Patent Defects in Construction:-🏗Patent defects are defects that are completely visible to the naked eye—for example, faulty pipes, water stains on the walls, wall cracks, etc. A practical completion certificate is a contractual document that allows the client to take possession of and use a building. All the defects apparent before the practical completion of the project should be rectified before issuing the certificate of practical completion.
Master Schedule vs Milestone Schedule
Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.
Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.
In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.
In this article, we will discuss important time management concepts and their key differences.
For better understanding, let’s take a glance at the definitions.
Master Schedule, Milestone Schedule, Project Schedule
Before to start, let’s discuss the basic terms used in time management.
Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”
∴Milestones have a fixed date but no duration.
Below are some examples of milestones in a project
Project Start and End
Start and Completion of each phase and/or discipline
Kick of Meeting
Site Handover
Sign of Contract
Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.
A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.
Schedules are typically created at the beginning of a project and updated and reported regularly.
Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;
Creating and developing the Work Breakdown Structure (WBS) of the project
Defining work packages and major project deliverables
Defining the tasks
Defining relationships
Defining and assigning resources
Analyzing the critical path of the project
Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.
Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.
Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.
Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.
The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.
1. Milestone Schedule
A Milestone Schedule is a summary level schedule, which identifies the major project milestones.
Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.
Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.
2. Master Schedule & Why is a Master Schedule Important?
A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.
Master Schedule is a summary level project schedule which includes the major p
1.Advance security
ስራ ተቋራጩ ለሚወስደው የቅድም ክፍያ ገንዘብ በሚከፈለው የገንዘብ መጠን ልክ የሚያሲዘው የባንክ ዋስትና
ቦንድ ነው።
እውነተኛነቱ በተረጋገጠ ቼክ፣ ያልተገደበ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ማስያዝ ይኖርበታል።
ስራ ተቋራጩ የወሰደውን ቅድመ ክፍያ ከፍሎ እስኪጨርስ ያስያዘው ዋስትና ግዜው ማለቅ(Expire) አይችልም።
ከአንድ ወር ቀደም ብሎ የዋስትና ቀነ ገደቡ ከማለፉ በፊት ከአማካሪ በሚፃፍለት ደብዳቤ መሰረት ሊታደስ ይገባል።
ነገር ግን ስራ ተቋራጩ ያስያዘውን ዋስትና ቀነ ገደቡ አልፎ ሳያሳድስ ቢቀር ቀሪ ያልተከፈለ ቅድመ ክፍያ ሙሉ ለሙሉ ከሚቀጥለው ክፍያ ቅፅ ላይ ተቀናሽ ይደረጋል።
ስራ ተቋራጩ ያስያዘውን ዋስትና ቅድመ ክፍያ ገንዘብ ከፍሎ እንደጨረሰ ተመላሽ ይደረግለታል።
የተለየ የቅድመ ክፍያ እና የዋስትና አከፋፈል አካሔድ ለፕሮጀክቱ የተዘጋጀው ውል/special condition of contract/ ይችላል።
2. Performance Security
*ስራ ተቋራጩ ውል ተቀብሎ ተፈፃሚ ማድረግ የሚችልበትን ለብቃት ማረጋገጫ የሚያሲዘው ዋስትና ነው።
ውል በተፈራረመ በአስራ አምስት ቀናት ውስጥ (15) ውሉ የሚያዘውን መጠን ዋስትና ያቀርባል ።
ዋስትናው ስራ ተቋራጩ በተገቢው መንገድ ውሉን ተፈፃሚ ሳያደርግ ቢቀር ለውል ሰጪ (ባለቤት) እንደ ካሳ ክፍያ ይሆናል።
እውነተኛነቱ በተረጋገጠ ቼክ፣ የባንክ ዋስትና ወይም ከህጋዊ ጥቃቅን ማይክሮ ፋይናንስ የተፃፈ የዋስትና ደብዳቤ ውሉ ላይ
በተቀመጠው ፎርማት መሰረት ማስያዝ ይኖርበታል።
ይህ ዋስትና ሳይቀርብ ምንም አይነት ክፍይ ተፈፃሚ ሊደረግ
አይገባም።
ስራው ተጠናቆ እስኪያልቅ ይህ ዋስተና ተገቢ እና ቀነ ገደቡ ሳያልቅ መታደስ ይጠበቅበታል። ስራው ተጠናቆ ርክክብ እንደተፈፀመ በ ሀያ ስምንት(28) ቀናት ውስጥ ለስራ ተቋራጩ ሊመለስለት ይገባል
✅የዛሬ ጉርሻ💫🏗የአርማታ ብረት በሜትር ምን ያህል ይመዝናል? ለኮንስትራክሽን ግብዓት የምንጠቀማቸው የአርማታ ብረት በቅርፃቸው በሁለት ይከፈላሉ:- 1. ልሙጥ ብረት(Mild Steel or plain rebar) 2. ባለ ክርክር/አርማታ ብረት(Deformed steel rebar) በጥንካሬ ደረጃ ደግሞ በስፋት Grade 60 እና Grade 40 በመባል ይለያሉ ይህም ውጥረታዊ ሀይል/tensile strength/በመቋቋም አቅማቸው ነው። ✅Grade 40=275.79MPa yield strength ሲኖረው ✅Grade 60=413.68MPa yield strength ይኖረዋል ተጨማሪ ይጠቅማል የምትሉት👇 መልዕክቶን ለእኛ ለማጋራት🔺🖥
ቴሌግራም ላይ ከስር ባለው ሊንክ: በ t.me/consitesolutionBot ሀሳባችሁን ብትልኩልን፣ ይደርሰናል! እኛም ገምግመን መልሰን እናደርሳለን🔺 በስራ ላይ~ ሸጋ ቀን!🤚 @con_site
+1
The difference between footing and foundation🏗🚧Footings and foundations are both essential components of a building's structural system, but they serve different purposes and have distinct characteristics. Here’s a breakdown of their differences: 🌟1. Definition: ✅️Footing: A footing is a specific part of the foundation that directly supports the weight of the structure. It is typically a concrete slab or a series of concrete blocks that distribute the load over a larger area to prevent settling. ✅️Foundation: The foundation is the entire system that supports a building, including footings, walls, and any other structural elements below ground level. It transfers the load of the building to the soil. 🌟2. Function: ✅️Footing: Its primary function is to provide stability by spreading the weight of the structure over a larger area, reducing pressure on the soil beneath. ✅️Foundation: It serves to anchor the building to the ground, resist lateral forces (like wind and earthquakes), and prevent moisture from entering the structure. 🌟3. Location: ✅️Footing: Footings are located at the base of walls or columns, usually below the frost line in colder climates. ✅️Foundation: The foundation encompasses all elements below ground level, including footings, foundation walls, and any other structural components. 🌟4. Types: ✅️Footing: Common types include spread footings, strip footings, and pad footings. ✅️Foundation: Types of foundations include shallow foundations (like spread footings) and deep foundations (like piles or drilled shafts). 🌟5. Construction Material: 🔸Both footings and foundations are typically made of concrete, but the specific design and reinforcement may vary based on their functions and loads.
Summary🚧In essence, the footing is a component of the foundation system, specifically designed to support and distribute loads from the structure above. The foundation as a whole includes all components that provide stability and support for a building.
+1
👍የዛሬ ጉርሻ⭐️🏗የአርማታ ብረት በሜትር ምን ያህል ይመዝናል? ለኮንስትራክሽን ግብዓት የምንጠቀማቸው የአርማታ ብረት በቅርፃቸው በሁለት ይከፈላሉ:- 1. ልሙጥ ብረት(Mild Steel or plain rebar) 2. ባለ ክርክር/አርማታ ብረት(Deformed steel rebar) በጥንካሬ ደረጃ ደግሞ በስፋት Grade 60 እና Grade 40 በመባል ይለያሉ ይህም ውጥረታዊ ሀይል/tensile strength/በመቋቋም አቅማቸው ነው። ✅Grade 40=275.79MPa yield strength ሲኖረው ✅Grade 60=413.68MPa yield strength ይኖረዋል
በኮንስትራክሽን ውል አሰሪው የተቋራጩን ክፍያ አዘግይቶ መክፈል ጉዳይ/Delay payment/ 🚧የኮንስትራክሽ ውል መሰረታዊ ባህሪው ሲታይ በዋናነት አሰሪና ተቋራጭን በተዋዋይነት የሚይዝ ሲሆን ጉልህ የሆነው ግዴታቸው ሲታይ ደግሞ ተቋራጩ በውሉና ዲዛይኑ/ስፔስፊኬሽኑ መሰረት ግንባታውን የማከናወን ሀላፊነት የሚኖርበት ሲሆን ክፍያ የመክፈል ጉዳይ ደግሞ ለአሰሪው ዋናውና ትልቁ ግዴታው ነው፡፡የፍትሀብሄር ህግ አንቀጽ 2610፣3019እና 3020 እንዲሁም 3244 ተገናዝቦ ሲታይ ይሄን ሁኔታ ያስገነዝባል፡፡ የፍትሀብሄር ህግ አንቀጽ 3020(1) ላይ "ሁለቱ ወገን ተዋዋዮች ስለሚፈጽሙት ስራዎችና ስለዋጋው ካልተስማሙ በቀር የተቋራጭነት ውል አለ አይባልም" በሚል የተደነገገው በኮንስትራክሽን ውል ለተቋራጩ የሚከፈለው ክፍያ ጉዳይ የውሉ መሰረታዊ ነጥብ መሆኑን የሚጠቁም ነው፡፡ ስለክፍያ አይነቶች የህጉን ጉዳይ ወደፊት በሌላ ጽሁፍ የምናየው ይሆናል፡፡ አሰሪው ለተቋራጩ ክፍያ የመክፈሉን ሁኔታ ያለበቂ ምክንያት ማዘግየት አይችልም፡፡ አማካሪ መሀንዲሱ በተለይ ከተቋራጩ የክፍያ ጥያቄ በቀረበለት ጊዜ የማረጋገጥና የማጽደቁን ስራ በ7(ሰባት) ቀናት ውስጥ የማጠናቀቅ ግዴታ አለበት፡፡(የመመሪያው አንቀጽ 28.5(d) አሰሪው መስሪያ ቤት ደግሞ በአማካሪ መሀንዲሱ የጸደቀ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያ የመፈጸም ግዴታ አለበት፡፡ (የመመሪያው አንቀጽ 28.5(e) አማካሪ መሀንዲሱ በተቋራጩ የቀረበውን የክፍያ ጥያቄ በሰባት ቀናት ውስጥ የማረጋገጥና የማጽደቅ ስራ ባይፈጽም ምን ውጤት ይኖረዋል? • በዚህ ረገድ የመመሪያው አንቀጽ አንቀጽ 28.5(f) ግልጽ ምላሽ አስቀምጧል፡፡ • ይሄውም ተቋራጩ በዚህ ምክንያት ከአሰሪው ላይ ተጨማሪ ክፍያ/additional payment/ የጠየቀ እንደሆነ አማካሪ መሀንዲሱ ይህን ተጨማሪ ክፍያ የመሸፈን ግዴታ ይኖርበታል፡፡ •ሆኖም ግን አማካሪ መሀንዲሱ ለሚሰጠው አገልግሎት ከሚከፈለው ክፍያ በላይ የሆነ ክፍያ ለመክፈል ሀላፊነት አይኖርበትም፡፡ •በዚህ ረገድ የፍትሀብሄር ህግ አንቀጽ 2636 የአማካሪ መሀንዲሱን የእውቀት ስራ ውል ግዴታ ይደነግጋል፡፡ይሄውም አማካሪው "የኪነ ጥበብን ደንቦች በማፍረስ ጥፋት ጥፋት ካላደረገ በቀር በአሰሪው በኩል ስራ ተቋራጩን ሀላፊነት አይነካውም" በሚል ተቀምጧል፡፡(2636(2)) እንደዚሁም አማካሪው ሳይሰራ ከመቅረቱ የተነሳ ወይም በአሰሪው ላይ ጉዳትን የሚያመጣ ስራ ያደረገ እንደሆነ አጥፊ ነው ለመባል እንደሚችል የፍትሀብሄር ህግ አንቀጽ 2636(3) ይደነግጋል፡፡ ስለዚህ አማካሪው ክፍያ የማረጋገጥ እና የማጽደቅ ስራውን በህጉ በተቀመጠው የጊዜ ገደብ ባለማከናወኑ አሰሪው ተጨማሪ ክፍያ እንዲከፍል በተቋራጩ የተጠየቀ እንደሆነ አማካሪው አጥፊ ነው ሊባል ያስችለዋል ማለት ነው፡፡ አሰሪው በአማካሪው የጸደቀው የክፍያ ሰርተፍኬት በደረሰው በ14 ቀናት ውስጥ ለተቋራጩ ክፍያ ባይፈጽም ምን ውጤት ይኖረዋል? •አሰሪው ያለበቂ ምክንያት ክፍያ ያዘገየ እንደሆነ ለተቋራጩ ተጨማሪ ክፍያ/additional payment/ ለመክፈል ሀላፊነት እንደሚኖርበት የፌዴራል የግዥ መመሪያ/Federal public procurement directive/ አንቀጽ 28.5(g) ይደነግጋል፡፡ • ተጨማሪ ክፍያ ሲባልስ ምንን ያጠቃልላል? የሚለው ሲታይ በዋናነት ወለድ የመክፈል ሀላፊነትን የሚመለከት ይሆናል፡፡በዚህ ረገድ የፍትሀብሄር ህግ አንቀጽ 3268 ተቋራጩ መክፈልን በማዘግየት የሚታሰበውን ወለድ እንዲያገኝ መብት ይሰጠዋል፡፡የወለዱ መጠንም በውል ያልተወሰነ የሆነ እንደሆነ በአንቀጽ 1751 መሰረት ህጋዊ ወለድ በአመት 9(ዘጠኝ) በመቶ ሆኖ የሚሰላ ይሆናል፡፡ • ሌላው እዚህ ላይ ሊታወቅ የሚገባው ነጥብ ተዋዋዮች በውላቸው ላይ ክፍያን ማዘግየት የሚኖረውን ውጤት አስመልክቶ የቅጣት ስምምነት/penality clause/ ያካተቱ ከሆነ የፍትሀብሄር ህጉ አንቀጽ 1889 እና ተከታዮቹ ድንጋጌ እውቅና ስለሚሰጠው እና በአንቀጽ 1731 መሰረት ውል በተዋዋዮች መካከል እንደ ህግ ስለሚቆጠር ተፈጻሚነት ይኖረዋል፡፡ • አንዳንድ ክልሎችም በዚህ ረገድ በግዥ መመሪያቸው ላይ ዝርዝር ውጤቱን ያስቀምጣሉ፡፡ • አሰሪው ክፍያ በወቅቱ ባለመፈጸሙ ምክንያት ከወለድ ባለፈ ሌላም ጉዳት የደረሰበት ተቋራጭስ ከጉዳቱ ጋር እኩል የሆነ ኪሳራ ሊከፈለው አይገባም ወይ? የሚል ጥያቄም ሊነሳ ይችላል፡፡ምክንያቱም የፍትሀብሄር ህግ አንቀጽ 2091 እና 1790(2) ለደረሰው ጉዳት ሀላፊ መሆኑ በህግ የታወቀ ሰው የሚከፍለው የጉዳት ካሳ ሀላፊነቱን ያመጣው ጉዳይ በተበዳዩ ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን አለበት በሚል በግልጽ ይደነግጋል፡፡ በአጠቃላይ አሰሪው በማናቸውም ምክንያት የተቋራጩን ክፍያ በሚያዘገይበት ጊዜ ተቋራጩን ለውድቀት የማጋለጥ እድሉ የሰፋ ነው፡፡ምክንያቱም በሀገራችን አብዛኛው ተቋራጭ ድርጅት የፋይናንሽያል ማኔጅመንት ስርአት የለውም፡፡ተቋራጮቻችን የገንዘብ አቅማቸውም ደካማ ነው፡፡አብዛኛው ተቋራጭ ለአንዱ ፕሮጀክት የሚወስደውን የቅድሚያ ክፍያ ሌላ ፕሮጀክት ላይ ይጠቀምበታል፡፡በዚህ ምክንያት አንድ ተቋራጭ ሲከስር ብዙ ሰራተኛ እንደሚበተን መገንዘብ ያስፈልጋል፡፡ስለዚህ በአሰሪዎች በኩል ተቋራጮች የሰሩበትን ክፍያ በወቅቱ እና በተሰራው ስራ ልክ አንዲከፈላቸው ለማድረግ እና በህጉ የተቀመጠው የክፍያ የጊዜ ገደብ እንዲከበር ጠንከር ያለ አቋም ወስዶ መስራት ይጠበቅበታል ተጨማሪ ይጠቅማል የምትሉት👇 መልዕክቶን ለእኛ ለማጋራት🔺🖥
ቴሌግራም ላይ ከስር ባለው ሊንክ: በ t.me/consitesolutionBot ሀሳባችሁን ብትልኩልን፣ ይደርሰናል! እኛም ገምግመን መልሰን እናደርሳለን💫 መልካም~ ምሽት!🤚 @con_site
በኮንስትራክሽን ውል አሰሪው የተቋራጩን ክፍያ አዘግይቶ መክፈል ጉዳይ/Delay payment/ 🚧የኮንስትራክሽ ውል መሰረታዊ ባህሪው ሲታይ በዋናነት አሰሪና ተቋራጭን በተዋዋይነት የሚይዝ ሲሆን ጉልህ የሆነው ግዴታቸው ሲታይ ደግሞ ተቋራጩ በውሉና ዲዛይኑ/ስፔስፊኬሽኑ መሰረት ግንባታውን የማከናወን ሀላፊነት የሚኖርበት ሲሆን ክፍያ የመክፈል ጉዳይ ደግሞ ለአሰሪው ዋናውና ትልቁ ግዴታው ነው፡፡የፍትሀብሄር ህግ አንቀጽ 2610፣3019እና 3020 እንዲሁም 3244 ተገናዝቦ ሲታይ ይሄን ሁኔታ ያስገነዝባል፡፡ የፍትሀብሄር ህግ አንቀጽ 3020(1) ላይ "ሁለቱ ወገን ተዋዋዮች ስለሚፈጽሙት ስራዎችና ስለዋጋው ካልተስማሙ በቀር የተቋራጭነት ውል አለ አይባልም" በሚል የተደነገገው በኮንስትራክሽን ውል ለተቋራጩ የሚከፈለው ክፍያ ጉዳይ የውሉ መሰረታዊ ነጥብ መሆኑን የሚጠቁም ነው፡፡ ስለክፍያ አይነቶች የህጉን ጉዳይ ወደፊት በሌላ ጽሁፍ የምናየው ይሆናል፡፡ አሰሪው ለተቋራጩ ክፍያ የመክፈሉን ሁኔታ ያለበቂ ምክንያት ማዘግየት አይችልም፡፡ አማካሪ መሀንዲሱ በተለይ ከተቋራጩ የክፍያ ጥያቄ በቀረበለት ጊዜ የማረጋገጥና የማጽደቁን ስራ በ7(ሰባት) ቀናት ውስጥ የማጠናቀቅ ግዴታ አለበት፡፡(የመመሪያው አንቀጽ 28.5(d) አሰሪው መስሪያ ቤት ደግሞ በአማካሪ መሀንዲሱ የጸደቀ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያ የመፈጸም ግዴታ አለበት፡፡ (የመመሪያው አንቀጽ 28.5(e) አማካሪ መሀንዲሱ በተቋራጩ የቀረበውን የክፍያ ጥያቄ በሰባት ቀናት ውስጥ የማረጋገጥና የማጽደቅ ስራ ባይፈጽም ምን ውጤት ይኖረዋል? • በዚህ ረገድ የመመሪያው አንቀጽ አንቀጽ 28.5(f) ግልጽ ምላሽ አስቀምጧል፡፡ • ይሄውም ተቋራጩ በዚህ ምክንያት ከአሰሪው ላይ ተጨማሪ ክፍያ/additional payment/ የጠየቀ እንደሆነ አማካሪ መሀንዲሱ ይህን ተጨማሪ ክፍያ የመሸፈን ግዴታ ይኖርበታል፡፡ •ሆኖም ግን አማካሪ መሀንዲሱ ለሚሰጠው አገልግሎት ከሚከፈለው ክፍያ በላይ የሆነ ክፍያ ለመክፈል ሀላፊነት አይኖርበትም፡፡ •በዚህ ረገድ የፍትሀብሄር ህግ አንቀጽ 2636 የአማካሪ መሀንዲሱን የእውቀት ስራ ውል ግዴታ ይደነግጋል፡፡ይሄውም አማካሪው "የኪነ ጥበብን ደንቦች በማፍረስ ጥፋት ጥፋት ካላደረገ በቀር በአሰሪው በኩል ስራ ተቋራጩን ሀላፊነት አይነካውም" በሚል ተቀምጧል፡፡(2636(2)) እንደዚሁም አማካሪው ሳይሰራ ከመቅረቱ የተነሳ ወይም በአሰሪው ላይ ጉዳትን የሚያመጣ ስራ ያደረገ እንደሆነ አጥፊ ነው ለመባል እንደሚችል የፍትሀብሄር ህግ አንቀጽ 2636(3) ይደነግጋል፡፡ ስለዚህ አማካሪው ክፍያ የማረጋገጥ እና የማጽደቅ ስራውን በህጉ በተቀመጠው የጊዜ ገደብ ባለማከናወኑ አሰሪው ተጨማሪ ክፍያ እንዲከፍል በተቋራጩ የተጠየቀ እንደሆነ አማካሪው አጥፊ ነው ሊባል ያስችለዋል ማለት ነው፡፡ አሰሪው በአማካሪው የጸደቀው የክፍያ ሰርተፍኬት በደረሰው በ14 ቀናት ውስጥ ለተቋራጩ ክፍያ ባይፈጽም ምን ውጤት ይኖረዋል? •አሰሪው ያለበቂ ምክንያት ክፍያ ያዘገየ እንደሆነ ለተቋራጩ ተጨማሪ ክፍያ/additional payment/ ለመክፈል ሀላፊነት እንደሚኖርበት የፌዴራል የግዥ መመሪያ/Federal public procurement directive/ አንቀጽ 28.5(g) ይደነግጋል፡፡ • ተጨማሪ ክፍያ ሲባልስ ምንን ያጠቃልላል? የሚለው ሲታይ በዋናነት ወለድ የመክፈል ሀላፊነትን የሚመለከት ይሆናል፡፡በዚህ ረገድ የፍትሀብሄር ህግ አንቀጽ 3268 ተቋራጩ መክፈልን በማዘግየት የሚታሰበውን ወለድ እንዲያገኝ መብት ይሰጠዋል፡፡የወለዱ መጠንም በውል ያልተወሰነ የሆነ እንደሆነ በአንቀጽ 1751 መሰረት ህጋዊ ወለድ በአመት 9(ዘጠኝ) በመቶ ሆኖ የሚሰላ ይሆናል፡፡ • ሌላው እዚህ ላይ ሊታወቅ የሚገባው ነጥብ ተዋዋዮች በውላቸው ላይ ክፍያን ማዘግየት የሚኖረውን ውጤት አስመልክቶ የቅጣት ስምምነት/penality clause/ ያካተቱ ከሆነ የፍትሀብሄር ህጉ አንቀጽ 1889 እና ተከታዮቹ ድንጋጌ እውቅና ስለሚሰጠው እና በአንቀጽ 1731 መሰረት ውል በተዋዋዮች መካከል እንደ ህግ ስለሚቆጠር ተፈጻሚነት ይኖረዋል፡፡ • አንዳንድ ክልሎችም በዚህ ረገድ በግዥ መመሪያቸው ላይ ዝርዝር ውጤቱን ያስቀምጣሉ፡፡ • አሰሪው ክፍያ በወቅቱ ባለመፈጸሙ ምክንያት ከወለድ ባለፈ ሌላም ጉዳት የደረሰበት ተቋራጭስ ከጉዳቱ ጋር እኩል የሆነ ኪሳራ ሊከፈለው አይገባም ወይ? የሚል ጥያቄም ሊነሳ ይችላል፡፡ምክንያቱም የፍትሀብሄር ህግ አንቀጽ 2091 እና 1790(2) ለደረሰው ጉዳት ሀላፊ መሆኑ በህግ የታወቀ ሰው የሚከፍለው የጉዳት ካሳ ሀላፊነቱን ያመጣው ጉዳይ በተበዳዩ ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን አለበት በሚል በግልጽ ይደነግጋል፡፡ በአጠቃላይ አሰሪው በማናቸውም ምክንያት የተቋራጩን ክፍያ በሚያዘገይበት ጊዜ ተቋራጩን ለውድቀት የማጋለጥ እድሉ የሰፋ ነው፡፡ምክንያቱም በሀገራችን አብዛኛው ተቋራጭ ድርጅት የፋይናንሽያል ማኔጅመንት ስርአት የለውም፡፡ተቋራጮቻችን የገንዘብ አቅማቸውም ደካማ ነው፡፡አብዛኛው ተቋራጭ ለአንዱ ፕሮጀክት የሚወስደውን የቅድሚያ ክፍያ ሌላ ፕሮጀክት ላይ ይጠቀምበታል፡፡በዚህ ምክንያት አንድ ተቋራጭ ሲከስር ብዙ ሰራተኛ እንደሚበተን መገንዘብ ያስፈልጋል፡፡ስለዚህ በአሰሪዎች በኩል ተቋራጮች የሰሩበትን ክፍያ በወቅቱ እና በተሰራው ስራ ልክ አንዲከፈላቸው ለማድረግ እና በህጉ የተቀመጠው የክፍያ የጊዜ ገደብ እንዲከበር ጠንከር ያለ አቋም ወስዶ መስራት ይጠበቅበታል
🤚 Have a nice day!🚧
No14.🔺 equation ❓
In a project schedule, which of these choices comes first?
🤚Have a nice day!
No14.🔺equation❓
In a project schedule, which of the these choices comes first? A. construction administration
🔹Bad Construction🏗✅️Reasons for slab leaks: Slab leaks can be caused by poor quality or damaged pipes as well as improper installation. Leaks and bursts can happen when there are bends, kinks, or poor fittings. ✅️Soil Shifts: Many factors can cause soil to shift, such as earthquakes and under construction the case of soil movement, pipes and connections bend and rub together, damaging them. ✅️Poor Water Quality: Your pipes can be damaged by poor water quality, such as hard water.
🤚Cool Night🚧
No13.🔺equation❓
Which one of the following schedules shows the specific activities necessary to complete an activity or work package?
#ኮሪደር_ልማት_የሠሩ_እጆች_ድምር_ውጤት
ጥቅምት 9 ቀን 2017 ዓ ም አዲስ አበባ