Best part I took from reading The Phoenix Project by Gene Kim, Kevin Behr, and George Spafford:
Unplanned work is what prevents you from doing what matters most. Like matter and antimatter, in the presence of unplanned work, all planned work ignites with incandescent fury, incinerating everything around it.
Unlike the other categories of work, unplanned work is recovery work, which almost always takes you away from your goals. That’s why it’s so important to know where your unplanned work is coming from.
In most organizations, there are very few resources—whether it’s men, machines, or materials—that dictate the output of the entire system. We call this the constraint, or bottleneck. Whatever term you use, until you create a trusted system to manage the flow of work to the constraint, that constraint is constantly wasted. This means that the constraint is likely being drastically underutilized.
'You’re not delivering the full capacity available to the business,' and as a result, you’re likely not addressing technical debt. This causes an increase in unplanned work over time, further derailing productivity.
There are five focusing steps, which Goldratt describes in The Goal:
1. Identify the constraint: Find the resource (machine, person, material, etc.) that is limiting the system’s output.
2. Exploit the constraint: Make the best possible use of the constraint without any major investments—maximize its efficiency.
3. Subordinate everything to the constraint: Adjust all other processes to support and align with the needs of the constraint, ensuring it's not overloaded.
4. Elevate the constraint: If necessary, take steps to increase the capacity of the constraint, such as adding resources or making improvements.
5. Repeat the process: After addressing the current constraint, find the next one and repeat the cycle to continuously improve the system. Avoid inertia, meaning don’t let improvements stop