5. The auxiliary consumption of thermal power plants will be in the range:
4. Large size thermal power plants will be:
3. Generally the speed of turbine generators employed in thermal power plants will be in the range of:
2. Economizer is normally employed when boiler pressure exceeds:
1. The efficiency of the electro static precipitators will be of the order:
5. In thermal power plants the condenser used is of:
3. The sizing of the generator in power plant is based on:
4. Hydrogen cooling employed in large thermal power plant alternator:
3. For the flue gas flow, tick the correct sequence:
2. The pH value of the water used in boiler is:
1. in steam power plant which of the following component needs more maintenance: