reliance with a total output of 3,960 MW
Yadadri Thermal Power Plant is a coal power plant operated by Telangana Power Generation with a total output of 4,000 MW
+1
Name: Mundra Thermal Powerplant
Operator: Adani Power
plant:output:electricity: 4620 MW
Mundra Thermal Powerplant is a coal power plant operated by Adani Power with a total output of 4,620 MW.+1
Vindhyachal is a coal power plant operated by NTPC with a total output of 4,760 MW