ar
Feedback
API- Ace Petroleum Engineering

API- Ace Petroleum Engineering

الذهاب إلى القناة على Telegram

Initiative by IITians & Experts to guide aspirants for Petroleum Eng. CBT, GATE, SPE, PSUs..etc. & Interviews👔🎯 Website:- gateaceinpetroleumots.conductexam.com/ 📩 apigateinpetroleum@gmail.com ❤️FB-Apiace Est.Dt: 3-07-2019

إظهار المزيد
2 499
المشتركون
-124 ساعات
-77 أيام
-2430 أيام
أرشيف المشاركات
A rock containing a wide range of grain sizes implies to be sorted.
Anonymous voting

The pore fluid remains in communication with the surface under .
Anonymous voting

EROSIONAL VELOCITY OF FLOWING FLUID
EROSIONAL VELOCITY OF FLOWING FLUID

MSQ:: Advantage of FPSO incudes
Anonymous voting

Independent leg Jack Up rigs can not be used in
Anonymous voting

As only ONGC recruits via GATE "Petroleum Engineering".. What are the TOP rankers of GATE 2020 doing nowadays ​❓​
Anonymous voting

Which of the following statement is INCORRECT?
Anonymous voting

Which of the following is not translational movement of the Offshore Vessel?
Anonymous voting

If the pay zone is thick and beneath a village, which of the following well types is recommended?
Anonymous voting

_________is a remedial job required to repair faulty primary cementing at a later age of well life.
Anonymous voting

Oil well cement (OWC) is a powdery substance made of .
Anonymous voting

🕹Reading Topographic Maps📕
🕹Reading Topographic Maps📕

In electrical logging the measured resistivity of flushed zone is 19.2 ohm-m , the resistivity of mud filtrate is 1.33 ohm-m and computed value of residual oil saturation in flushed zone is 20%. What is the value of Formation Resistivity Factor?
Anonymous voting

Seismic wave velocity inside the Earth is found maximum at
Anonymous voting

🏆Dear Friends, GATE PE- RMS Test Series Tests- Drilling Technology-2 and Well Testing are online now with MSQ,MCQ &NAT type
🏆Dear Friends, GATE PE- RMS Test Series Tests- Drilling Technology-2 and Well Testing are online now with MSQ,MCQ &NAT type questions designed based on latest GATE 2021 pattern. Read the instruction carefully before attempting tests. No negative marking in MSQ & NAT questions. No partial marking in MSQ One third negative marking in MCQ. Give your Best.

Dear friends, as this year GATE exam has introduced one new type of question, we are adding "Multiple option correct type questions" in the tests of tests series, and so it took some time to design those type of questions. One or two question papers that are remaining as per schedule, will be uploaded by Sunday. Bear with us. Thanks -Team Ace Petroleum

From the above figure. The best method to remove Acid gases when the partial pressure at feed is high and partial pressure of
From the above figure. The best method to remove Acid gases when the partial pressure at feed is high and partial pressure of acid gas at the product is low?? 1- Selexol method 2- Sulfinol method 3- Physical method Comment below👇🏼

Identify the type of Heat Exchanger shown in the figure?? Comment below 🙄 A- U tube heat Exchanger B- Single pass heat excha
Identify the type of Heat Exchanger shown in the figure?? Comment below 🙄 A- U tube heat Exchanger B- Single pass heat exchanger C- Double pass heat exchanger D- Compact heat exchanger

Which type of valve is shown in Fig.? Comment below A- Globe B- Gate C- Needle D- Check Valve
Which type of valve is shown in Fig.? Comment below A- Globe B- Gate C- Needle D- Check Valve

A small handy instrument for detecting seismic waves used in seismic survey is called
Anonymous voting