Rajkamal Sir (Engineers Platform) 📚📚
الذهاب إلى القناة على Telegram
5 286
المشتركون
-224 ساعات
+237 أيام
+4430 أيام
أرشيف المشاركات
5. The adjustment of position of shading bands, in an energy meter is done to provide
4. In a 3-phase power measurement by two wattmeter method the reading of one of the wattmeter was zero. The power factor of the load must be
3. In a 3-phase power measurement by two wattmeter method, both the watt meters had identical readings. The power factor of the load was
2. In a low power factor wattmeter the compensating coil is connected
1. In a low power factor wattmeter the pressure coil is connected
5. The conductance and inductive susceptance of a circuit contain the similar magnitude. The power factor of circuit is ……..
4. If the access of a parallel ac. Circuit is amplified, the circuit current
3. The conductance and susceptance components of admittance are
2. If the source frequency in Fig. 4 is high, then …………
1. If the source rate in Fig. 4 is low, then ……..
1. The steam power plant efficiency can be improved by:
5. Belt conveyors can be employed for transporting coal at inclination up to:
4. Electrostatic precipitator is installed between:
2. As the size of the thermal power plant increases, the capital cost per kW of installed capacity:
