8 525
Repost from N/a
📚Oil and gas well drilling tools and services
U.S. Department of Labor
Occupational Safety & Health Administration 🇺🇸
📖86 pages
@HorizonOfPetroleumEngineering
17 11月, 08:43
A source on oil and gas well drilling ©If anything published on this channel infringes any patent, copyright, or other intellectual property rights claimed by third parties, please let us know and we will remove it. @Drilling_zone
显示更多In short, API Q1 addresses “how to build a quality product,” while API Q2 addresses “how to deliver a quality and reliable service.”📋 Key Requirements API Q2 focuses on the dynamic and high-risk nature of field services, and its key requirements include the following: - Service Delivery Planning: Each service activity must be systematically planned so that resources, processes, and acceptance criteria are defined. - Well-site Service Control: Given the variability of site conditions (such as well and weather conditions), dynamic control mechanisms must be established to ensure activities are performed under control. - Management of Change (MOC): A documented procedure is required to control any change during service delivery (changes in personnel, equipment, methods, and specifications). - Management of Service-Related Products: Spare parts and consumables used in the service must be subject to proactive management, inspection, and testing. - Emergency Preparedness and Response: For critical processes that may be disrupted, contingency plans (such as alternative resources) must be developed. - Risk Management: API Q2 places special emphasis on active risk management throughout the entire lifecycle of a service, from design and engineering to delivery and continual improvement. 📅 Versions and Updates The latest version of this standard is its third edition, published in September 2026. This edition has been improved compared with the second edition (2021) and has more precisely focused on well-site service-providing organizations. Some of the key changes in the third edition include: - Introduction of the concept of “Acceptable Performance Criteria (PAC).” - Updating purchasing requirements based on a risk-based approach. - Extension of the record retention period to 10 years (previously shorter). - Since the launch of the APIQR certification program in 2013, more than 250 companies worldwide have successfully obtained API Q2 certification. A webinar is scheduled to be held by the API to review the key changes to this important standard in the oil industry; we will publish its details soon.