Mppsc current affairs
前往频道在 Telegram
📈 Telegram 频道 Mppsc current affairs 的分析概览
频道 Mppsc current affairs (@mppsc_current) 英语 语言赛道中的 是活跃参与者。目前社区聚集了 24 528 名订阅者,在 教育 类别中位列第 8 071,并在 印度 地区排名第 17 498 位。
📊 受众指标与增长动态
自 невідомо 创建以来,项目保持高速增长,吸引了 24 528 名订阅者。
根据 22 六月, 2026 的最新数据,频道保持稳定运转。过去 30 天订阅人数变化为 -367,过去 24 小时变化为 -12,整体触达仍然可观。
- 认证状态: 未认证
- 互动率 (ER): 平均受众互动率为 2.41%。内容发布后 24 小时内通常能获得 0.49% 的反应,占订阅者总量。
- 帖子覆盖: 每篇帖子平均可获得 591 次浏览,首日通常累积 121 次浏览。
- 互动与反馈: 受众积极参与,单帖平均反应数为 0。
- 主题关注点: 内容集中在 भारत, राष्ट्रीय, उद्देश्य, जनवरी, crore 等核心主题上。
📝 描述与内容策略
尚未提供频道描述。
凭借高频更新(最新数据采集于 23 六月, 2026),频道始终保持新鲜度与高覆盖。分析显示受众积极互动,使其成为 教育 类别中的关键影响点。
24 528
订阅者
-1224 小时
-667 天
-36730 天
帖子存档
24 528
🔆Goma:
✅The M23 rebel group’s recent offensive in the Democratic Republic of Congo has seized key areas in Goma, eastern DRC, drawing global attention.
Location:
✅Goma is the capital of North Kivu Province in the eastern Democratic Republic of Congo.
✅It is situated on the northern shore of Lake Kivu, near the borders with Rwanda and Uganda.
📍The Democratic Republic of Congo (DRC):
✅Location: The DRC is located in Central Africa and is the second-largest country in Africa by land area.
✅It shares borders with nine countries: Republic of the Congo, Central African Republic, South Sudan, Uganda, Rwanda, Burundi, Tanzania, Zambia, and Angola.
✅The M23 (March 23 Movement) is a rebel group primarily composed of ethnic Tutsis.
#Places_in_news
Join @Mapping_prelims_mains
24 528
🔆Upper Karnali Hydro-electric Project:
✅It is a 900 MW run-of-the-river hydropower project being developed on the Karnali River in Nepal.
✅The project will supply power to Nepal, India, and Bangladesh for a contracted period of 25 years.
✅The project is being developed by GMR Upper Karnali Hydro Power Limited (GUKHL), a subsidiary of GMR Group India, Nepal Electricity Authority (NEA), and SJVN Green Energy.
✅The project is being developed on a build-own-operate-transfer (BOOT) basis.
✅GUKHL and NEA are currently owning the project, having ownership stakes of 73% and 27%, respectively.
✅It is estimated to generate 3,466 million units of electricity while offsetting approximately two million tons of greenhouse gas emissions a year.
✅It will feature a concrete gravity dam, headrace tunnels, a fish pass, feeder tunnels, surge and pressure shafts, and silt flushing tunnels.
✅The project consists of 8 turbines, each with 112.5 MW nameplate capacity.
✅Development status: The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2031.
24 528
✅Students who want the best examples for ethics and essays from newspapers on a daily basis can join this channel which has these collections.
Everyday spend 5 minutes on these quotes and examples case study, for better retention.
CLICK HERE TO JOIN
现已上线!2025 年 Telegram 研究 — 年度关键洞察 
